Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000331/1999302 | 25 October 1999 | NRC Operator Licensing Exam Rept 50-331/99-302OL(including Completed & Graded Tests) for Tests Administered on 990920- 24.Six Applicants Passed Exam & Were Issed Operating Licenses | Safe Shutdown Loop seal High Radiation Area Temporary Modification Squib Locked High Radiation Area Job Performance Measure Scram Discharge Volume Overtravel Failure to Scram |
IR 05000331/1999301 | 13 July 1999 | NRC Operator Licensing Exam Rept 50-331/99-301OL (Including Completed & Graded Tests) for Tests Administered on 990525. Written Retake Exam Administered by Licensee to One Applicant.Applicant Passed Exam & Issued RO License | Safe Shutdown Loop seal Slow transfer Post Accident Monitoring Temporary Modification Squib Overtravel Earthquake Fuel cladding Downpower Unidentified leakage |
IR 05000331/1998020 | 29 December 1998 | Licensed Operator Requalification Training Program Insp Rept 50-331/98-20 Conducted on 981204.Exam Results:Two Operating Crews Passed Operating Portion of Exam.One SRO & Two ROs Failed Written Exam | Probabilistic Risk Assessment Job Performance Measure Systematic Assessment of Licensee Performance |
IR 05000321/1997300 | 4 April 1997 | NRC Operator Licensing Exam Repts 50-321/97-300 & 50-366/97-300 on 970314-20.Exam Results:All Candidates Passed Exam | Safe Shutdown Half scram Squib Job Performance Measure Overtravel |
ML20059F795 | 7 January 1994 | Exam Rept 50-331/OL-93-02 on 931206.Exam Results:Six RSOs & Three ROs Administered Exams.Two SROs & Four ROs Completed Crew Compositions | Job Performance Measure |
ML20058A636 | 5 November 1993 | Exam Rept 50-321/93-301 on 930927-1006 for Units 1 & 2.Exam results:15 SROs & 10 ROs Passed Written & Operating Exams | |
IR 05000321/1993300 | 19 March 1993 | Exam Rept 50-321/93-300 on 930218-25.Exam Results:Seven Senior Reactor Operators Passed Initial Exam & One Senior Reactor Operator Passed Requalification Retake Exam.No Violations or Deviations Noted | Shutdown Margin Reactor Vessel Water Level High Radiation Area Squib Job Performance Measure Spiral reload Fuel cladding |
IR 05000366/1990027 | 15 October 1990 | Exam Rept 50-366/90-27OL on 901003.Exam Results:Reactor Operator Candidate Passed Written Exam & Issued Reactor Operator License on 901009 | |
ML20247C954 | 30 August 1989 | Exam Rept 50-321/OL-89-01 on 890612-16.Exam Results:Nine Senior Reactor Operators & Two Reactor Operators Passed Exam.Three Senior Reactor Operators Failed Exams | Shutdown Margin Reactor Vessel Water Level Loop seal Half scram Squib Scram Discharge Volume Fire Protection Program |
ML20148M476 | 29 March 1988 | Exam Rept 50-321/OL-88-01 on 880208-11 for Units 1 & 2.Exam results:11 Senior Reactor Operators & Three Reactor Operators Passed Both Written & Operating Exams | |
ML20238A104 | 13 August 1987 | Exam Rept 50-331/OLS-87-01 on 870715-16.Exam Results:Both Senior Reactor Operator Candidates Passed Written & Oral Exams | High Radiation Area Hydrostatic Overtravel Fire Watch Power change |
ML20215J915 | 19 June 1987 | Exam Rept 50-321/OL-87-01 on 870420-23.Exam Results:Eight Senior Reactor Operators Passed Written & Operating Exams. Exam Questions,Answer Key & Util Comments Encl | |
ML20210F790 | 6 February 1987 | Exam Rept 50-331/OL-86-03 on 861216-19.Exam Results:Two Reactor Operator Candidates Administered & Passed Written & Oral Exams.Exam & Answer Key Encl | Reactor Vessel Water Level High Radiation Area Locked High Radiation Area Power change Downpower |
ML20212R077 | 20 January 1987 | Exam Rept 50-331/OL-86-02 on 861216-19.Exam Results:Six of Seven Senior Reactor Operators & Three Reactor Operators Passed Requalification Exams.Exam & Answer Key Encl | |
ML20215N033 | 27 October 1986 | Exam Rept 50-321/OL-86-02 on 860903-05.Exam Results:All Four Reactor Operators Passed.Related Info Encl | Fuel cladding |
ML20212K074 | 11 August 1986 | Exam Rept 50-331/OL-86-01 on 860624-26.Exam Results:All Reactor Operator & Senior Operator Candidates Passed | Reactor Vessel Water Level High Radiation Area Half scram Fire Barrier Squib Locked High Radiation Area Scram Discharge Volume Continuous fire watch |
ML20203D703 | 4 April 1986 | Exam Rept 50-321/OL-86-01 on 860217-20.Exam Results:All Three Candidates Passed Both Written & Simulator Exams | |
ML20137K610 | 21 January 1986 | Exam Rept 50-331/OL-85-02 on 851105-07.Exam Results:Six Out of Eight Senior Reactor Operators Passed Written & Oral Exams,One Failed Oral Exam & Another Failed Written Exam | Shutdown Margin Scram Discharge Volume Overtravel Fuel cladding |
ML20134B117 | 30 October 1985 | Exam Rept 50-321/OL-85-03 on 851015-17.Exam Results:One Candidate Passed Simulator Exam & Two Failed.Six Candidates Passed Written Exam | |
ML20135G402 | 29 August 1985 | Exam Rept 50-321/OL-85-02 on 850715-18.Exam Results:All Three Candidates Passed Certification Exam & Six Senior Reactor Operators & Three Reactor Operators Passed Requalification Exams | |
ML20127G598 | 2 April 1985 | Exam Rept 50-321/OL-85-01 on 850311-14.Exam Results:All Candidates Passed Replacement Exams & Four Senior Reactor Operators & Fire Reactor Operators Passed Requalification Exams |