Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20045G6672 July 1993RO:930702,unusual Event Declared When RCS Calculated Unidentified Leak Rate Exceeded 1 Gpm.Caused by Leakage from Reactor Coolant Pump Seal Injection Filter Drain Valve. Valves Corrected to Eliminate Leak
ML20043F2968 June 1990Special Rept SR-1-90-006-00:on 900509,discovered That Tech Spec Temp Limit for Main Steam Penetration Area Exceeded for Greater than 8 H.Caused by Inadequate Operating Procedure for Safeguards Bldg Ventilation Sys.Pipe Supports Insulated
ML20042E53416 April 1990Special Rept 1-SR-90-005-00:on 900404,positive Moderator Temp Coefficient Noted During Low Physics Testing Due to High Boron Concentration in Moderator.Rod Withdrawal Limits Imposed Per Tech Spec 3.1.1.3a,Action a.1
ML20012D95321 March 1990Special Rept 1-SR-90-002:on 900221,RCS Pressure Transient Resulted in Automatic Actuation of Pressurizer Porv.Caused by Failure of Procedure to Consider Variation in Plant Response for Stated Sys.Operating Procedure Will Be Revised
ML20012B85413 March 1990Special Rept:On 900312,ESF Actuation Signal Occurred Which Resulted in Initiation of Train a Safety Injection & RCS Pressure Transient.Caused by Failed Blocking Diode Due to Short.Plant Restored to Stabilized Condition
ML19309B85728 March 1980Supplemental Ro:Violation Found Re Piping Min Wall Thickness.Cause Unstated.Engineering Review in Progress. Progress Rept Will Be Submitted by 800418