Letter Sequence Other |
---|
|
|
MONTHYEARML1129715062011-10-21021 October 2011 Request 151-3-35 in Accordance with 10 CFR 50.55a(g)(4)(iv) Use of Subsequent Edition of Asme OM Code for Snubbers Program Project stage: Request ML12179A4922012-07-20020 July 2012 Relief Request ISI-3-35, Use of Subsequent Edition of ASME OM Code for Snubbers Program, for 3rd and 4th 10-Year Inservice Inspection Intervals Project stage: Other ML12250A6422012-10-15015 October 2012 Correction to Relief Request ISI-3-35, Use of Subsequent Edition of ASME OM Code for Snubbers Program, for 3rd and 4th 10-Year Inservice Inspection Intervals Project stage: Other 2012-10-15
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML13035A1882013-04-29029 April 2013 Relief Request ISI-3-36, Reactor Coolant Pressure Boundary Testing, Third 10-Year Inservice Inspection Interval ML12341A2782012-12-0404 December 2012 Relief Request: American Society of Mechanical Engineers (Asme), Code Case N-770-1 ML12250A6422012-10-15015 October 2012 Correction to Relief Request ISI-3-35, Use of Subsequent Edition of ASME OM Code for Snubbers Program, for 3rd and 4th 10-Year Inservice Inspection Intervals ML12179A4922012-07-20020 July 2012 Relief Request ISI-3-35, Use of Subsequent Edition of ASME OM Code for Snubbers Program, for 3rd and 4th 10-Year Inservice Inspection Intervals ML1127300742011-11-0404 November 2011 Relief Requests ISI-3-32, ISI-3-33, and ISI-3-34, Alternative to Requirements for Examinations of Welds and Core Support Structure Surfaces, Third 10-Year Inservice Inspection ML0927901532009-10-0202 October 2009 Revision 1 to Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-29, Inspection of Reactor Vessel Head Control Element Drive Mechanism Nozzles ML0927901552009-10-0202 October 2009 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles ML0836403752009-01-23023 January 2009 Relief Requests ISI-3-27, Revision 1, and ISI-3-28, Revision 1, for the Application of Weld Overlay on Dissimilar and Similar Metal Welds ML0832201312008-11-12012 November 2008 Revision to Third Ten-Year Inservice Inspection (ISI) Interval Requests ISI-3-27 and ISI-3-28, Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0824609302008-09-0808 September 2008 Corrections to Safety Evaluations Issued for Approval to Use Alternative to the Requirements for Repair / Replacement Activities Related to the Performance of Structural Weld Overlays (TAC Nos. MD458.. ML0732404372007-12-13013 December 2007 Request for Relief ISI-3-28 - Approval to Use Alternatives to the Requirements of ASME Code for Repair/Replacement Activities Re Performance of Structural Weld Overlays (Tac Nos. MD6256 & MD6257) ML0732500042007-12-13013 December 2007 RR ISI-3-27 - Approval to Use Alternatives to the Requirements of ASME Code for Repair/Replacement Activities Related to Performance of Structural Weld Overlays (TACs MD4580 & MD4581) ML0713800132007-06-12012 June 2007 Relief Request ISI-3-25 - Third 10-Year Inservice Inspection Interval Re Use of Structural Weld Overlay and Associated Alternative Repair Techniques ML0713707402007-06-12012 June 2007 Relief Request ISI-3-24 Third 10-Year ISI Interval Regarding Four Reactor Coolant System Pressurizer, Dissimilar Metal, Nozzle-to-safe-end Welds Structural Overlay & Alternative Repair Techniques ML0703101542007-02-15015 February 2007 Relief Request for Relief from Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Concerning Reactor Vessel Head Penetration Repairs ML0701807372007-02-0707 February 2007 Third 10-year Inservice Inspection Interval, Requests for Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code ML0634503472006-12-27027 December 2006 Relief, Relief Request ISI-3-23 for Third 10-Year ISI Interval to Allow Use of American Society of Mechanical Engineers Code Case N-746, MC9433 & MC9434 ML0628500962006-12-21021 December 2006 Request for Relief for the In-Service Inspection Program and Approval to Use the Alternative Requirements of ASME Code Case N-513-2 ML0631103222006-12-14014 December 2006 Request for Relief (RR ISI-3-18) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code - Third 10-Year ISI Interval ML0632405892006-12-14014 December 2006 Third 10-year Inservice Inspection Interval, Requests for Relief ISI-3-19 and ISI-3-20 from the Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code-TAC MD1128/1129 ML0626204912006-10-0202 October 2006 Request for Relief (ISI-3-16) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC9433/MC9433) ML0626402822006-10-0202 October 2006 Request for Relief (ISI-3-17) from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (TAC Nos. MC9487/MC9488) ML0622902412006-08-15015 August 2006 Revision to the Duration of Relief Request ISI-3-22 Third 10-Year Inspection Interval, San Onofre Unit 3 ML0613503702006-05-11011 May 2006 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-21 Requests for Alternative to ASME Code Rules for the Embedded Flaw Repair Process for Control Element Drive Mechanism (CEDM) # 56 ML0613600652006-05-11011 May 2006 Third Ten-Year Inservice Inspection (ISI) Interval Relief Request ISI-3-22 Request for Alternative to ASME Code Rules for the Inside Diameter Structural Weld Overlay Repair Process for Control Element Drive Mechanism (CEDM) # 56 ML0604103232006-02-0808 February 2006 Inservice Inspection Program Relief Request ISI-3-15 ML0602602212006-01-18018 January 2006 Withdrawal of Relief Request ISI-3-10, Revision 1 ML0505600352005-03-0909 March 2005 Evaluation of Relief for Use of Mechanical Nozzle Assemblies as an Alternate to the American Society of Mechanical Engineers Code Repairs ML0506800542005-03-0202 March 2005 Safety Evaluation of Relief for Repair of Pressurizer Sleeves During the Third 10-Year Inservice Inspection (ISI) Interval (Tacs. MC4789 and MC4790) ML0436203412004-12-23023 December 2004 SONGS, Unit 3 - Request for Relief from Requirements of the ASME Code Concerning Reactor Vessel Head Penetration Repairs ML0613503742004-10-31031 October 2004 Attachment 1, Relief Request ISI-3-21 Evaluation of the Acceptability of Embedded Flaw Repair of the Indication in Reactor Vessel Head Penetration No. 56 at SONGS Unit 3 ML0426403392004-09-15015 September 2004 Revision to the Duration of Relief Request ISI-3-7 Third 10-Year Inspection Interval ML0420504262004-07-22022 July 2004 SONGS, Request Relief from Requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Concerning Inservice Inspection (ISI) Program Updates for the Third 10-Year ISI (TAC Nos. MC0334 & MC0335) ML0412604592004-05-0505 May 2004 SONGS, Units 2 & 3, Inservice Inspection Program Relief Request ISI-38, Embedded Flaw Repair Process ML0411401662004-04-21021 April 2004 SONGS, Units 2 and 3, Request for Relief from the Requirements of the ASME Code Concerning Updates to Inservice Testing Program ML0408401282004-03-19019 March 2004 Songs, Units 2 and 3 - Relief Request- Relaxation of the Requirements of Order EA-03-009 Regarding Reactor Pressure Vessel Head Inspections ML0408405762004-03-19019 March 2004 Relief, Requirements of the ASME Boiler and Pressure Vessel Code Concerning Mechanical Nozzle Seal Assemblies ML0302801692003-01-24024 January 2003 Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55a ML0232502022002-11-19019 November 2002 Second Ten-Year Interval Inservice Inspection Program Pressure Retaining Piping Welds Relief Requests B-2-06 & B-2-07 ML0223208152002-09-10010 September 2002 Songs Units 2 & 3, Relief, American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Concerning Use of Electrical Discharge Machining, MB5251, MB5252 ML0208704592002-03-27027 March 2002 Relief, Mechanical Nozzle Assemblies as an Alternative to American Society of Mechanical Engineers (Amse) Code Repairs ML0133902732002-01-11011 January 2002 SONGS, Units 2 and 3, Request for Relief Regarding Reactor Pressure Vessel Nozzle Examinations (TAC Nos. MB2484 and MB2485) 2013-04-29
[Table view] Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 July 20, 2012 Mr. Peter T. Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 REQUEST ISI-3-35 FOR USE OF A SUBSEQUENT EDITION OF THE ASME OM CODE FOR SNUBBERS PROGRAM IN ACCORDANCE WITH 10 CFR 50.55A(G)(4)(IV) (TAC NOS. ME7542 AND ME7543)
Dear Mr. Dietrich:
By letter dated October 21, 2011, Southern California Edison Company (SCE), the licensee for San Onofre Nuclear Generating Station (SONGS), Units 2 and 3, submitted Request ISI-3-35 to allow the use of a subsequent American Society of Mechanical Engineers (ASME) Code Edition and Addenda for its snubber program. This request is for the remaining third 10-year inservice inspection (lSI) interval and fourth 10-year inservice testing (1ST) intervals. The request involves the inservice examination and testing of snubbers at SONGS, Units 2 and 3.
The current edition of the ASME Boiler and Pressure Vessel (B&PV) Code,Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," for SONGS, Units 2 and 3, for the third 10-year lSI interval is the 1995 Edition with 1996 Addenda, and for the fourth 10-year 1ST interval is the 2005 Addenda through 2008a Edition. Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4)(iv), the licensee requested U.S. Nuclear Regulatory Commission (NRC) approval to use the ISTA and ISTD subjections of the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code) for lSI items subject to the limitations and modifications listed in 10 CFR 50.55a(b).
The SONGS lSI and 1ST Intervals are at this time concurrent, both ending on August 17, 2013, and, therefore, the interval specified is the same for either program (lSI or 1ST) is used. The request for relief is to allow a transition from Licensee Controlled Specifications, which is based upon the ASME Code,Section XI, to the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code), Section ISTD and the request is to last for the remainder of the third lSI (and 1ST) testing interval.
In order to avoid the extension of the lSI interval, for some unforeseen reason, impacting the Snubber program, SCE has requested that the Snubber program, in accordance with OM Code Section ISTD, to transition into the new 120-month interval with the rest of the 1ST program.
The NRC staff has reviewed the subject request and concludes, as set forth in the enclosed safety evaluation, that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(4)(iv), and is in compliance with the ASME OM Code
P. Dietrich -2 requirements. Therefore, the NRC staff approves Request ISI-3-35 for the remainder of third 10-year lSI interval which will end on August 27,2012, and the fourth 10-year 1ST interval, which is scheduled to end on August 17, 2023.
All other ASME Code,Section XI requirements for which an alternative was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
If you have any questions, please contact Kaly Kalyanam at 301-415-1480 or kaly.kalyanam@nrc.gov.
Sincerely, Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-361 and 50-362
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST IS/-3 USE OF SUBSEQUENT EDITION OF ASME OM CODE FOR SNUBBERS PROGRAM SOUTHERN CALIFORNIA EDISON SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 2 AND 3 DOCKET NOS. 50-361 AND 50-362
1.0 INTRODUCTION
By letter dated October 21, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML112971506), Southern California Edison. (SCE, the licensee),
submitted Request ISI-3-35 to request U.S. Nuclear Regulatory Commission (NRC) approval to allow the usage of subsequent American Society of Mechanical Engineers (AS ME) Code Edition and Addenda for its snubber program. The request involves the inservice examination and testing of snubbers at San Onofre Nuclear Generating Station (SONGS), Units 2 and 3, and is applicable to the remainder of the third 10-year inservice inspection (lSI) and fourth 10-year inservice testing (1ST) intervals.
The current ASME Boiler and Pressure Vessel Code (B&PV or ASME Code),Section XI, "Rules for Inservice Inspection of Nuclear Power Plant Components," Edition for SONGS, Units 2 and 3, for the third 10-year lSI interval is the 1995 Edition with 1996 Addenda, and for the fourth 10-year lSI interval is the 2005 Addenda through 2008a Edition. The snubber inservice examination and testing requirements were deleted in the 2006 Addenda through 2008a Edition of the ASME Code,Section XI. Therefore, the applicable ASME Code for snubber inservice examination and testing, for the plants committed to the 2006 Addenda and later Edition of the ASME Code,Section XI, is the ASME Code for Operation and Maintenance of Nuclear Power Plants (ASME OM Code), 2004 Edition with 2005 and 2006 Addenda. In Request ISI-3-35, the licensee requested to use ASME OM Code, 2004 Edition with 2005 and 2006 Addenda, for its snubber inservice examination and testing at SONGS, Units 2 and 3. Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(g)(4 )(iv), the licensee requested approval to use the subsequent ASME OM Code 2004 Edition, OMa-2005 and OMb-2006 Addenda in lieu of the earlier ASME B&PV Code,Section XI.
2.0 REGULATORY EVALUATION
The regulations in 10 CFR 50.55a(g), "Inservice Inspection Requirements," require, in part, that lSI of certain ASME Code Class 1, 2, and 3 components (including supports) be performed at Enclosure
- 2 120-month (10-year), lSI program intervals, in accordance with the specified ASME Code and applicable addenda incorporated by reference in the regulations. Snubbers are part of supports. In accordance with 10 CFR SO.SSa(g)(4)(ii), licensees are required to comply with the requirements of the latest edition and addenda of the ASME Code incorporated by reference in the regulations 12 months prior to the start of each 120-month lSI program interval. In accordance with 10 CFR SO.SSa(g)(iv), lSI of components (including supports) may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in 10 CFR SO.SSa(b), subject to NRC approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions and addenda are met. NRC Regulatory Issue Summary (RIS) 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," dated July 28,2004 (ADAMS Accession No. ML042090436), provides guidance for use of later code editions.
3.0 TECHNICAL EVALUATION
3.1 ASME Code Component Affected (as stated by the licensee)
All seismic restraints (snubbers) in San Onofre Nuclear Generating Station (SONGS) Unit 2 and Unit 3 within the scope described in ASME OM Code, Subsection ISTA-1100(c).
3.2 Applicable Code Requirement (as stated by the licensee)
The Inservice Inspection Code of Record for the current 10 Year lSI Interval at SONGS, Unit 2 and Unit 3 is ASME 8&PV Code - Section XI, 1995 Edition with 1996 Addenda. In accordance with Table IWA-1600-1 of the lSI Code of Record anq 10 CFR 50.55a(b)(2)(vii), the Code of Record for the snubbers is the ASME/ANSI OM 4,1987 Edition with OMa-1988 Addenda.
3.3 Duration of Proposed Alternative (as stated by the licensee)
The duration of this request is the remainder of the 3rd Ten Year lSI Interval (which ends August 17, 2013) and the 4th Ten Year 1ST Interval for SONGS Unit 2 and Unit 3 (which will begin on August 18, 2013).
3.4 Proposed Subsequent Code Edition and Addenda (as stated by the licensee)
The propos'ad subsequent Code edition and addenda is the ASME OM Code 2004 Edition with OMa-200S and OMb-2006 Addenda, Federal Register notice 76FR36232. In accordance with 10 CFR SO.SSa(b)(3)(v)(8), Federal Register notice 7SFR24324, the particular section of the subsequent Code applicable to snubbers is Subsection ISTD with the support of subsection ISTA for General Requirements. The significant changes and improvements between the current Code of record and the subsequent Code are (1) testing is more performance based and (2) test plans rely on distinct test plan groups based on predetermined attributes.
- 3 SONGS is prepared to transition the Snubber Program out of the Licensee Controlled Specifications (LCS) to the ASME OM 1ST Code, Subsection ISTD in accordance with 10 CFR 50.55a(b)(3)(v)(8) and begin the use of the subsequent Code Edition and Addenda upon NRC approval of this request. The proposed edition and Addenda of the OM Code will apply to the Snubber Program for the remainder of the 3rd Ten Year Interval and for the 4th 10 Year Interval. With the use of ASME OM Code 2004 Edition with OMa-2005 and OMb-2006 Addenda, snubbers w~1I no longer follow requirements of the ASME 8PV Code,Section XI.
3.5 NRC Staff Evaluation The regulations in 10 CFR 50.55a(g)(4)(iv) state:
Inservice examination of components and system pressure tests may meet the requirements set forth in subsequent editions and addenda that are incorporated by reference in paragraph (b) of this section, subject to the conditions listed in paragraph (b) of this section, and subject to Commission approval. Portions of editions or addenda may be used provided that all related requirements of the respective editions or addenda are met.
The 2004 Edition through 2005 and 2006 Addenda of the ASME OM Code were incorporated by reference into 10 CFR 50.55a(b)(3) in a final rule dated June 21,2011 (Federal Register, Volume 76, No. 119, page 36232-36279). This is currently the latest edition and addenda of the ASME OM Code approved for use by the NRC, subject to the conditions in 10 CFR 50.55a(b)(3)(i), (ii), (v), and (vi). The SONGS, Units 2 and 3, snubber program is required to comply with the 1995 Edition with 1996 Addenda of the ASME 8&PV Code,Section XI for the current, third, 10-year lSI interval. The regulations in 10 CFR 50.55a{b)(3)(v)(A) allow the use of the AS ME OM Code for snubber inservice examination and testing in lieu of the ASME 8&PV Code,Section XI requirements. When using 2006 Addenda and later editions or addenda of the ASME 8&PV Code,Section XI, 10 CFR 50.55a(b)(3)(v)(8) requires the use of the ASME OM Code, because snubbers requirements have been deleted from the ASME 8&PV Code,Section XI.
The licensee is proposing to use the 2004 Edition through 2005 and 2006 Addenda of the ASME OM Code for snubber program as the "Code of Record" in lieu of the 1995 Edition with 1996 Addenda of the ASME 8&PV Code,Section XI for the SONGS, Units 2 and 3, for the remainder third (current), 10-year interval and next, fourth, 10-year lSI program interval. Per current regulations in 10 CFR 50.55a, the fourth, 10-year interval snubber program at SONGS, Units 2 and 3, must be based ASME OM Code, 2004 Edition with 2005 and 2006 Addenda.
Therefore, as described in Regulatory Issue Summary (RIS) 2004-12, "Clarification on Use of Later Editions and Addenda to the ASME OM Code and Section XI," and pursuant to 50.55a(g)(4)(iv), the NRC staff concludes that the usage of 2004 Edition with 2005 and 2006 Addenda of the ASME OM Code is acceptable for both the third and fourth, 10-year lSI intervals, subject to the conditions 10 CFR 50.55a(b)(3)(i), (ii), (v), and (vi).
-4
4.0 CONCLUSION
Based on the above, the NRC staff concludes that Request ISI-3-35, to apply the requirements of Subsection ISTD (in its entirety) and the related requirements of Subsection ISTA, using the 2004 Edition of ASME OM Code, with 2005 and 2006 Addenda, for the program to examine and test snubbers at SONGS, Units 2 and 3, is acceptable. These requirements will be used in lieu of the corresponding requirements in the 1995 Edition with 1996 Addenda of ASME B&PV Code,Section XI. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(g)(4)(iv), and is in compliance with the ASME OM Code requirements. Therefore, the NRC staff approves Request ISI-3-35 for the remainder of third 10-year lSI interval which will end on August 27, 2012, and the fourth 10-year 1ST interval, which is scheduled to end on August 17, 2023.
All other ASME Code,Section XI requirements for which an alternative was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Gurjendra S. Bedi Date: July 20, 2012
ML12179A492 *SE email dated OFFICE RRlDORLlLPL4/PM NRRlDORLlLPL4/LA NRRlDE/EPTB/BC NRRlDORLlLPL4/BC II MMarkley NAME NKalyanam JBurkhardt McMurtray* (FLyon for) I:
DATE 7/19/12 7/19/12 5/24/12 7/20/12 I,