Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20296A2766 October 2020Lake Engineering Co. - Third Interim Notification Per 10 CFR Part 21 - Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293
ML19080A0598 March 2019Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors
ML19029A15527 December 201810 CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0123, Rev. 1
ML18353A42830 November 2018Engine Systems, Inc., 10CFR21-0123, Rev. 0, for a 10CFR21 Reportable Condition on Emd Fuel and Soakback Pumps
ML17355A1395 December 2017Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Final Report Per 10 CFR Part 21
ML17081A45320 March 2017Part 21 - Plastic Jar Dedication Sampling
ML16313A06218 October 2016C&D Technologies, Inc. - 10 CFR Part 21 Evaluation Regarding Terminal Welding Failure in 3DCU-9 Batteries
ML16252A27429 August 2016Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay
ML15134A0161 May 2015Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays
ML14204A70723 July 2014Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV
ML14210A01023 July 2014Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot ValveSafe Shutdown
Shutdown Margin
Scram Discharge Volume
ML13165A34212 June 201360-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers
ML13044A0758 February 2013Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology
ML12347A30812 December 2012Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology
ML12319A01227 September 2012Error in Main Steam Line High Flow Calculational Methodology
ML12158A4476 June 2012Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld
ML12094A3712 April 2012Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations
ML11270006726 September 2011GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer GuidanceSafe Shutdown Earthquake
Channel-control blade interference
ML1025202193 September 2010Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer GuidanceSafe Shutdown Earthquake
Operating Basis Earthquake
Channel-control blade interference
ML10153056428 May 2010Part 21 Notification from C & D Technologies, Inc., Post Corrosion on Dcu Batteries
ML0506302442 March 2005Part 21 Report Concerning MCPR Limits and MCPR Monitoring