Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14073A5441 April 2014Relief Request No. B-14 for Reactor Pressure Vessel Hot Leg Nozzle Weld Examinations for the Second 10-Year Inservice Inspection IntervalIncorporated by reference
Stress corrosion cracking
Eddy Current Testing
Dissimilar Metal Weld
DM weld
CP-201301361, Relief Request No. B-14 for Reactor Pressure Vessel Hot Leg Nozzle Weld Examinations (Second ISI Interval End Date: August 2, 2014)26 November 2013Relief Request No. B-14 for Reactor Pressure Vessel Hot Leg Nozzle Weld Examinations (Second ISI Interval End Date: August 2, 2014)Weld Overlay
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
ML13056A50315 March 2013Relief Request B-2, Alternative to ASME Code Requirements for Examination of Reactor Vessel Hot-Leg Nozzle Welds, for the Third 10-Year Inservice Inspection IntervalIncorporated by reference
Eddy Current Testing
Dissimilar Metal Weld
DM weld
CP-201300143, Response to RAI for Unit 1 Relief Request No. B-27 February 2013Response to RAI for Unit 1 Relief Request No. B-2Stress corrosion cracking
Eddy Current Testing
Dissimilar Metal Weld
DM weld
CP-201300003, Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010)16 January 2013Submittal of Relief Request No. B-2, Third 10 Year ISI Interval from 10CFR50.55a Requirements for Reactor Vessel Hot Leg Nozzle Weld Examinations (Third ISI Interval Start Date August 13, 2010)Weld Overlay
Stress corrosion cracking
Dissimilar Metal Weld
DM weld
CP-200901227, Revision to Request for Relief to Extend the Unit 1 and 2 in Service Inspection Interval for the Reactor Vessel Weld Examination and Withdrawal of License Amendment Request 09-004 to Add License Condition for Submittal of ISI Informatio14 September 2009Revision to Request for Relief to Extend the Unit 1 and 2 in Service Inspection Interval for the Reactor Vessel Weld Examination and Withdrawal of License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information anProbabilistic Risk Assessment
CP-200900009, Request for Relief to Extend the Unit 1 & 2 Inservice Inspection Interval for the Reactor Vessel Weld Examination and License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information and Analyses4 March 2009Request for Relief to Extend the Unit 1 & 2 Inservice Inspection Interval for the Reactor Vessel Weld Examination and License Amendment Request 09-004 to Add License Condition for Submittal of ISI Information and AnalysesSafe Shutdown
Probabilistic Risk Assessment
Safeguards Contingency Plan
Fire Protection Program
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on OperabilitySafe Shutdown
Unanalyzed Condition
Fitness for Duty
Probabilistic Risk Assessment
Condition Adverse to Quality
Missed surveillance
Operability Determination
Exemption Request
Pressure Boundary Leakage
Backfit
Operational leakage