Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23257A122 | 19 September 2023 | Authorization and Safety Evaluation for Alternative Request for Valve 251130 | Incorporated by reference Grace period |
ML23207A176 | 1 August 2023 | Authorization and Safety Evaluation for Relief Request 4RR-10 | Surveillance Frequency Control Program |
ML21095A304 | 19 April 2021 | Relief Request 4RR-02 Regarding Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds | Incorporated by reference |
ML16069A199 | 10 May 2016 | Relief Requests for the Third 10-Year Inservice Inspection Interval (CAC Nos. MF6302 Through MF6307) | VT-2 Incorporated by reference |
PLA-7418, Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-21 | 10 December 2015 | Response to Request for Additional Information for the Third Interval Relief Requests 3RR-19, 3RR-20 and 3RR-21 | |
ML15183A396 | 10 July 2015 | Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Relief Requests for the Third Ten-Year Inservice Inspection Interval (TAC Nos. MF6302 Through MF6307) | VT-2 |
ML15098A478 | 28 April 2015 | Relief Requests 4RR-01: Use of a Risk-Informed Inservice Inspection Alternative for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF5097 and MF5098) | Internal Flooding Probabilistic Risk Assessment Nondestructive Examination Large early release frequency Exemption Request Dissimilar Metal Weld |
ML14141A073 | 9 June 2014 | Relief Requests for the Fourth 10-Year Inservice Inspection Interval (TAC Nos. MF2705 Through MF2714) | Nondestructive Examination VT-2 Incorporated by reference |
ML14122A197 | 22 May 2014 | Relief Requests for the Fourth 10-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2912 and MF2915) | Safe Shutdown Hydrostatic Power-Operated Valves Grace period |
ML13326A002 | 27 November 2013 | Supplemental Information Needed for Acceptance of Requested Licensing Action Proposed Relief Requests for the Fourth Ten-Year Inservice Testing Interval (TAC Nos. MF2905 Through MF2915) | |
ML12046A046 | 23 February 2012 | Relief Request No. 3RR-18, Regarding Relief from the Requirements of the ASME Code for Successive Inspections | Scaffolding |
PLA-5960, Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans | 29 September 2005 | Relief Requests 1RR06 and 2RR06 for Third Ten-Year Interval Inservice Testing Program Plans | Internal Flooding Probabilistic Risk Assessment |
ML051990330 | 28 July 2005 | Code Relief, Third 10-Year Inservice Inspection Interval Program Plan | Non-Destructive Examination Probabilistic Risk Assessment Nondestructive Examination VT-2 Incorporated by reference Dissimilar Metal Weld |
ML051220568 | 22 June 2005 | Relief from American Society of Mechanical Engineers (ASME) Code, Section XI, Appendix Viii, Supplement 11 Requirements and Code Case N-504-2 and N-638 Requirements | Weld Overlay Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML050320250 | 1 February 2005 | Third 10-Year Inservice Inspection Interval Program Plan | VT-2 Incorporated by reference |
ML050310406 | 31 January 2005 | Relief for Qualification Requirements for Dissimilar Metal Piping Welds (Tac Nos. MC4027 and MC4028) | Weld Overlay Incorporated by reference Dissimilar Metal Weld |
PLA-5837, Response to Request for Additional Information from NRC on Proposed Relief Request Nos. RR-01, RR-02, RR-04, & RR-05 to the Third Ten-year In-service Testing Program for Pumps and Valves for Susquehanna Ses Units 1 & 2 | 6 December 2004 | Response to Request for Additional Information from NRC on Proposed Relief Request Nos. RR-01, RR-02, RR-04, & RR-05 to the Third Ten-year In-service Testing Program for Pumps and Valves for Susquehanna Ses Units 1 & 2 | Safe Shutdown Internal Flooding Probabilistic Risk Assessment Large early release frequency |
ML042680078 | 24 September 2004 | Third 10-Year Inservice Inspection Interval Program Plan | VT-2 Incorporated by reference |
ML042730338 | 20 September 2004 | Third Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-006 | |
PLA-5806, Proposed Revision to Relief Requests Irroi and 2RR01 for Proposed Third Ten-year Interval Inservice Testing Program Plans | 10 September 2004 | Proposed Revision to Relief Requests Irroi and 2RR01 for Proposed Third Ten-year Interval Inservice Testing Program Plans | Internal Flooding Probabilistic Risk Assessment |
PLA-5783, Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783 | 14 July 2004 | Proposed Relief Request No. 3RR-13 to the Third 10-year Inservice Inspection Program for Plant Units 1 and 2 PLA-5783 | Dissimilar Metal Weld |
PLA-5744, Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-5744 | 8 April 2004 | Proposed Relief Request No. 31 to the Second 10-Year Inservice Inspection Program for Susquehanna Ses Unit 1, PLA-5744 | Weld Overlay Dissimilar Metal Weld |
ML030440409 | 13 February 2003 | Relief Request for Authorization to Use Sample Disassembly and Inspection Program as an Alternative to the ASME Code, Section XI, Requirements | |
PLA-5543, Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2 | 27 November 2002 | Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2 |