SBK-L-13049, 9 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan for Seabrook Station

From kanterella
(Redirected from SBK-L-13049)
Jump to navigation Jump to search
9 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan for Seabrook Station
ML13091A029
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/13/2013
From: O'Keefe M
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-13049
Download: ML13091A029 (2)


Text

SAFEGUARDS INFORMATION NEXTera ENER aY SEABROOK March 13, 2013 Docket No. 50-443 SBK-L-13049 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Revision 19 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan for Seabrook Station In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions,"-and -10 CFR 50.54(p)(2), "Conditions of licenses," NextEra Energy Seabrook, LLC submits Revision 19 to the Seabrook Station Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

The Physical Security Plan has been revised to reflect the following changes:

" Clarified description of the Secured Owner Controlled Area in response to a request for additional information

" Added perimeter illumination equipment in response to arequest for additional information

% Updated Waterborne Threat Measures based on a revised site specific blast analysis One (1) CD-ROM containing Safeguards Information is included in this submission. The CD-ROM labeled "Seabrook Station PSP, Revision 19, Safeguards Information" contains the following files:

001 Seabrook Station PSP Rev 19_SGI_.pdf- SGI (39,354,368 bytes) 002 Seabrook Station PSP Rev 19 Change SynopsisSGI _.pdf- SGI(9,539,584 bytes) 003 CD Index.pdf - SGI - Decontrolled upon separation (approximately 65,536 bytes)

File 001 contains Safeguards Information that must be protected from public disclosure as required by 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements."

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 S bb

SAFEGUARDS INFORMATION Nuclear Regulatory Commission SBK-L-13049 / Page 2 Should you have any question regarding this submittal, please contact James Tucker.

(jarnes.tucker@nexteraenergy.com), Security Manager, at (603) 773-7354.

Sincerely, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager Enclosure - SGI CD-ROM labeled "Seabrook Station PSP, Rev. 19, Safeguards Information" cc: Regional Administrator, Region I (with enclosure)

USNRC Project Manager, Seabrook Station (without enclosure)

Senior Resident Inspector, USNRC, Seabrook Station (without enclosure)

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)