Semantic search

Jump to navigation Jump to search
 Start dateReporting criterionTitleEvent descriptionSystemLER
ENS 515075 May 2015 04:00:0010 CFR 21.21(d)(3)(i), Failure to Comply or DefectPart 21 Report - Defect Associated with Pressurizer Instrumentation Piping Penetration in Module for Vogtle Unit 3The following information was excerpted from an email received from CB&I: This letter provides a report in accordance with 10 CFR 21.21 pertaining to the identification of a defect associated with a structural module piping penetration for the Vogtle Unit 3 AP1000 project. The defect is associated with a Pressurizer instrumentation piping penetration in structural module CA01 for Vogtle Unit 3. This condition was previously identified by interim report letters dated July 1, 2015, and September 2, 2015. The discovery date of these deviations is based on the date of the associated CB&I Power Inspection Report (IR). That IR was initiated on May 5, 2015. Interim Part 21 reports dated July 1, 2015, and September 2, 2015, were submitted to the NRC that state the evaluation of this condition was expected to be completed by October 30, 2015. The interim reports were identified as Accession Nos. ML15254A043 and ML15201A130, and Log Nos. 2015-50-01 and 2015-50-00, on the NRC 'Part 21 Reports' website. Name and address of the individual or individuals informing the Commission: Don DePierro CB&I Power 128 S. Tryon St., Suite 1000 Charlotte, NC 28202