Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20023A760 | 15 October 1982 | Forwards Final Draft of Amend 28 to Psar,Consisting of Responses to NRC Questions 231.5,231.14 & 231.15,revisions to PSAR Section 2.5 & Apps 2K & 2R.W/25 Oversize Figures. Aperture Cards Are Available in PDR | |
ML20052H679 | 19 May 1982 | Forwards Catalog of Borehole Lithologic Logs from 600 Area, Hanford Site. | |
ML20054D846 | 21 April 1982 | Forwards Paleomagnetic Investigation of Pre-Missoula Gravels,Pasco Basin & Vicinity,Wa, Per 820317 Meeting | |
ML20042C543 | 29 March 1982 | Forwards Responses to Comments Received on Geology & Geotechnical Engineering at 820317 Meeting.Formal Responses Will Be Submitted on 820419 W/Amend 24 to PSAR | Ultimate heat sink Earthquake |
ML20042C083 | 24 March 1982 | Submits Geologic & Geophysical Data on Southeast Anticline, Per 820312 Telcon Request.Geophysical Data Northwest of Line 3 Consists of Gravity & Land Magnetic Data.Gravity Profile Will Be Provided on 820317 | |
ML20042C017 | 23 March 1982 | Advises That Informal Responses to 820311 Request for Addl Info Re Geotechnical Engineering Were Provided at 820317 Meeting.Formal Responses Will Be Provided by 820329 | |
ML20041E683 | 4 March 1982 | Forwards Responses to NRC 820212 & 25 Questions Re Amend 23 to Psar.Formal Response Will Be Submitted on 820419 W/ Submittal of Amend 24 to PSAR | Safe Shutdown Ultimate heat sink Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Coatings Operating Basis Earthquake Finite Element Analysis Tornado-Generated Missile Tornado Generated Missile Earthquake Turbine Missile |
ML20069C288 | 2 March 1982 | Forwards Conclusions Re Presence of Faulting on Southwest Flank of Southeast Anticline,Per 820211 Conversations. Enumerates by Data Line Bases for Statements Re Southeast Anticline Fault in Apps 2K & 2R of PSAR Amend 23 | |
ML20041B484 | 22 February 1982 | Forwards Figure Submitted to Wppss in Response to WNP-2 Question 360.20b Showing Geologic/Geophysical Data Locations in Vicinity of Gable Mountain in Southeast Anticline,Per 820218 Telcon | |
ML20040C396 | 20 January 1982 | Forwards State of Wa Nln Dept of Ecology EIS for Proposed Hazardous Waste Regulation Wac 173-302 & Proposed Hazardous Waste Disposal Site on Hanford Reservation | |
ML20039F740 | 6 January 1982 | Requests Comments on Encl Outline for Review of Util Site Selection Process Leading to Application for CP & OL on Hanford Nuclear Reservation | |
ML20038C548 | 9 December 1981 | Forwards Amend 18 to WPPSS-2 FSAR for Use in Review of Amend 23 to Skagit/Hanford PSAR | |
ML20010H759 | 23 September 1981 | Notifies That Amend 22 to PSAR Has Been Sent Under Separate Cover,In Response to NRC Request | |
ML20010A347 | 6 August 1981 | Confirms 810624 Telcon Re Authorization to Use Wpps Unit 2 Meteorological Data for Facilities Environ Rept & PSAR Site Relocation Amends | |
ML19320C072 | 8 July 1980 | Informs NRC That Four Private Utils Have Formed wholly-owned Engineering & Const Company to Perform Engineering,Licensing & Const Svcs for Major Generating Projects.Company Will Be Activated on 800715.Press Release Encl | |
ML19256E332 | 25 September 1979 | Forwards Supplemental Testimony Re Methods Used to Measure Ground Motion | Earthquake |
ML19246B187 | 2 July 1979 | Forwards Draft Case Study Re Protection of Wild & Scenic Rivers,To Be Used in Factbook Being Prepared Under Contract W/Doe |