RS-18-021, License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements

From kanterella
(Redirected from RS-18-021)
Jump to navigation Jump to search
License Amendment Request for Approval of Changes to Emergency Plan EP-AA-1000 Staffing Requirements
ML18053A163
Person / Time
Site: Dresden, Byron, Braidwood, Clinton, Quad Cities, LaSalle  Constellation icon.png
Issue date: 01/31/2018
From: Jim Barstow
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML18053A159 List:
References
RS-18-021
Download: ML18053A163 (4)


Text

'Exelon Generation 200 Exelon Way Kennett Square, PA 19348 www.exeloncorp.com

. 10 CFR 50.90 10 CFR 50.54(q)

RS-18-021 January 31, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Braidwood Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-72 and NPF-77 NRC Docket Nos. STN 50-456, STN 50-457, and 72-73 Byron Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-37 and NPF-66 NRC Docket Nos. 50-454, 50-455, and 72-68 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 and 72-1046 Dresden Nuclear Power Station, Units 1, 2 and 3 Facility Operating License No. DPR-2 Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos.50-010, 50-237, 50-249, and 72-37 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 N RC Docket Nos. 50-373, 50-37 4, and 72-70 Quad Cities Nuclear Power Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-29 and DPR-30 NRC Docket Nos. 50-254, 50-265, and 72-53 License Amendment Request for Approval of Changes to Emergency Plan Staffing Requirements Pursuant to 1 O CFR 50.90, "Application for amendment of license, construction permit, or early site permit," Exelon Generation Company, LLC (Exelon) requests amendments to licenses for the facilities listed above.

// "/. L/-5 jl)fVf 55 z_~

tJ,,L tJM5S

U.S. Nuclear Regulatory Commission License Amendment Request Changes to Emergency Plan Staffing January 31, 2018 Page 2 10 CFR 50.47(b) and 10 CFR 50, Appendix E establish emergency planning standards that require: 1) adequate staffing, 2) satisfactory performance of key functional areas and critical tasks, and 3) timely augmentation of the response capability.

Exelon is requesting U.S. Nuclear Regulatory Commission (NRG) approval of proposed changes to the Radiological Emergency Preparedness Plans for the facilities listed above. The proposed changes would revise certain Emergency Response Organization (ERO) positions for facilities listed with the minimum staff ERO guidance specified in draft Revision 2 of NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."

The proposed changes have been reviewed considering the requirements of 1 O CFR 50.47, "Emergency plans," paragraph (b), 1 O CFR 50 Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," and other applicable emergency preparedness NRG guidance documents. An evaluation of the proposed changes pursuant to 1 O CFR 50.54, "Conditions of licenses," paragraph (q), "Emergency plans," determined that the proposed changes result in a reduction in effectiveness of the Emergency Plans for the affected facilities and, therefore, require prior NRG approval.

Exelon has concluded that the proposed changes present no significant hazards consideration under the standards set forth in 10 CFR 50.92, "Issuance of amendments."

The proposed changes have been reviewed by Plant Operations Review Committees at each site in accordance with the requirements of the Exelon Quality Assurance Program.

The following enclosures, along with supporting attachments, are provided which contain an evaluation of the proposed changes, including a detailed description, technical and regulatory evaluations including a no significant hazards consideration, and environmental consideration for each facility.

  • - Braidwood Station, Units 1 and 2 - Evaluation of Proposed Changes o A - Emergency Plan Marked-up Pages o B - Emergency Plan Clean Copy Pages
  • - Dresden Nuclear Power Station, Units 1, 2, 3 - Evaluation of Proposed Changes o A - Emergency Plan marked-up pages o 8 - Emergency Plan clean copy pages

L_

U.S. Nuclear Regulatory Commission License Amendment Request Changes to Emergency Plan Staffing January 31, 2018 Page 3

  • - LaSalle County Station, Units 1 and 2 - Evaluation of Proposed Changes o

Attachment SA - Emergency Plan marked-up pages o

Attachment SB - Emergency Plan clean copy pages

  • - Quad Cities Nuclear Power Station, Units 1 and 2 - Evaluation of Proposed Changes o A - Emergency Plan marked-up pages o 8 - Emergency Plan clean copy pages
  • - Summary of Commitments
  • - Information Related to Review of Proposed Changes by the State This amendment request includes a regulatory commitment as described in Enclosure 8 of this submittal. Exelon plans to conduct a confirmation Emergency Preparedness Drill at one of the affected stations under this License Amendment Request to demonstrate that no loss of function will result due to the proposed changes in the ERO.

Exelon is requesting approval of the proposed license amendments by September 1, 2019.

Once approved, Exelon is requesting that the amendments for the affected facilities be implemented no later than December 31, 2019.

In accordance with 1 O CFR 50.91, "Notice for public comment; State consultation," paragraph (b), Exelon is notifying the State of Illinois of this application for these license amendments by transmitting a copy of this letter and the supporting attachments to the designated State Official.

If you have any questions regarding this submittal, please contact Richard Gropp at (610) 765-5557.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 31st day of January 2018.

Respectfully, James Barstow Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC

U.S. Nuclear Regulatory Commission License Amendment Request Changes to Emergency Plan Staffing January 31, 2018 Page 4 Enclosures (including supporting Attachments) (CD copy):

1) Braidwood Station, Units 1 and 2 - Evaluation of Proposed Changes
2) Byron Station, Units 1 and 2 - Evaluation of Proposed Changes
3) Clinton Nuclear Station - Evaluation of Proposed Changes
4) Dresden Nuclear Power Station, Units 1, 2, and 3 - Evaluation of Proposed Changes
5) LaSalle County Station, Units 1 and 2 - Evaluation of Proposed Changes
6) Quad Cities Nuclear Power Station, Units 1 and 2 - Evaluation of Proposed Changes
7) Assessment of ERO Minimum Staff and Full Augmented Staff Positions Removed
8) Summary of Regulatory Commitments
9) Information Related to Review of Proposed Changes by the States of Illinois and Iowa cc:

w/ Enclosures (including supporting Attachments) (CD copy)

Regional Administrator - NRG Region Ill NRG Senior Resident Inspector - Braidwood Station NRG Senior Resident Inspector - Byron Station NRG Senior Resident Inspector - Clinton Power Station NRG Senior Resident Inspector - Dresden Nuclear Power Station NRG Senior Resident Inspector - LaSalle County Station NRG Senior Resident Inspector - Quad Cities Nuclear Power Station NRG Project Manager, NRR - Braidwood Station NRG Project Manager, NRR - Byron Station NRG Project Manager, NRR - Clinton Power Station

  • NRG Project Manager, NRR - Dresden Nuclear Power Station NRG Project Manager, NRR - LaSalle County Station NRG Project Manager, NRR - Quad Cities Nuclear Power Station Illinois Emergency Management Agency - Division of Nuclear Safety

{.,