Semantic search
Jump to navigation
Jump to search
Start date | Reporting criterion | Title | Event description | System | LER | |
---|---|---|---|---|---|---|
ENS 57243 | 23 July 2024 04:00:00 | 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | Part 21 Report - NON-COMPLIANT Insulated Conductor | The following is a synopsis of information received via fax: A reel of insulated conductor was found non-compliant due to failure of insulation tensile and elongation at break test following air oven aging. Wire from the non-compliant reel was delivered to 9 plants. Affected plants: Wolf Creek, Dresden, LaSalle, Limerick, Peach Bottom, Arkansas Nuclear One, Waterford, Susquehanna, and Davis Besse Reporting company point of contact: RSSC Wire and Cable LLC dba Marmon Industrial Energy and Infrastructure 20 Bradley Park Road East Granby, CT 06026 Phillip Sargenski - Quality Assurance Manager Phone: 860-653-8376 Fax: 860-653-8301 Phillip.sargenski@marmoniei.com |