Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23257A12219 September 2023Authorization and Safety Evaluation for Alternative Request for Valve 251130Incorporated by reference
Grace period
ML23207A1761 August 2023Authorization and Safety Evaluation for Relief Request 4RR-10Surveillance Frequency Control Program
ML21095A30419 April 2021Relief Request 4RR-02 Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell WeldsIncorporated by reference
ML16069A19910 May 2016Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 Through MF6307)VT-2
Incorporated by reference
PLA-7418, Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-2110 December 2015Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-21
ML15183A39610 July 2015Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Relief Requests for the Third Ten-Year Inservice Inspection Interval (TAC Nos. MF6302 Through MF6307)VT-2
ML15098A47828 April 2015Relief Requests 4RR-01: Use of a Risk-Informed Inservice Inspection Alternative for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF5097 and MF5098)Internal Flooding
Probabilistic Risk Assessment
Nondestructive Examination
Large early release frequency
Exemption Request
Dissimilar Metal Weld
ML14141A0739 June 2014Relief Requests for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF2705 Through MF2714)Nondestructive Examination
VT-2
Incorporated by reference
ML14122A19722 May 2014Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2912 and MF2915)Safe Shutdown
Hydrostatic
Power-Operated Valves
Grace period
ML13326A00227 November 2013Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2915)
ML12046A04623 February 2012Relief Request No. 3RR-18, Regarding Relief from the Requirements of the ASME Code for Successive InspectionsScaffolding
PLA-5960, Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans29 September 2005Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program PlansInternal Flooding
Probabilistic Risk Assessment
ML05199033028 July 2005Code Relief, Third 10-Year Inservice Inspection Interval Program PlanNon-Destructive Examination
Probabilistic Risk Assessment
Nondestructive Examination
VT-2
Incorporated by reference
Dissimilar Metal Weld
ML05122056822 June 2005Relief from American Society of Mechanical Engineers (ASME) Code, Section XI, Appendix Viii, Supplement 11 Requirements and Code Case N-504-2 and N-638 RequirementsWeld Overlay
Nondestructive Examination
Incorporated by reference
Dissimilar Metal Weld
ML0503202501 February 2005Third 10-Year Inservice Inspection Interval Program PlanVT-2
Incorporated by reference
ML05031040631 January 2005Relief for Qualification Requirements for Dissimilar Metal Piping Welds (Tac Nos. MC4027 and MC4028)Weld Overlay
Incorporated by reference
Dissimilar Metal Weld
PLA-5837, Response to Request for Additional Information from NRC on Proposed Relief Request Nos. RR-01, RR-02, RR-04, & RR-05 to the Third Ten-year In-service Testing Program for Pumps and Valves for Susquehanna Ses Units 1 & 26 December 2004Response to Request for Additional Information from NRC on Proposed Relief Request Nos. RR-01, RR-02, RR-04, & RR-05 to the Third Ten-year In-service Testing Program for Pumps and Valves for Susquehanna Ses Units 1 & 2Safe Shutdown
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
ML04268007824 September 2004Third 10-Year Inservice Inspection Interval Program PlanVT-2
Incorporated by reference
ML04273033820 September 2004Third Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-006
PLA-5806, Proposed Revision to Relief Requests Irroi and 2RR01 for Proposed Third Ten-year Interval Inservice Testing Program Plans10 September 2004Proposed Revision to Relief Requests Irroi and 2RR01 for Proposed Third Ten-year Interval Inservice Testing Program PlansInternal Flooding
Probabilistic Risk Assessment
PLA-5783, Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-578314 July 2004Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783Dissimilar Metal Weld
PLA-5744, Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-57448 April 2004Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-5744Weld Overlay
Dissimilar Metal Weld
ML03044040913 February 2003Relief Request for Authorization to Use Sample Disassembly and Inspection Program as an Alternative to the ASME Code, Section XI, Requirements
PLA-5543, Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 227 November 2002Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2