 Issue dateTitleTopic
ML20045B35511 June 1993LER 93-001-00:on 930429,refueling Jib Crane Moved in Vicinity of Spent Fuel Pool Using vendor-supplied Lifting Eye in Violation of NUREG-0612.Caused by Failure to Identify Crane as Heavy Load.Meetings held.W/930611 LtrSafe Shutdown
Control of Heavy Loads
ML20024G71722 April 1991LER 91-001-00:on 910324,RB Normal Ventilation Sys (Rbnvs) Outboard Exhaust Valve Closed for No Apparent Reason.Cause Inconclusive.Sys Restored to Normal Lineup & Rbnvs Outboard Valve Will Be Stroked on Routine basis.W/910422 Ltr
ML20028H02328 September 1990LER 90-007-00:on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually separated.W/900928 Ltr
ML20012C51316 March 1990LER 86-029-02:on 860718,19,21 & 870508,loss of Reactor Protection Sys Power Occurred Due to Spurious Tripping of Alternate Feed EPA Breakers.Caused by Low Output Voltage of Alternate Feed Transformer.Output adjusted.W/900316 Ltr
ML20006E1579 February 1990LER 90-001-00:on 900117,unplanned Actuation of ESF Reactor Bldg Standby Ventilation Sys B Occurred,Causing Interlocking Relays in Control Circuits to Deenergize.Caused by Transient Voltage Dip.Procedures Re Bus Loads modified.W/900209 Ltr
ML19354D83312 January 1990LER 89-011-00:on 891222,unplanned Actuation of ESF Primary Containment Isolation Sys Occurred When Performing Sys Layup Implementation Package for Hpci.Caused by Inadequate Procedure.Breaker Positions changed.W/900112 Ltr
ML20005F86411 January 1990LER 89-010-00:on 891212,unplanned Actuation of ESF Control Room Air Conditioning Train a Occurred.Caused by Removal of Leads from Relay During Test to Prevent ESF Sys Actuations. Electrical Relay Replaced & Wiring Mod made.W/900111 Ltr
ML20011D23715 December 1989LER 89-009-00:on 891115,notification Received of Potential Failure Mechanism of Four 3-way Solenoid Operated Pilot Valves.Caused by Incorrect Mounting of Valves.Valves Remounted Vertically & Field Walkdown done.W/891215 Ltr
ML19332C55915 November 1989LER 89-008-00:on 891016,control Room Alarms Received Indicating Fire Pump Had Started & Deluge Valve Had Opened. Caused by Actuation of Manual Pull Station.Deluge Sys Restored to Normal & Personnel interviewed.W/891115 Ltr