Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML081790266 | 8 April 2003 | Meeting Minutes of the 499th ACRS Meeting, February 6-8, 2003 | |
ML20148H285 | 22 January 1988 | Summary of ACRS Subcommittee on Generic Items 871216 Meeting W/Util in Washington,Dc Re Effectiveness of NRC Process That Deals W/Generic Issues & Usis.Viewgraphs & Presentation Schedule Encl | Safe Shutdown Reactor Vessel Water Level Exemption Request Earthquake Backfit |
ML20202G498 | 22 May 1986 | Summary of ACRS Reactor Operations Subcommittee 860409 Meeting in Washington,Dc.Schedule of Items Covered, Attendance List & Meeting Handouts Encl | High Radiation Area Hydrostatic Squib |
ML20205J922 | 18 April 1986 | Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations | Probabilistic Risk Assessment |
ML20203E034 | 16 April 1986 | Discusses Util Proposal to Operate W/O Upper Head Injection Sys Portions of Eccs.Rev to Both 10CFR50.46 & App K Should Be Expedited.Overly Conservative Models Should Not Be Used | |
ML20202G489 | 16 April 1986 | Summary of ACRS Combined DHR Sys/Eccs Subcommittee 860326 Meeting in Washington,Dc Re Review of Duke Power Co Request to Delete ECCS Upper Head Injection Sys & Proposed NRR Resolution Position for Generic Issue 124 | |
ML20202G277 | 16 April 1986 | Comments on 860326 Meeting Re Util Request to Delete Upper Head Injection Eccs.Sys Caused Operational Complications & Contributed to Significant Dose to Plant Personnel During Refueling | |
ML20140A526 | 18 March 1986 | Forwards Draft SER for Proposed Operation W/O upper-head Injection (Uhi) to Provide Basis for 860326 Meeting W/Eccs Subcommittee.Nrc Will Be Able to Conclude That Operation at 100% Power W/Uhi Isolated or Removed Acceptable | |
ML20205J741 | 28 February 1986 | Summary of ACRS 310th Meeting on 860213-15 in Washington,Dc Re Review Studies Done & Procedures Proposed by Gpu Nuclear to Protect Against Inadvertent Criticality During Defueling of TMI-2 Core | Earthquake |
ML20205J385 | 23 January 1986 | Summary of ACRS 309th Meeting on 860109-11 in Washington,Dc Re Final Design Approval for Gessar II Design & Proposed Rev 3 to Reg Guide 1.63, Electric Penetration Assemblies in Containment Structures for Nuclear Power Plants | Control of Heavy Loads |
ML20127P081 | 5 March 1985 | Summary of ACRS ECCS Subcommittee 850221 Meeting W/Util & Westinghouse in Washington,Dc Re Status of Rev to App K Rule & Util Proposal to Delete ECCS Upper Head Injection Sys from Ice Condenser Plants |