Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20149D729 | 31 August 1993 | Pressurized Thermal Shock Probabilistic Fracture Mechanics Sensitivity Analysis for Yankee Rowe Reactor Pressure Vessel | |
ML20055J411 | 30 July 1990 | 1990 Shift Estimates for Yankee Rowe Vessel | |
ML20151T326 | 31 July 1988 | Topics Requiring Further Review Re Seismic Upgrade of Yankee Plant | Earthquake |
ML20151T329 | 31 May 1988 | Trip Rept for 880502-04 Meeting at Walnut Creek,Ca Re Seismic Upgrade of Yankee Nuclear Power Station | Safe Shutdown Finite Element Analysis Earthquake |
ML20207J332 | 31 May 1988 | RELAP5YA Computer Program for Use in PWR Small Break LOCA Analyses, Technical Evaluation Rept | Loop seal Hydrostatic |
ML20207K243 | 31 March 1988 | Technical Evaluation Rept,Tmi Action-NUREG-0737 (II.D.1), Relief & Safety Valve Testing,Yankee Rowe | Loop seal Anticipated operational occurrence |
ML20148F259 | 30 November 1987 | Resolution of Conflicts Between DC-1 Criteria Document & 870717 SER for Yankee Atomic Plant | |
ML20215H548 | 16 April 1987 | Review of Wind & Tornado Loading Responses,Yankee Nuclear Power Station, Technical Evaluation Rept | Safe Shutdown Tornado Missile Hydrostatic Probabilistic Risk Assessment Finite Element Analysis |
ML20215E126 | 30 November 1986 | Rev 2 to Conformance to Reg Guide 1.97 for Yankee Rowe Generating Station, Informal Rept | Boric Acid Shutdown Margin |
ML20204G192 | 31 July 1986 | Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components),South Texas 1 & 2,Virgil C Summer 1,Trojan & Yankee Rowe | |
ML20199K546 | 30 June 1986 | Review of Selected Areas of Yankee Rowe Probabilistic Safety Study | |
ML20214J447 | 25 June 1986 | Post-Implementation Audit Rept for Yankee Atomic Electric Co,Yankee Rowe Nuclear Power Plant,Spds, Technical Evaluation Rept | Fuel cladding |
ML20138R004 | 10 October 1985 | Dcrdr Summary Rept for Yankee Rowe Nuclear Power Station, Technical Evaluation Rept | Shutdown Margin Fuel cladding |
ML20132C927 | 28 February 1985 | Conformance to Reg Guide 1.97,Yankee Rowe Generating Station | Boric Acid |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20058G013 | 22 June 1982 | ECCS Repts (F-47) TMI Action Plan Requirements, Request for Addl Info |