Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000266/1999301 | 8 September 1999 | NRC Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL (Including Graded Tests) for Tests Administered on 990726-0802 | Safe Shutdown Boric Acid Shutdown Margin Grab sample Post Accident Monitoring Job Performance Measure Design basis earthquake Continuous fire watch Fire Watch Hourly Fire Watch Power change Water hammer |
IR 05000266/1998301 | 29 July 1998 | NRC Operator Licensing Exam Repts 50-266/98-301 & 50-301/98-301 (Including Completed & Graded Tests) for Tests Administered on 980622-25.One SRO License Applicant Passed All Portions of Exam & Issued Operating License | Boric Acid Shutdown Margin High Radiation Area Design basis earthquake Deep Dose Equivalent Loss of condenser vacuum |
IR 05000266/1997307 | 12 June 1997 | NRC Operator Licensing Exam Repts 50-266/97-307OL & 50-301/97-307OL for Tests Administered on 970514.Both License Applicants Passed Respective Exams & Were Issued RO Licenses | |
ML20147A780 | 23 January 1997 | NRC Operator Licensing Exam Repts 50-266/96-303OL & 50-301/96-303OL Administered During Wk of 961007 & Insp Conducted on 961120-27.Violation Noted.Exam Results:Three Out of Five ROs & Two Out of Two SROs Passed Exam | |
ML20059M323 | 10 November 1993 | Exam Rept 50-266/OL-93-02 Administered During Wk of 930927.Weakness Identified.Exam Results:Three RO & Three SRO Passed Exams & One RO Applicant Failed Written Exam | Job Performance Measure Fuel cladding |
ML20126B710 | 4 December 1992 | Exam Rept 50-266/OL-92-02 Administered on 920917 & 28-1002. Exam Results:Four SRO & Three RO Candidates Passed Written & Operational Exams | Temporary Modification Overspeed trip |
ML20059J758 | 12 September 1990 | Requalification Exam Rept 50-266/OL-90-02 on 900823.Exam Results:One Reactor Operator Passed Retake Exam | Job Performance Measure |
ML20246M950 | 12 July 1989 | Exam Rept 50-266/OL-89-03 on 890626-28.Exam Results:Reactor Operator Candidate Failed Exam | |
ML20246G957 | 7 July 1989 | Exam Repts 50-266/OL-89-04 & 50-301/OL-89-04 Administered on 890626-28.Exam Results:Senior Reactor Operator Passed Exam. Copy of Exam Encl | Boric Acid Shutdown Margin Overspeed trip |
ML20247H646 | 22 May 1989 | Exam Repts 50-266/OL-89-02 & 50-301/OL-89-02 on 890517.Exam Results:One Senior Reactor Operator & Three Reactor Operators Passed Written Exams | |
ML20248G570 | 31 March 1989 | Exam Repts 50-266/OL-89-01 & 50-301/OL-89-01 on 890227-0303. Exam Results:All Operators Passed Operating Exams & Three Reactors & Four Senior Reactor Operators Passed Written Exams & Three Reactor & Two Senior Operators Failed Exams | Boric Acid Shutdown Margin Job Performance Measure Hourly Fire Watch Overspeed trip |
ML20205A523 | 17 October 1988 | Exam Repts 50-266/OL-88-01 & 50-301/OL-88-01 on 880912-16. Exam Results:Four Out of Five Reactor Operator Candidates & Two Out of Three Reactor Operator Candidates Passed Exams. Master Copy of Exam Encl | Boric Acid Shutdown Margin Feedwater Heater Water hammer |
ML20207R994 | 12 March 1987 | Exam Repts 50-266/OL-87-01 & 50-301/OL-87-01 on 870217-19. Exam Results:All Five Reactor Operator Candidates & One Senior Reactor Operator Upgrade Candidate Passed | Shutdown Margin Fuel cladding Power change Water hammer |