 Issue dateTitleTopic
ML22250A7097 September 2022Generation Station, Emergency Plan, Revision 74Safe Shutdown
Time of Discovery
Health Physics Network
High winds
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
FLEX
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Fire Protection Program
Grace period
Power change
Unidentified leakage
Siren
Overexposure
Potassium iodide
ML19246A27830 August 2019Independent Spent Fuel Storage Installation - Emergency Plan, Revision 64Safe Shutdown
Offsite Dose Calculation Manual
Battery sizing
ML16258A03114 September 2016PVNGS Units 1-3 - Notif of NRC Insp of the Implementation of Mitigation Strategies and Spent Fuel Pool Instr. Orders and Emer. Prep. Comm./Staffing/Multi-Unit Dose Assessment Plns(05000528/ 2016009;05000529/2016009;and 05000530/2016009) andSafe Shutdown
Safe Shutdown Earthquake
FLEX
Spent Fuel Pool Instrumentation
ML16253A0031 September 2016Independent Spent Fuel Storage Installation, Submittal of Emergency Plan Revision 57
ML16258A1361 September 2016Independent Spent Fuel Storage Installation, Emergency Plan, Rev. 57
ML15293A3359 October 2015Independent Spent Fuel Storage Installation (ISFSI) - Request for NRC Approval of Proposed Changed to Emergency Action LevelsSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
Power change
Unidentified leakage
ML02284030126 September 2002Letter Forwarding Emergency Plan Revision 27 and Associated Emergency Plan Implementing Procedures
ML02101034512 March 2002Emergency Plan Implementing Procedure Changes
ML01101032516 March 2001. Docket Nos. Stn 50-528/529/530 Emergency Plan Implementing Procedure Update. EPIP-07Safe Shutdown
Boric Acid
Fitness for Duty
Health Physics Network
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Met Tower
Operating Basis Earthquake
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Fuel cladding
Pressure Boundary Leakage
Backfit
Power change
Potassium iodide