RS-14-014, Attachment 2: Kld TR-631, Rev. 0, Quad Cities Generating Station Development of Evacuation Time Estimates, Page H-1 Through Page H-39

From kanterella
Jump to navigation Jump to search
Attachment 2: Kld TR-631, Rev. 0, Quad Cities Generating Station Development of Evacuation Time Estimates, Page H-1 Through Page H-39
ML14128A182
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/08/2014
From:
KLD Engineering, PC
To:
Exelon Generation Co, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14128A158 List:
References
RS-14-0145 KLD TR-631, Rev 0
Download: ML14128A182 (40)


Text

APPENDIX H Evacuation Regions

H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-36). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Quad Cities Generating Station H-1 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Table H-1. Percent of Sub-area Population Evacuating for Each Region I_ Sub-Area _ _ _ _ I_

I 112 I 113 I L L L A A A M I I5 I I6 I I7 I IS I I9 II1 A I II1

%1 20% I 20% 1 20% 1 20% I 20% I 20% I 20% 1 20% I 20% 1 Sub-Area Region Toward: l I L12 113 114 IL5 MI 1A2&1A3 IMAI lAS I A6 IA7 IA8 IA9 IA1O IAll IA12 R04 NNW, N 20% 20% 20% 20% 20% 20%120%2 20% 20% f.20%20% 1 20% 20% 20%

ROS 20% 20%

~20% 20%20 20%20% [ 20% 20% 1 20% 120%

2% 20% 20% 20% 20% I20%

R06 20% 20% 20% 20% 20% 20% 20% 20%

R07 SS20%0 20% 20% 20% 20% 20% 20% 20% 20%120% [ 20%20%20%=20%

RO8 20% 20% 20% 20% 20% 20% 20% 20%

R09 20% 20% 20% 20% 20% 20% 20% 20% 20%

R10 20% 20% I20%_ 20% 20% 20% 20% 20% 20%

R11 20% 20% 20% 20% 20% 20% 20% 20%

R12 2% 20% 20% 20% 20% I20%0120% 20% 20% 20% 20% 20% 20%

207fO WNW~ fO lL ljo-I M I nl '?1no/. I j!no/v 7noxf Wind Sub-Area Direction 1 A12 IA9 Region Toward: Il1. 1 I2 Towad:S 114 113 115 116 M~ IA2 1A3 IA4 lAS IA6 IA7 IA8 A IA10 l i A12 R14 N 20% 20% 20% 20% 20% 20% 20%

R15 NNE 20% 20% 20% 20% 20% 20%

R16 NE,ENE N EEN 2% 2%.0% 20% 200%

20% 204%20 20% 20%

R17 E20% 20% 20% 20% 20% 20%

R18 ESESE20% 20% 20% 20% 20% 20%

R19 SSE20% 20% 20% 20%

R20 s 20% 20% 20%

R21 SSW 20 20 200%Z0 Quad Cities Generating Station H-2 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

wino Sub-Area Direction Toward: M IL2 IL3 IL4 ILS 116 IAl f A2 1A3 1AM IA5 IA6 IA8 IA9 IA1O IAll I IA12 S-Mile Ring 20% 20% A0% 20% 20% 20% 20% 20% 120%

NNW, N IL2 20% 20% 0 20% 20% 20% 20% 20% 20% 1 20% 1 20% 1 20% 20% 1 20%

NNENEENE 'Ll 20% 20% 120% 1_20% 20% 120% 20% 1 20% [ 20% 20% ] 20%

20% 20% 20% 1 20% 1 20% 1 20% 20% 1 20%

I I + 4 f +

20% 20% 20% 1 20% 1 20% 1 20% 20% I 20%

20% 20% 20% 1 20% 1 20% 20% 1 20%

20% 20% 20% 20% 20% 20% 20% 20%

20% 20% 20% 20% 20% 20% 20% 20%

20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%

20% 20% J20% [20%1 20% 20% 1 20% 20% 20% 1 20%

20% 120% 7nW. I 7qýI7w 7nw-. I -inw Sub-Area(s) Shelter-in-Place Quad Cities Generating Station H-3 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-1. Region R01 Quad Cities Generating Station H-4 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-2. Region R02 Quad Cities Generating Station H-5 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-3. Region R03 Quad Cities Generating Station H-6 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-4. Region R04 Quad Cities Generating Station H-7 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-5. Region ROS Quad Cities Generating Station H-8 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-6. Region R06 Quad Cities Generating Station H-9 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-7. Region R07 Quad Cities Generating Station H-IO KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-8. Region ROB Quad Cities Generating Station H-11 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-9. Region R09 Quad Cities Generating Station H-12 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-10. Region RIO Quad Cities Generating Station H-13 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-11. Region Rll Quad Cities Generating Station H-14 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-12. Region R12 Quad Cities Generating Station H-15 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-13. Region R13 Quad Cities Generating Station H-16 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-14. Region R14 Quad Cities Generating Station H-17 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-15. Region RIS Quad Cities Generating Station H-18 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-16. Region R16 Quad Cities Generating Station H-19 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-17. Region R17 Quad Cities Generating Station H-20 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-18. Region R18 Quad Cities Generating Station H-21 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-19. Region R19 Quad Cities Generating Station H-22 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-20. Region R20 Quad Cities Generating Station H-23 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-21. Region R21 Quad Cities Generating Station H-24 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-22. Region R22 Quad Cities Generating Station H-25 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-23. Region R23 Quad Cities Generating Station H-26 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-24. Region R24 Quad Cities Generating Station H-27 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-25. Region R25 Quad Cities Generating Station H-28 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-26. Region R26 Quad Cities Generating Station H-29 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-27. Region R27 Quad Cities Generating Station H-30 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-28. Region R28 Quad Cities Generating Station H-31 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-29. Region R29 Quad Cities Generating Station H-32 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-30. Region R30 Quad Cities Generating Station H-33 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-31. Region R31 Quad Cities Generating Station H-34 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-32. Region R32 Quad Cities Generating Station H-35 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-33. Region R33 Quad Cities Generating Station H-36 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-34. Region R34 Quad Cities Generating Station H-37 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-35. Region R35 Quad Cities Generating Station H-38 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0

Figure H-36. Region R36 Quad Cities Generating Station H-39 KLD Engineering, P.C.

Evacuation Time Estimate Rev. 0