Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML13035A188 | 29 April 2013 | Relief Request ISI-3-36, Reactor Coolant Pressure Boundary Testing, Third 10-Year Inservice Inspection Interval | VT-2 Incorporated by reference Pressure Boundary Leakage Scaffolding |
ML12341A278 | 4 December 2012 | Relief Request: American Society of Mechanical Engineers (Asme), Code Case N-770-1 | Boric Acid Dissimilar Metal Weld |
ML12250A642 | 15 October 2012 | Correction to Relief Request ISI-3-35, Use of Subsequent Edition of ASME OM Code for Snubbers Program, for 3rd and 4th 10-Year Inservice Inspection Intervals | |
ML12179A492 | 20 July 2012 | Relief Request ISI-3-35, Use of Subsequent Edition of ASME OM Code for Snubbers Program, for 3rd and 4th 10-Year Inservice Inspection Intervals | Incorporated by reference |
ML112730074 | 4 November 2011 | Relief Requests ISI-3-32, ISI-3-33, and ISI-3-34, Alternative to Requirements for Examinations of Welds and Core Support Structure Surfaces, Third 10-Year Inservice Inspection | Probabilistic Risk Assessment Incorporated by reference |
ML092790153 | 2 October 2009 | Revision 1 to Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-29, Inspection of Reactor Vessel Head Control Element Drive Mechanism Nozzles | Nondestructive Examination Pressure Boundary Leakage |
ML092790155 | 2 October 2009 | Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles | Liquid penetrant |
ML083640375 | 23 January 2009 | Relief Requests ISI-3-27, Revision 1, and ISI-3-28, Revision 1, for the Application of Weld Overlay on Dissimilar and Similar Metal Welds | Weld Overlay Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML083220131 | 12 November 2008 | Revision to Third Ten-Year Inservice Inspection (ISI) Interval Requests ISI-3-27 and ISI-3-28, Use of Structural Weld Overlay and Associated Alternative Repair Techniques | Weld Overlay Nondestructive Examination Liquid penetrant Dissimilar Metal Weld |
ML082460930 | 8 September 2008 | Corrections to Safety Evaluations Issued for Approval to Use Alternative to the Requirements for Repair / Replacement Activities Related to the Performance of Structural Weld Overlays (TAC Nos. MD458.. | Weld Overlay |
ML073240437 | 13 December 2007 | Request for Relief ISI-3-28 - Approval to Use Alternatives to the Requirements of ASME Code for Repair/Replacement Activities Re Performance of Structural Weld Overlays (Tac Nos. MD6256 & MD6257) | Weld Overlay Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML073250004 | 13 December 2007 | RR ISI-3-27 - Approval to Use Alternatives to the Requirements of ASME Code for Repair/Replacement Activities Related to Performance of Structural Weld Overlays (TACs MD4580 & MD4581) | Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML071380013 | 12 June 2007 | Relief Request ISI-3-25 - Third 10-Year Inservice Inspection Interval Re Use of Structural Weld Overlay and Associated Alternative Repair Techniques | Weld Overlay Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML071370740 | 12 June 2007 | Relief Request ISI-3-24 Third 10-Year ISI Interval Regarding Four Reactor Coolant System Pressurizer, Dissimilar Metal, Nozzle-to-safe-end Welds Structural Overlay & Alternative Repair Techniques | Weld Overlay Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
ML070310154 | 15 February 2007 | Relief Request for Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Reactor Vessel Head Penetration Repairs | Nondestructive Examination Incorporated by reference Code Reconciliation Liquid penetrant |
ML070180737 | 7 February 2007 | Third 10-year Inservice Inspection Interval, Requests for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code | Weld Overlay Incorporated by reference Code Reconciliation Liquid penetrant |
ML063450347 | 27 December 2006 | Relief, Relief Request ISI-3-23 for Third 10-Year ISI Interval to Allow Use of American Society of Mechanical Engineers Code Case N-746, MC9433 & MC9434 | |
ML062850096 | 21 December 2006 | Request for Relief for the In-Service Inspection Program and Approval to Use the Alternative Requirements of ASME Code Case N-513-2 | Incorporated by reference |
ML063110322 | 14 December 2006 | Request for Relief (RR ISI-3-18) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Third 10-Year ISI Interval | Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant Dissimilar Metal Weld |
ML063240589 | 14 December 2006 | Third 10-year Inservice Inspection Interval, Requests for Relief ISI-3-19 and ISI-3-20 from the Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code-TAC MD1128/1129 | Weld Overlay Hydrostatic Nondestructive Examination Incorporated by reference |
ML062620491 | 2 October 2006 | Request for Relief (ISI-3-16) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC9433/MC9433) | Nondestructive Examination Incorporated by reference |
ML062640282 | 2 October 2006 | Request for Relief (ISI-3-17) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC9487/MC9488) | Weld Overlay Hydrostatic Incorporated by reference |
ML062290241 | 15 August 2006 | Revision to the Duration of Relief Request ISI-3-22 Third 10-Year Inspection Interval, San Onofre Unit 3 | Weld Overlay |
ML061350370 | 11 May 2006 | Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-21 Requests for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control Element Drive Mechanism (CEDM) # 56 | Weld Overlay Code Reconciliation Liquid penetrant |
ML061360065 | 11 May 2006 | Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-22 Request for Alternative to ASME Code Rules for the Inside Diameter Structural Weld Overlay Repair Process for Control Element Drive Mechanism (CEDM) # 56 | Weld Overlay Aging Management Code Reconciliation Liquid penetrant |
ML060410323 | 8 February 2006 | Inservice Inspection Program Relief Request ISI-3-15 | Incorporated by reference Finite Element Analysis Liquid penetrant |
ML060260221 | 18 January 2006 | Withdrawal of Relief Request ISI-3-10, Revision 1 | |
ML050560035 | 9 March 2005 | Evaluation of Relief for Use of Mechanical Nozzle Assemblies as an Alternate to the American Society of Mechanical Engineers Code Repairs | Boric Acid Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis Pressure Boundary Leakage |
ML050680054 | 2 March 2005 | Safety Evaluation of Relief for Repair of Pressurizer Sleeves During the Third 10-Year Inservice Inspection (ISI) Interval (Tacs. MC4789 and MC4790) | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference Finite Element Analysis |
ML043620341 | 23 December 2004 | SONGS, Unit 3 - Request for Relief from Requirements of the ASME Code Concerning Reactor Vessel Head Penetration Repairs | Nondestructive Examination Incorporated by reference Code Reconciliation Liquid penetrant Pressure Boundary Leakage |
ML061350374 | 31 October 2004 | Attachment 1, Relief Request ISI-3-21 Evaluation of the Acceptability of Embedded Flaw Repair of the Indication in Reactor Vessel Head Penetration No. 56 at SONGS Unit 3 | Safe Shutdown Earthquake Hydrostatic Finite Element Analysis |
ML042640339 | 15 September 2004 | Revision to the Duration of Relief Request ISI-3-7 Third 10-Year Inspection Interval | |
ML042050426 | 22 July 2004 | SONGS, Request Relief from Requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Concerning Inservice Inspection (ISI) Program Updates for the Third 10-Year ISI (TAC Nos. MC0334 & MC0335) | VT-2 Incorporated by reference Dissimilar Metal Weld |
ML041260459 | 5 May 2004 | SONGS, Units 2 & 3, Inservice Inspection Program Relief Request ISI-38, Embedded Flaw Repair Process | Nondestructive Examination Incorporated by reference Code Reconciliation Liquid penetrant |
ML041140166 | 21 April 2004 | SONGS, Units 2 and 3, Request for Relief from the Requirements of the ASME Code Concerning Updates to Inservice Testing Program | Probabilistic Risk Assessment Incorporated by reference |
ML040840128 | 19 March 2004 | Songs, Units 2 and 3 - Relief Request- Relaxation of the Requirements of Order EA-03-009 Regarding Reactor Pressure Vessel Head Inspections | Nondestructive Examination |
ML040840576 | 19 March 2004 | Relief, Requirements of the ASME Boiler and Pressure Vessel Code Concerning Mechanical Nozzle Seal Assemblies | |
ML030280169 | 24 January 2003 | Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55a | Boric Acid Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake VT-2 Finite Element Analysis |
ML023250202 | 19 November 2002 | Second Ten-Year Interval Inservice Inspection Program Pressure Retaining Piping Welds Relief Requests B-2-06 & B-2-07 | Dissimilar Metal Weld |
ML022320815 | 10 September 2002 | Songs Units 2 & 3, Relief, American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Concerning Use of Electrical Discharge Machining, MB5251, MB5252 | Nondestructive Examination |
ML020870459 | 27 March 2002 | Relief, Mechanical Nozzle Assemblies as an Alternative to American Society of Mechanical Engineers (Amse) Code Repairs | Boric Acid VT-2 Pressure Boundary Leakage |
ML013390273 | 11 January 2002 | SONGS, Units 2 and 3, Request for Relief Regarding Reactor Pressure Vessel Nozzle Examinations (TAC Nos. MB2484 and MB2485) | Incorporated by reference |