Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21341A49022 November 2021WCS Consolidated Interim Storage Facility Revision 0 to Final Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, Part 1 of 3Hydrostatic
ML21341A46022 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment B, Flood Plain Report, Part 1 of 5
ML21341A46122 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment B, Flood Plain Report, Part 5 of 5
ML21341A46222 November 2021WCS Consolidated Interim Storage Facility Revision 0 to Final Safety Analysis Report, Chapter 2, Attachment G, Technical Specifications for Towers
ML21341A46522 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment B, Flood Plain Report, Part 2 of 5
ML21341A47022 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment D, Seismic Hazard Evaluation for WCS CISF
ML21341A47122 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment E, Geotechnical Investigation for WCS CISFEarthquake
ML21341A47322 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment B, Flood Plain Report, Part 4 of 5
ML21341A47522 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment C, Boring Logs
ML21341A47722 November 2021WCS Consolidated Interim Storage Facility Revision 0 to Final Safety Analysis Report, Chapter 2, Attachment H, Compiled Meteorological and Climatology DataHigh winds
ML21341A47922 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Table of Contents to Chapter 2High winds
Tornado Missile
Incorporated by reference
Tornado-Generated Missile
Aging Management
Safeguards Contingency Plan
Earthquake
ML21341A48022 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility, Chapter 2, Attachment B, Flood Plain Report, Part 3 of 5
ML21341A48122 November 2021Final Safety Analysis Report (FSAR) for the WCS Consolidated Interim Storage Facility
ML21341A48222 November 2021WCS Consolidated Interim Storage Facility Revision 0 to Final Safety Analysis Report, Chapters 3 to 15Safe Shutdown
High Radiation Area
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Emergency Lighting
Incorporated by reference
Finite Element Analysis
Decommissioning Funding Plan
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Job Performance Measure
Tornado Missile Protection
Design basis earthquake
Operability Determination
Safeguards Contingency Plan
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Scaffolding
ML21341A48422 November 2021WCS Consolidated Interim Storage Facility Revision 0 to Final Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, Part 2 of 3
ML21341A48522 November 2021Affidavits
ML21341A49222 November 2021WCS Consolidated Interim Storage Facility Revision 0 to Final Safety Analysis Report, Chapter 2, Attachment F, Evaluation of Halite Dissolution in the Vicinity of Waste Control Specialists Disposal Site, Andrews County, Tx, Part 3 of 3
ML20105A1387 April 2020Enclosure 7 - SAR Changed Pages