Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML18299A118 | 12 October 2018 | Structural Integrity Associates Engineering Report No. 0901350.304, Revision 3, Fatigue Crack Growth Evaluation, October 12, 2018 | Through-Wall Leak |
ML18299A117 | 12 October 2018 | Framatome Calculation No. 32-9280712, Rev. 002, Tp CRDM Lower Joint Environmentally Assisted Fatigue Dated October 12, 2018 (Non-Proprietary) | Aging Management Exemption Request |
L-2014-044, Offsite Dose Calculation Manual for Gaseous and Liquid Effluents, Revision 20 | 19 December 2013 | Offsite Dose Calculation Manual for Gaseous and Liquid Effluents, Revision 20 | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
L-2008-130, Supplement to 2007 Annual Radioactive Effluent Release Report | 30 May 2008 | Supplement to 2007 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML060860078 | 13 March 2006 | Attachment 3 Calculation PTN-BFJR-06-001 Phase 3 SDP for Turkey Point B AFW Pump Failure | Fitness for Duty Mission time Preliminary White Finding |
ML18227B786 | 3 January 1978 | Letter Transmitting Procedure for Evaluation of Maximum Setpoint Overshoot Heat Input Transient & Supplement to July 1977 Report of Pressure Mitigating Systems, Transient Analysis Results | |
ML18227B015 | 3 January 1977 | Submit Revised ECCS Calculations Supplemental Information Performed Using Rated Power Level of 2200 Mwt to Improve Clarity | |
ML18227C904 | 3 January 1977 | Letter Transmitting Copy of Revised ECCS Calculations Report Forwarded on 12/30/1976 with Several Revised Pages to Improve Clarity | |
L-76-438, Letter Transmitting Supplemental Information Regarding ECCS Reevaluation After re-calculation Using Tech Spec Rated Power Level of 2200 Mwt | 30 December 1976 | Letter Transmitting Supplemental Information Regarding ECCS Reevaluation After re-calculation Using Tech Spec Rated Power Level of 2200 Mwt |