Site | Start date | Title | Topic | |
---|---|---|---|---|
05000336/FIN-2018011-01 | Millstone | 30 September 2018 23:59:59 | Reviews of Incoming Industry Operation Experience Not Completed | |
05000336/FIN-2018003-01 | Millstone | 30 September 2018 23:59:59 | Failure to Assure that Safety-Related Service Water Piping Conformed to the Procurement Documents | |
05000336/FIN-2018403-01 | Millstone | 30 September 2018 23:59:59 | Security | |
05000336/FIN-2018410-01 | Millstone | 30 June 2018 23:59:59 | Security | |
05000423/FIN-2018010-05 | Millstone | 30 June 2018 23:59:59 | Inadequate Test Control of ECCS Valve Interlocks | |
05000336/FIN-2018010-04 | Millstone | 30 June 2018 23:59:59 | Flood Seals Not Installed in Unit 2 A EDG and Auxiliary Building Penetrations | Condition Adverse to Quality |
05000423/FIN-2018010-02 | Millstone | 30 June 2018 23:59:59 | Over-Duty Breakers on Safety-Related Bus 34C on Unit 3 | |
05000336/FIN-2018010-01 | Millstone | 30 June 2018 23:59:59 | Over-Duty Breakers on Safety-Related Buses on Unit 2 | |
05000336/FIN-2018010-03 | Millstone | 30 June 2018 23:59:59 | Failure to Correct Part 21 Power Supply Defects | |
05000423/FIN-2017004-01 | Millstone | 31 December 2017 23:59:59 | Failure to Maintain RCS Pressure during Solid Plant Cooldown | Significance Determination Process |
05000336/FIN-2017003-01 | Millstone | 30 September 2017 23:59:59 | Inadequate Procedure Results in Inadvertent Lowering of Spent Fuel Pool Level | Fuel cladding |
05000336/FIN-2017007-01 | Millstone | 30 September 2017 23:59:59 | Failure to Replace Auxiliary Feedwater Solenoid Valves within the Required Frequency | |
05000336/FIN-2017405-01 | Millstone | 30 June 2017 23:59:59 | Security | |
05000336/FIN-2017002-01 | Millstone | 30 June 2017 23:59:59 | Potential Untimely Corrective Action for Anchor Darling Double Disc Gate Valves | Anchor Darling |
05000336/FIN-2017403-01 | Millstone | 31 March 2017 23:59:59 | Security | |
05000336/FIN-2017403-02 | Millstone | 31 March 2017 23:59:59 | Security | |
05000336/FIN-2017403-03 | Millstone | 31 March 2017 23:59:59 | Security | |
05000336/FIN-2017403-04 | Millstone | 31 March 2017 23:59:59 | Security | |
05000336/FIN-2017403-05 | Millstone | 31 March 2017 23:59:59 | Security | |
05000336/FIN-2017001-03 | Millstone | 31 March 2017 23:59:59 | Licensee-Identified Violation | |
05000336/FIN-2017001-01 | Millstone | 31 March 2017 23:59:59 | Failure to Maintain CST Temperature in Accordance with Procedural Requirements | |
05000423/FIN-2017001-02 | Millstone | 31 March 2017 23:59:59 | Change of C Charging Pump Testing Requirements Contrary to ASME OM | Significance Determination Process |
05000336/FIN-2016004-01 | Millstone | 31 December 2016 23:59:59 | Routine Failure to Perform Engineering Evaluation of Long Term Scaffolding | Scaffolding |
05000336/FIN-2016004-02 | Millstone | 31 December 2016 23:59:59 | Failure to Maintain Licensed Operator Examination Integrity | Significance Determination Process Job Performance Measure |
05000423/FIN-2016004-03 | Millstone | 31 December 2016 23:59:59 | Untimely Corrective Action for Vital Inverters | Significance Determination Process |
05000336/FIN-2016004-04 | Millstone | 31 December 2016 23:59:59 | Licensee-Identified Violation | Maintenance Rule Program |
05000336/FIN-2016403-04 | Millstone | 30 September 2016 23:59:59 | Security | |
05000336/FIN-2016404-01 | Millstone | 30 September 2016 23:59:59 | Security | |
05000336/FIN-2016008-01 | Millstone | 30 September 2016 23:59:59 | Unapproved OMA in Lieu of Meeting III.G.2 Fire Protection Requirements for Fire Area R-14, Lower 4kV Switchgear Room and Cable Vault | Safe Shutdown Operator Manual Action Significance Determination Process Exemption Request Fire Protection Program |
05000336/FIN-2016008-02 | Millstone | 30 September 2016 23:59:59 | Licensee-Identified Violation | Safe Shutdown Unanalyzed Condition Significance Determination Process Thermoset |
05000336/FIN-2016008-03 | Millstone | 30 September 2016 23:59:59 | Licensee-Identified Violation | Safe Shutdown Unanalyzed Condition Significance Determination Process Thermoset |
05000423/FIN-2016008-04 | Millstone | 30 September 2016 23:59:59 | Licensee-Identified Violation | Safe Shutdown Unanalyzed Condition Significance Determination Process Thermoset |
05000336/FIN-2016403-01 | Millstone | 30 September 2016 23:59:59 | Security | |
05000336/FIN-2016403-02 | Millstone | 30 September 2016 23:59:59 | Security | |
05000336/FIN-2016403-03 | Millstone | 30 September 2016 23:59:59 | Security | |
05000336/FIN-2016403-05 | Millstone | 30 September 2016 23:59:59 | Licensee-Identified Violation | |
05000336/FIN-2016003-01 | Millstone | 30 September 2016 23:59:59 | Failure to Review Standing Orders | |
05000423/FIN-2016003-02 | Millstone | 30 September 2016 23:59:59 | Failure to Scope Safety Related Acoustic Valve Monitoring System into the Maintenance Rule | Maintenance Rule Program |
05000336/FIN-2016002-01 | Millstone | 30 June 2016 23:59:59 | Secondary Containment Inoperability Due to Inadequate Procedures | Significance Determination Process |
05000336/FIN-2016001-01 | Millstone | 31 March 2016 23:59:59 | Repetitive Failures to Correct Unit 3 Turbine Driven Auxiliary Feedwater Pump Performance Issues | |
05000336/FIN-2016001-02 | Millstone | 31 March 2016 23:59:59 | Failure of Feedwater Isolation Valve to Close Due to Electrical Jumper Being Installed | Significance Determination Process |
05000423/FIN-2016001-03 | Millstone | 31 March 2016 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000336/FIN-2015012-01 | Millstone | 31 December 2015 23:59:59 | Failure to Implement Procedural Guidance During a Loss of RCS Inventory | Significance Determination Process |
05000336/FIN-2015004-03 | Millstone | 31 December 2015 23:59:59 | Licensee-Identified Violation | Safe Shutdown Significance Determination Process |
05000336/FIN-2015004-02 | Millstone | 31 December 2015 23:59:59 | Turbine Driven Auxiliary Feedwater Pump Corrective Actions to Prevent Recurrence | Condition Adverse to Quality Significance Determination Process |
05000336/FIN-2015004-01 | Millstone | 31 December 2015 23:59:59 | Charging Packing Lubrication Pump Inadequate Operating Procedure Acceptance Criteria | Mission time Significance Determination Process |
05000336/FIN-2015012-03 | Millstone | 31 December 2015 23:59:59 | Procedure Failed to Direct Adequate Venting of SDC System | |
05000336/FIN-2015012-02 | Millstone | 31 December 2015 23:59:59 | Failure of the STA to Support the Crew During a Plant Cooldown | Significance Determination Process |
05000336/FIN-2015012-04 | Millstone | 31 December 2015 23:59:59 | Licensee-Identified Violation | Significance Determination Process |
05000336/FIN-2015003-03 | Millstone | 30 September 2015 23:59:59 | Licensee-Identified Violation | Weak link |