NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings
From kanterella
(Redirected from ML14287A343)
Jump to navigation
Jump to search
Similar Documents at Indian Point | |
---|---|
Category:Drawing
MONTHYEARML20259A2102020-09-14014 September 2020
[Table view]Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures NL-16-109, Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures2016-09-19019 September 2016 Indian Point, Unit 2, Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A1942016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Figures ML16280A1922016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Drawings ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings ML16280A1882016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Figures ML16280A1912016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 6, Engineered Safety Features, Figures ML16280A1972016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems, Figures ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A1672016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Figures ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures ML16280A1662016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings NL-14-121, Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures2014-09-17017 September 2014 Indian Point, Unit 2, Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML14287A3432014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8, Drawings ML14287A3562014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 11, Figures ML14287A3512014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Drawings ML14287A3502014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 10, Figures ML14287A3482014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 9, Drawings ML14287A3472014-09-17017 September 2014 Updated Final Safety Analysis Report,(Ufsar), Revision 25, Chapter 9, Figures ML14287A3422014-09-17017 September 2014 Updated Final Safety Analysis Report, (Ufsar), Revision 25, Chapter 8 - Figures ML11236A2262010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Table of Contents - Chapter 7, Page 18 of 108 ML11236A2272010-10-0606 October 2010 Partially Released Updated Final Safety Analysis Report for Indian Point Unit 2. (Redacted Information: Figures 5.1-2, 5.1-3, 5.1-4, 5.1-5, 5.1-6 & 5.1-7 Are All Plant Drawings). Chapter 7, Page 19 of 108 - Chapter 14 Figure 14.3-129 ML1012603792010-05-0606 May 2010 Drawing No. A205454, Revision 4, Containment Building Restraint & Support Design, Line 351. ML1000402912010-01-0404 January 2010 Chemical and Volume Control System - Sheet 1, Figure 9.2-1 ML11083A0542009-03-0606 March 2009 Lr Hearing - Slides from ACRS Subcommittee Meeting on March 4, 2009 NL-08-074, Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074)2008-04-30030 April 2008 Amendment 4 to License Renewal Application (LRA) Letter Dated April 30, 2008 from Entergy Nuclear Northeast (NL-08-074) ML0904008952008-02-29029 February 2008 No. 3 Nuclear Power Plant - Electrical Distribution & Transmission System Diagram 2020-09-14 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22257A1272022-09-14014 September 2022
[Table view]Biennial Defueled Safety Analysis Report Update, and Regulatory Commitment Change Summary - September 2020 to September 2022 ML20259A2022020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 1, Introduction and Summary ML20259A2072020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 6, Safety Analysis ML20259A2152020-09-14014 September 2020 Defueled Safety Analysis Report, Table of Contents ML20259A2122020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, License Renewal ML20259A2112020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 11, Figures ML20259A2032020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 2, Site and Environment ML20259A2012020-09-14014 September 2020 Summary Report of Indian Point Unit 2 Updated Final Safety Analysis Report, Revision 27 to Defueled Safety Analysis Report, Revision 0, Changes ML20259A2142020-09-14014 September 2020 Defueled Safety Analysis Report, Instructions and Key to Unit 2 DSAR Revision 0 ML20259A2062020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 5, Conduct of Facility Activities ML20259A2102020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapters 3 Through 5, Figures ML20259A2092020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 2, Figures ML20259A2132020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix B, Technical Requirements Manual (TRM) ML20259A2082020-09-14014 September 2020 Updated Final Safety Analysis Report, Chapter 1, Figures ML20259A2052020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 4, Waste Disposal and Radiation Protection System ML20259A2042020-09-14014 September 2020 Defueled Safety Analysis Report, Chapter 3, Facility Design and Operation ML20259A2162020-09-14014 September 2020 Defueled Safety Analysis Report, Appendix a, Permanently Defueled Technical Specifications Bases NL-18-069, Submittal of Revision 27 to Updated Final Safety Analysis Report2018-09-17017 September 2018 Submittal of Revision 27 to Updated Final Safety Analysis Report ML17354A0152017-11-28028 November 2017 Enclosure 2 - NET-28091-003-01NP, Rev. 0, Criticality Safety Analysis for the Indian Point Unit 2 Spent Fuel Pool with No Absorber Panel Credit IR 05000247/20160092016-11-21021 November 2016 Davis-Besse Nuclear Power Station, Unit 1, Revision 31 to Updated Final Safety Analysis Report, Drawing E-0058B, Rev 12, Sheet 0015A ML16280A2082016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Drawing No. 9321-F-2736-130 to Drawing No. 138248-9 ML16280A1652016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 3, Reactor, Figures ML16280A2072016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 9, Auxiliary and Emergency Systems, Figures 9.2-1 to 9.9-1 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-672016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.0-1 to 14.1-67 ML16280A1952016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 7, Instrumentation and Control, Drawings NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-752016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 12, Conduct of Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-92016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figure 10.1-1, Revision 21 to Figure 10.2-9 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-72016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 10, Steam and Power Conversion System, Figures 10.2-1 to 10.2-7 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-52016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Figure 11.1-1 to Figure 11B-5 NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 13, Tests and Operations NL-16-109, Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis2016-09-19019 September 2016 Indian Point Unit No. 2 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2202016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis, Figures 14.2-0 to 14.2-18 ML16280A2242016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 17, Table of Contents ML16280A2232016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 16, Instructions and Key ML16280A1962016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 8, Electrical Systems ML16280A2222016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 15, Appendix a, License Renewal ML16280A1532016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 ML16280A2142016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System, Drawing No. 9321-F-2719-136 to Drawing No. 9321-F-2730-75 ML16280A1682016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 4, Reactor Coolant System, Drawings ML16280A1892016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems, Drawing ML16280A2122016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 11, Waste Disposal and Radiation Protection System ML16280A1592016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary ML16280A2172016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26, Chapter 14, Safety Analysis ML16280A2062016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 9, Auxiliary and Emergency Systems ML16280A1872016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 5, Containment Systems ML16280A1602016-09-19019 September 2016 Amendment Update to the Updated Final Safety Analysis Report (Ufsar), Revision 26 - Chapter 1, Introduction and Summary, Figures 2022-09-14 |