SBK-L-12158, 8 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan for Seabrook Station

From kanterella
Jump to navigation Jump to search
8 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan for Seabrook Station
ML12216A086
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/01/2012
From: O'Keefe M
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-12158
Download: ML12216A086 (2)


Text

SAFEGUARDS INFORMATION NEXTeraý ENERG'Y'p August 1, 2012 Docket No. 50-443 SBK-L-12158 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Revision 18 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan for Seabrook Station In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions of licenses," NextEra Energy Seabrook, LLC submits Revision 18 to the Seabrook Station Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

The Physical Security Plan has been revised to reflect the following changes:

  • Revised to incorporate Approved NRC SFAQ's One (1) CD-ROM containing Safeguards Information is included in this submission. The CD-ROM labeled "Seabrook Station PSP, Revision 18, Safeguards Information" contains the following files:

001 Seabrook Station PSP Rev 18 _SGI.pdf (5,120,294 bytes) 002 Seabrook Station PSP Rev 18.Synopsis_SGI_.pdf (134,467 bytes) 003 CD Index.pdf - SGI - Decontrolled upon separation (61,922 bytes)

File 001 and File 002 contain Safeguards Information that must be protected from public disclosure as required by 10 CFR 73.22, "Protection of Safeguards Information: Specific Requirements."

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)

lextEraEnergy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 . I

SAFEGUARDS INFORMATION Nuclear Regulatory Commission SBK-L-12158 / Page 2 Should you have any question regarding this submittal, please contact James Tucker (james.tucker@nexteraenergy.com), Security Manager, at (603) 773-7354.

Sincerely, NextEra Energy Seabrook, LLC gelWchael O'KeefC Licensing Manager Enclosure - SGI CD-ROM labeled "Seabrook Station PSP, Rev. 18, Safeguards Information" cc: Regional Administrator, Region I (with enclosure)

USNRC Project Manager, Seabrook Station (without enclosure)

Senior Resident Inspector, USNRC, Seabrook Station (without enclosure)

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)