Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21125A1404 May 2021OPC Document Request -Feb 2021Open Phase Condition
Time Critical Operator Action
JAFP-15-0146, Response to Ti 2515/190: Inspection of the Proposed Interim Actions Associated with Near-Term Task Force Recommendation 2.1 Flooding Hazard9 December 2015Response to Ti 2515/190: Inspection of the Proposed Interim Actions Associated with Near-Term Task Force Recommendation 2.1 Flooding Hazard
IR 05000333/20070012 March 2007Annual Assessment Letter - James A. Fitzpatrick Nuclear Power Plant (Report 05000333-07-001)Aging Management
License Renewal
IR 05000333/200600917 October 2006IR 05000333-06-009, James A. FitzPatrick Nuclear Generating Station; Ti 2515/168Affidavit
IR 05000333/20040052 February 2005IR 05000333-04-005, on 10/01/2004 -12/31/2004, James A. FitzPatrick Nuclear Power Plant; Post Maintenance Testing, Problem Identification and Resolution, Event Follow-upReactor Vessel Water Level
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Reserve Station Service Transformer
Temporary Modification
Qualified Offsite Circuit
Condition Adverse to Quality
Significance Determination Process
Large early release frequency
Excess Flow Check Valve
Operability Determination
Frazil ice
Pressure boundary leak
Offsite Circuit
Power change
Failure to Scram
IR 05000333/200101325 March 2002IR 05000333/2001-013, on 01/01 - 02/09/02; Entergy Nuclear Northeast, James A. FitzPatrick Nuclear Power Plant, Temporary Plant Modifications. Non-cited Violations NotedFitness for Duty
Contraband
Temporary Modification
Significance Determination Process
Job Performance Measure
Operability Determination
ML17037C20913 June 1974Letter Responding to the May 30, 1974 Letter Informing the Commission of the Corrective and Preventive Actions in Response to a May 15, 1974 Letter