SECY-22-0113: Weekly Information Report Week Ending December 16, 2022
ML22353A551
Person / Time
Issue date: 12/20/2022
From: Marissa Bailey
NRC/EDO/AO
To: Commissioners
NRC/OCM
References
SECY-22-0113
Download: ML22353A551 (10)


Text

_____________________

INFORMATION REPORT DECEMBER 20, 2022 SECY-22-0113 FOR: The Commissioners FROM: Marissa G. Bailey Assistant for Operations Office of the Executive Director for Operations

SUBJECT:

WEEKLY INFORMATION REPORT - WEEK ENDING DECEMBER 16, 2022 CONTENTS Enclosure Office of the Chief Human Capital Officer A Office of the Chief Information Officer B Office of Nuclear Reactor Regulation C Office of Nuclear Material Safety and Safeguards D Office of the Secretary E Signed by Bailey, Marissa on 12/20/22 Marissa G. Bailey Assistant for Operations, OEDO CONTACT: John R. Jolicoeur, OEDO 301-415-1642

ML22353A551 OFFICE OEDO OEDO/AO NAME JJolicoeur MBailey DATE 12/19/2022 12/20/2022 Office of the Chief Human Capital Officer (OCHCO)

Items of Interest Week Ending December 16, 2022 ARRIVALS CAROTHERS, MATTHEW REACTOR INSPECTOR R-II DAUGHTRY-CRENSHAW, DAVAUGHNTA HUMAN RESOURCES SPECIALIST OCHCO EINSTEIN, ANDREW ACMUI MEMBER NMSS HANSON, SAMUEL STUDENT CO-OP RES KNIGHT, TIA HUMAN RESOURCES SPECIALIST OCHCO KOLLAR, GLENN PHYSICAL SECURITY SPECIALIST ADM RETIREMENTS NONE DEPARTURES BROWDER, KENNETH D. STUDENT CO-OP OCIO HAMPTON, BETHANY N. STUDENT CO-OP OCIO RAHMAN, MUSTAFIZ STUDENT CO-OP ADM DECEMBER 20, 2022 ENCLOSURE A

Office of the Chief Information Officer (OCIO)

Items of Interest Week Ending December 16, 2022 Freedom of Information Act (FOIA) and Privacy Act (PA) Requests, and Appeals Received During the Period of December 12 - December 16, as submitted by requester Tracking Requesters Requesters Request Description Received Number Name Organization Date FOIA-2023- Evens, KTH Royal Requesting: Discussion with ASME 12/12/2022 000038 Siegfried Institute of Representatives Re: Improvements in Technology ASME Safety Codes for Fabricated Components, AEC 943/47, January 6, 1969, ML21215A147. Safety Programs for Water Cooled Reactors, AEC 943/46, August 30, 1968, ML21215A149. Apparent Deficiencies in ASME Boiler and Pressure Vessel Code,Section III, Nuclear Vessels, AEC 943/45, August 12, 1968, ML21215A148. Atomic Energy Commission Information Meeting item ASME Boiler and Pressure Vessel Code, AEC 943/44, June 21, 1968, ML21215A146. Atomic Energy Commission Background Information Meeting of ASME Code Leaders with the Commission, AEC 943/42, March 15, 1968, ML21215A154. (Date Range for Record Search: From 3/15/1968 To 1/6/1969)

FOIA-2023- Danoff, NRC OCIO This is to test submitting a request in 12/13/2022 0000391 Karen PAL. Also testing submitting a fee waiver and expediting processing. I want all email records about the design of the NRC HQ buildings. (Date Range for Record Search: From 01/01/1980 To 01/01/1995) Deleted.

FOIA-2023- Colbert, NRC Test- Deleted. 12/13/2022 000040 Lezlie FOIA-2023- Requester, AINS Test 12.13.22 - Deleted. 12/13/2022 000042 Liz DECEMBER 20, 2022 ENCLOSURE B 1 FOIA-2023-000039, FOIA-2023-000040,FOIA-2023-000042 and APP-2023-000002 were created as a result of testing the Public Access Link feature in FOIAXpress. This note explains the gap in the FOIA case and appeal numbering sequence for actual requests and appeals.

Tracking Requesters Requesters Request Description Received Number Name Organization Date FOIA- Danish, Kyle Van Ness Requester is seeking the following 12/15/2022 2023- Feldman documents: 1) All documents related to or 000043 addressing the NRCs implementation of the benchmark activity and lessons learned; 2) All documents related to or addressing the NRCs implementation of the safe space activity; 3) All Human Resources Management System (HRMS) documents that record NRC staffs time reporting charges to Docket NRC-2019-0062, 10 CFR Part 53: Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (hereinafter Part 53 Rulemaking) from the dockets inception in 2019 through August 31, 2022; and 4) All documents related to or addressing NRCs budget line for the Part 53 Rulemaking in accordance with Section 103(a) of the Nuclear Energy Innovation and Modernization Act, Public Law No. 115-439 (01/14/19), and the funding that remains available as of August 31, 2022.

APP-2023- Danoff, NRC OCIO I'm appealing the denial of my fee waiver 12/13/2022 000002 Karen and expediated request. This is to test submitting an appeal through PAL.

Deleted DECEMBER 20, 2022 ENCLOSURE B

Office of Nuclear Reactor Regulation (NRR)

Items of Interest Week Ending December 16, 2022 NRC Peer Reviews U.S. Department of Transportation Report On December 16, 2022, the U.S. Department of Transportation Pipelines and Hazardous Materials Safety Administration (PHMSA) held a public meeting to discuss the public release of its report, Updated Safety Review and Assessment of Natural Gas Transmission Pipelines Adjacent to the Indian Point Site, ORNL/SR-2022/2558. The PHMSA requested that Oak Ridge National Laboratory (ORNL) assess the worst-case consequences to the public, Indian Point Energy Center (IPEC) employees, property, and the environment from a hypothetical complete rupture of a natural gas pipeline at the IPEC site. The U.S. Nuclear Regulatory Commission (NRC) peer-reviewed the report and agrees with the conclusion of the report that it is improbable that an unintentional natural gas release from any of the three pipelines will cause physical damage to safety-related structures, systems, or components, or the radioactive waste containers at the IPEC site. PHMSA will be accepting public questions and comments on the report for up to 6 months.

NRC Holds Public Webinar on Licensing of Advanced Reactors On December 15, 2022, the NRC staff held a public webinar with over 95 stakeholders on regulatory improvements to support the licensing of advanced reactors. Topics included new graphite component modeling tools; three technical reports on the MACCS computer code that assess its capability to support advanced reactor licensing reviews; a proposed industry guidance document related to operator licensing for advanced reactors; a discussion on recent new reactor licensing lessons learned; and a discussion on a planned series of workshops on content of applications under the new-design review guide. This meeting was in support of Strategy 2 (analytical tools), Strategy 3 (regulatory framework), and Strategy 4 (codes and standards) of the advanced reactor Implementation Action Plans.

NRC Staff Holds Meeting with Constellation Energy on Limerick License Amendment Requests On December 15, 2022, NRC staff held a public meeting with Constellation Energy to discuss potential exceptions to Institute of Electrical and Electronics Engineers Standard 603-1991, identified in the acceptance letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22339A064) for review of Limerick digital instrumentation and controls (I&C) license amendment requests. No regulatory decisions were made in the meeting and the licensees presentation is at ADAMS Accession No. ML22347A153.

NRC Staff Holds Meeting with the Pressurized Water Reactor Owners Group Risk Management Committee On December 14, 2022, NRR staff participated in the Pressurized Water Reactor Owners Group Risk Management Committee meeting. The staff delivered presentations on several topics to communicate various areas where staff is leveraging the Be RiskSMART framework/risk-informed decision-making, including several topics related to Standardized Plant Analysis Risk model updates, Probabilistic Risk Assessment configuration control, and efforts underway in risk-informing evaluations of common cause failures in digital I&C systems (ML22349A648).

The meeting was well-attended and was successful in coordinating future risk-informed activities, as well as sharing industry and NRC staff insights.

DECEMBER 20, 2022 ENCLOSURE C

TerraPower to Continue Its Natrium Reactor Pre-Application Activities with the NRC Staff On December 13, 2022, TerraPower announced that initial operation of its Natrium reactor in Kemmerer, WY would likely be delayed by at least two years due to uncertainty regarding the availability of High Assay Low Enriched Uranium (HALEU) fuel. The HALEU fuel for the Natrium reactors first core load was originally going to be supplied by Russian state-owned company TENEX (Rosatom). However, TerraPowers announcement stated that it no longer sees this as a viable fuel option for the Natrium reactor. TerraPower is currently engaged in pre-application activities with the NRC staff in support of future licensing of its Natrium reactor design. The HALEU fuel supply chain issues are not expected to affect its ongoing reactor licensing activities and TerraPower indicated that it still expects to submit its construction permit application for the Natrium reactor on the schedule previously communicated to NRC staff.

NRC Staff Holds Meeting with the Boiling Water Reactor Owners Group Executive Oversight Committee On December 12, 2022, NRC staff held a virtual open meeting with the Boiling Water Reactor Owners Group (BWROG) Executive Oversight Committee (EOC) to discuss boiling water reactor issues of interest. Key topics discussed included updates on Revision 4 of the emergency procedures and severe accident guidelines; Technical Specifications Task Force TSTF-576, Revise Safety/Relief Valve Requirements; RG 1.183, Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors; and digital instrumentation and controls. The NRC and BWROG are planning future interactions on topics of interest. Meeting presentations are available via ADAMS Accession Nos. ML22341A011 and ML22341A012.

DECEMBER 20, 2022 ENCLOSURE C

Office of Nuclear Material Safety and Safeguards (NMSS)

Items of Interest Week Ending December 16, 2022 NRC Staff Issues Revision 1 of the Safety Evaluation Report for the Church Rock License Amendment On December 12, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff finalized and issued Revision 1 of the Safety Evaluation Report (SER) for the Church Rock license amendment request to relocate mine waste onto the mill tailings impoundment at the Church Rock site (ML22076A094). The SER states that the license amendment application is in compliance with the applicable requirements of Title 10 of the Code of Federal Regulations Part 40 and Appendix A. Additionally, this SER documents that the mine waste can be disposed of in a manner that will not compromise site reclamation and long-term stability of the mill tailings impoundment.

Virtual Public Meeting on the Activities of the Future of the National Materials Program Working Group On December 12, 2022, the NRC staff held a virtual public meeting to present the activities of the Future of the National Materials Program (NMP) Working Group (ML22326A222). The purpose of this meeting was to inform NRC materials licensees and members of the public of the working groups observations and considerations for the future of the NMP, assuming an increasing number of Agreement States and emerging technologies. The meeting was well-attended with nearly 100 people composed of Agreement State and NRC staff, licensees, and members of the public. The working group members answered questions related to NRC and Agreement State fees, opportunities for Agreement State training, and consistency between Agreement States with respect to guidance development.

Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2 On December 13, 2022, the NRC published a notice in the Federal Register (87 FR 76219) announcing that the agency will conduct a scoping process to gather information necessary to prepare an environmental impact statement (EIS) to evaluate the environmental impacts for the license renewal of the operating licenses for Comanche Peak Nuclear Power Plant, Units 1 and

2. The NRC is seeking public comment on this action and has scheduled public scoping meetings that will take place on January 10, 2023, from 1 to 3 p.m. and 5 to 7 p.m. local time.

Comments on the scope of the EIS are due by January 30, 2023.

Public Meeting on the Rulemaking Considering Changes to Reporting Requirements for Nonemergency Events at Nuclear Power Plants On December 13, 2022, the NRC staff held a public meeting on the rulemaking considering changes to reporting requirements for nonemergency events at nuclear power plants. The purpose of the meeting was to provide information to facilitate stakeholders' comments on the regulatory basis for changes to those requirements (ML22108A004). The meeting had approximately 60 attendees including NRC staff, industry, state representatives, and non-governmental organizations. Staff received good feedback on topics discussed, which included the basis for the staffs recommended changes to the reporting requirements and the costs and benefits of those recommendations.

DECEMBER 20, 2022 ENCLOSURE D

NRC Staff Issues Revision No. 1 of Certificate of Compliance No. 9375 for the HI-STAR ATB 1T Package to Holtec International On December 13, 2022, the staff issued Revision No. 1 of Certificate of Compliance No. 9375 for the HI-STAR ATB 1T Package to Holtec International. This amendment allows Holtec to have options between two high strength materials for the fabrication of the containment boundary components. The package ships contents described as segmented and non-segmented activated stainless steel or Inconel reactor internals, and surface-contaminated reactor related hardware from reactor decommissioning activities. The package will be used to ship waste to the SKB repository (Sweden) and can be used in the U.S. under specific conditions.

Notice of Intent To Conduct Scoping Process and Prepare Environmental Impact Statement; TRISO-X Special Nuclear Material License On December 16, 2022, the NRC published a notice in the Federal Register (87 FR 77146) announcing that the agency received a license application by letters dated April 5, 2022, and September 23, 2022, from TRISO-X, LLC (TRISO-X) a wholly owned subsidiary of X-energy LLC. By its application, TRISO-X is requesting a license to possess and use special nuclear material for the manufacture of high-assay low-enriched uranium fuel at a fuel fabrication facility to be located in Oak Ridge, Roane County, Tennessee. The proposed action is the issuance of a license for the possession and use of special nuclear material. The NRC staff will prepare an EIS to document the potential environmental impacts from the proposed action. As part of the EIS development process, the NRC is seeking comments on the scope of its environmental review. Comments on the scope of the EIS are due by February 14, 2023.

DECEMBER 20, 2022 ENCLOSURE D

Office of the Secretary (SECY)

Items of Interest Week Ending December 16, 2022 Document Released to Public Date of Subject Document Decision Documents

1. SECY-22-0106 11/29/22 Xcel Energy Request for Emergency Operations Facility Consolidation and Relocation Information
1. SECY-22-0110 12/12/22 Weekly Information Report Week Ending 12/02/2022
2. SECY-22-0111 12/14/22 Weekly Information Report Week Ending 12/09/2022 Memoranda
1. Staff Requirements 12/13/22 Overview of Advanced Reactor Fuel Activities Memorandum M221208 Commission Correspondence
1. Letter to the Honorable Gerald E. Connolly and Jody B. Hice, responds to letter requesting an update on the NRC's implementation of the Modernizing Government Technology Act Federal Register Notices Issued
1. Notice of renewal of the Charter of the Licensing Support Network Advisory Review Panel DECEMBER 20, 2022 ENCLOSURE E