05000247/FIN-2017010-01 | 31 December 2017 23:59:59 | Inadequate Diesel Fuel Oil Temperature Protection | FLEX Significance Determination Process Spent Fuel Pool Instrumentation |
05000286/FIN-2016009-01 | 31 December 2016 23:59:59 | 345 kV Insulator Failure Causes Reactor Trip | Significance Determination Process |
05000286/FIN-2016004-02 | 31 December 2016 23:59:59 | Inadequate Operability Evaluation of Leak in Service Water Pump Discharge Pipe | Internal Flooding Significance Determination Process Operability Assessment |
05000247/FIN-2016002-03 | 30 June 2016 23:59:59 | Failure to Maintain Flow Channeling Gates Closed in Accordance with the Containment Procedure | |
05000247/FIN-2015403-01 | 30 June 2015 23:59:59 | Security | |
05000247/FIN-2014002-04 | 31 March 2014 23:59:59 | Inappropriate Procedural Controls When Stopping RHR Without Assurance that RCS Loops Were Filled and Available for Natural Circulation Cooling | Significance Determination Process Fuel cladding |
05000247/FIN-2010005-09 | 31 December 2010 23:59:59 | Failure to Meet TS Oversight Requirement | Significance Determination Process |
05000286/FIN-2008004-01 | 30 September 2008 23:59:59 | Failure to Follow Procedures Results in the Inadvertent Start of Two Auxiliary Boiler Feed Pumps at Power | |
05000286/FIN-2008004-02 | 30 September 2008 23:59:59 | Failure to Follow Maintenance Procedures Results in Degraded EDG for 37 Days | |
05000247/FIN-2008004-01 | 30 September 2008 23:59:59 | Auxiliary Feedwater System Configuration Control Deficiencies |