05000336/FIN-2017001-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Maintain CST Temperature in Accordance with Procedural Requirements |
Description | Green. The inspectors identified a Green NCV of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, for the failure to adequately implement Operating Procedure (OP) 2319B, Condensate Storage and Surge System. Specifically, Dominion failed to maintain the Millstone Unit 2 condensate storage tank (CST) temperature above procedural requirements. Dominion has documented this condition within their corrective action program (CAP) as condition report (CR) 1066291. The inspectors determined this finding was more than minor as it adversely affected the protection from external factors attribute of the Mitigating Systems cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The reliability of the mitigating systems heat removal function was challenged based upon the reasonable doubt of lost operability of the CST to provide a sufficient supply of water to the auxiliary feedwater (AFW) system. There was reasonable doubt of lost operability due to indications of CST water temperature below OP 2319B prescribed limitations, winter temperatures falling, and an inability to restore CST recirculation system in a timely manner. The finding was determined to be of very low safety significance (Green), when all screening questions were answered No as the conditions discussed in the Dominion engineering evaluation, approved on January 7, 2017, were capable of showing that no safety systems or functions were lost. This finding has a crosscutting aspect in the Problem Identification and Resolution, Resolution, in that Dominion did not take effective corrective actions or corrective maintenance to address CST recirculation pump degradation in a timely manner, prior to the onset of winter, commensurate with their safety significance such that operations could maintain CST water temperature above procedurally defined limitations. [P.3] |
Site: | Millstone |
---|---|
Report | IR 05000336/2017001 Section 1R01 |
Date counted | Mar 31, 2017 (2017Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.01 |
Inspectors (proximate) | C Highley H. Anagnostopoulus J Amberosini J Furia L Mckown S Pindale T Setzer |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion V |
CCA | P.3, Resolution |
INPO aspect | PI.3 |
' | |