Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20023A76015 October 1982Forwards Final Draft of Amend 28 to Psar,Consisting of Responses to NRC Questions 231.5,231.14 & 231.15,revisions to PSAR Section 2.5 & Apps 2K & 2R.W/25 Oversize Figures. Aperture Cards Are Available in PDR
ML20052H67919 May 1982Forwards Catalog of Borehole Lithologic Logs from 600 Area, Hanford Site.
ML20054D84621 April 1982Forwards Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa, Per 820317 Meeting
ML20042C54329 March 1982Forwards Responses to Comments Received on Geology & Geotechnical Engineering at 820317 Meeting.Formal Responses Will Be Submitted on 820419 W/Amend 24 to PSARUltimate heat sink
Earthquake
ML20042C08324 March 1982Submits Geologic & Geophysical Data on Southeast Anticline, Per 820312 Telcon Request.Geophysical Data Northwest of Line 3 Consists of Gravity & Land Magnetic Data.Gravity Profile Will Be Provided on 820317
ML20042C01723 March 1982Advises That Informal Responses to 820311 Request for Addl Info Re Geotechnical Engineering Were Provided at 820317 Meeting.Formal Responses Will Be Provided by 820329
ML20041E6834 March 1982Forwards Responses to NRC 820212 & 25 Questions Re Amend 23 to Psar.Formal Response Will Be Submitted on 820419 W/ Submittal of Amend 24 to PSARSafe Shutdown
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Finite Element Analysis
Tornado-Generated Missile
Tornado Generated Missile
Earthquake
Turbine Missile
ML20069C2882 March 1982Forwards Conclusions Re Presence of Faulting on Southwest Flank of Southeast Anticline,Per 820211 Conversations. Enumerates by Data Line Bases for Statements Re Southeast Anticline Fault in Apps 2K & 2R of PSAR Amend 23
ML20041B48422 February 1982Forwards Figure Submitted to Wppss in Response to WNP-2 Question 360.20b Showing Geologic/Geophysical Data Locations in Vicinity of Gable Mountain in Southeast Anticline,Per 820218 Telcon
ML20040C39620 January 1982Forwards State of Wa Nln Dept of Ecology EIS for Proposed Hazardous Waste Regulation Wac 173-302 & Proposed Hazardous Waste Disposal Site on Hanford Reservation
ML20039F7406 January 1982Requests Comments on Encl Outline for Review of Util Site Selection Process Leading to Application for CP & OL on Hanford Nuclear Reservation
ML20038C5489 December 1981Forwards Amend 18 to WPPSS-2 FSAR for Use in Review of Amend 23 to Skagit/Hanford PSAR
ML20010H75923 September 1981Notifies That Amend 22 to PSAR Has Been Sent Under Separate Cover,In Response to NRC Request
ML20010A3476 August 1981Confirms 810624 Telcon Re Authorization to Use Wpps Unit 2 Meteorological Data for Facilities Environ Rept & PSAR Site Relocation Amends
ML19320C0728 July 1980Informs NRC That Four Private Utils Have Formed wholly-owned Engineering & Const Company to Perform Engineering,Licensing & Const Svcs for Major Generating Projects.Company Will Be Activated on 800715.Press Release Encl
ML19256E33225 September 1979Forwards Supplemental Testimony Re Methods Used to Measure Ground MotionEarthquake
ML19246B1872 July 1979Forwards Draft Case Study Re Protection of Wild & Scenic Rivers,To Be Used in Factbook Being Prepared Under Contract W/Doe