RS-14-014, Attachment 2: Kld TR-631, Rev. 0, Quad Cities Generating Station Development of Evacuation Time Estimates, Page H-1 Through Page H-39

From kanterella
(Redirected from RS-14-014)
Jump to navigation Jump to search
Attachment 2: Kld TR-631, Rev. 0, Quad Cities Generating Station Development of Evacuation Time Estimates, Page H-1 Through Page H-39
ML14128A182
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/08/2014
From:
KLD Engineering, PC
To:
Exelon Generation Co, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML14128A158 List:
References
RS-14-0145 KLD TR-631, Rev 0
Download: ML14128A182 (40)


Text

APPENDIX H Evacuation Regions

H. EVACUATION REGIONS This appendix presents the evacuation percentages for each Evacuation Region (Table H-i) and maps of all Evacuation Regions (Figure H-1 through Figure H-36). The percentages presented in Table H-1 are based on the methodology discussed in assumption 5 of Section 2.2 and shown in Figure 2-1.

Note the baseline ETE study assumes 20 percent of households will not comply with the shelter advisory, as per Section 2.5.2 of NUREG/CR-7002.

Quad Cities Generating Station Evacuation Time Estimate H-1 KLD Engineering, P.C.

Rev. 0

Table H-1. Percent of Sub-area Population Evacuating for Each Region I_

Sub-Area I_

I 112 I

113 I

L L

L A

A A

M I I5 I I6 I I7 I IS I I9 II1 A I II1

%1 20% I 20% 1 20% 1 20% I 20% I 20% I 20% 1 20% I 20% 1 Region R04 ROS R06 R07 RO8 R09 R10 R11 R12 Toward:

l I

L12 113 114 NNW, N 20%

20%

20%

2%

20%

SS20%0 20%

2% 20%

20%

WNW~

207fO fO lL IL5 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

MI 1A2&1A3 IMAI lAS I

A6 20%120%2 20%

~20%

20%20 20%

20%

20% I20%

IA7 IA8 IA9 IA1O IAll Sub-Area 20% f.20%

20% 1 20%

20%

20%

20%20% [ 20%

20% 1 20% 120%

IA12 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%120% [ 20%20%20%=20%

20%

I20%_

I20%0120%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

ljo-I M I nl

'?1no/.

I j!no/v 7noxf Region R14 R15 R16 R17 R18 R19 R20 R21 Wind Sub-Area Direction Towad:S IA9 A1 1

2 Toward:

Il1. 1 I2 113 114 115 116 M~

IA2 1A3 IA4 lAS IA6 IA7 IA8 A

IA10 l

i A12 N

20%

20%

20%

20%

20%

20%

20%

NNE 20%

20%

20%

20%

20%

20%

N EEN 2%

2%.0%

200%

204%20 NE,ENE 20%

20%

20%

20%

E20%

20%

20%

20%

20%

20%

ESESE20%

20%

20%

20%

20%

20%

SSE20%

20%

20%

20%

s 20%

20%

20%

SSW 20 20 200%Z0 Quad Cities Generating Station Evacuation Time Estimate H-2 KLD Engineering, P.C.

Rev. 0

wino Direction Toward:

M IL2 IL3 IL4 S-Mile Ring 20%

'Ll IL2 NNW, N 20%

20%

20%

NNENEENE 20%

20%

Sub-Area ILS 20%

20%

116 IAl f A2 1A3 1AM IA5 I A6 A0%

0 20%

20%

20%

IA8 IA9 IA1O IAll I IA12 20%

20%

20%

20%

20% 120%

20% 1 20% 1 20% 1 20%

20% 1 20%

120%

1_20%

20% 120%

20% 1 20% [ 20%

20% ] 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20% 1 20% 1 20% 1 20%

20% 1 20%

I I

+

4 f

+

20% 1 20% 1 20% 1 20%

20% I 20%

20% 1 20% 1 20%

20% 1 20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20%

20% J20% [20%1 20%

20% 1 20%

20%

20% 1 20%

20% 120%

7nW. I 7qýI7w 7nw-.

I -inw Sub-Area(s) Shelter-in-Place Quad Cities Generating Station Evacuation Time Estimate H-3 KLD Engineering, P.C.

Rev. 0

Figure H-1. Region R01 Quad Cities Generating Station Evacuation Time Estimate H-4 KLD Engineering, P.C.

Rev. 0

Figure H-2. Region R02 Quad Cities Generating Station Evacuation Time Estimate H-5 KLD Engineering, P.C.

Rev. 0

Figure H-3. Region R03 Quad Cities Generating Station Evacuation Time Estimate H-6 KLD Engineering, P.C.

Rev. 0

Figure H-4. Region R04 Quad Cities Generating Station Evacuation Time Estimate H-7 KLD Engineering, P.C.

Rev. 0

Figure H-5. Region ROS Quad Cities Generating Station Evacuation Time Estimate H-8 KLD Engineering, P.C.

Rev. 0

Figure H-6. Region R06 Quad Cities Generating Station Evacuation Time Estimate H-9 KLD Engineering, P.C.

Rev. 0

Figure H-7. Region R07 Quad Cities Generating Station Evacuation Time Estimate H-IO KLD Engineering, P.C.

Rev. 0

Figure H-8. Region ROB Quad Cities Generating Station Evacuation Time Estimate H-11 KLD Engineering, P.C.

Rev. 0

Figure H-9. Region R09 Quad Cities Generating Station Evacuation Time Estimate H-12 KLD Engineering, P.C.

Rev. 0

Figure H-10. Region RIO Quad Cities Generating Station Evacuation Time Estimate H-13 KLD Engineering, P.C.

Rev. 0

Figure H-11. Region Rll Quad Cities Generating Station Evacuation Time Estimate H-14 KLD Engineering, P.C.

Rev. 0

Figure H-12. Region R12 Quad Cities Generating Station Evacuation Time Estimate H-15 KLD Engineering, P.C.

Rev. 0

Figure H-13. Region R13 Quad Cities Generating Station Evacuation Time Estimate H-16 KLD Engineering, P.C.

Rev. 0

Figure H-14. Region R14 Quad Cities Generating Station Evacuation Time Estimate H-17 KLD Engineering, P.C.

Rev. 0

Figure H-15. Region RIS Quad Cities Generating Station Evacuation Time Estimate H-18 KLD Engineering, P.C.

Rev. 0

Figure H-16. Region R16 Quad Cities Generating Station Evacuation Time Estimate H-19 KLD Engineering, P.C.

Rev. 0

Figure H-17. Region R17 Quad Cities Generating Station Evacuation Time Estimate H-20 KLD Engineering, P.C.

Rev. 0

Figure H-18. Region R18 Quad Cities Generating Station Evacuation Time Estimate H-21 KLD Engineering, P.C.

Rev. 0

Figure H-19. Region R19 Quad Cities Generating Station Evacuation Time Estimate H-22 KLD Engineering, P.C.

Rev. 0

Figure H-20. Region R20 Quad Cities Generating Station Evacuation Time Estimate H-23 KLD Engineering, P.C.

Rev. 0

Figure H-21. Region R21 Quad Cities Generating Station Evacuation Time Estimate H-24 KLD Engineering, P.C.

Rev. 0

Figure H-22. Region R22 Quad Cities Generating Station Evacuation Time Estimate H-25 KLD Engineering, P.C.

Rev. 0

Figure H-23. Region R23 Quad Cities Generating Station Evacuation Time Estimate H-26 KLD Engineering, P.C.

Rev. 0

Figure H-24. Region R24 Quad Cities Generating Station Evacuation Time Estimate H-27 KLD Engineering, P.C.

Rev. 0

Figure H-25. Region R25 Quad Cities Generating Station Evacuation Time Estimate H-28 KLD Engineering, P.C.

Rev. 0

Figure H-26. Region R26 Quad Cities Generating Station Evacuation Time Estimate H-29 KLD Engineering, P.C.

Rev. 0

Figure H-27. Region R27 Quad Cities Generating Station Evacuation Time Estimate H-30 KLD Engineering, P.C.

Rev. 0

Figure H-28. Region R28 Quad Cities Generating Station Evacuation Time Estimate H-31 KLD Engineering, P.C.

Rev. 0

Figure H-29. Region R29 Quad Cities Generating Station Evacuation Time Estimate H-32 KLD Engineering, P.C.

Rev. 0

Figure H-30. Region R30 Quad Cities Generating Station Evacuation Time Estimate H-33 KLD Engineering, P.C.

Rev. 0

Figure H-31. Region R31 Quad Cities Generating Station Evacuation Time Estimate H-34 KLD Engineering, P.C.

Rev. 0

Figure H-32. Region R32 Quad Cities Generating Station Evacuation Time Estimate H-35 KLD Engineering, P.C.

Rev. 0

Figure H-33. Region R33 Quad Cities Generating Station Evacuation Time Estimate H-36 KLD Engineering, P.C.

Rev. 0

Figure H-34. Region R34 Quad Cities Generating Station Evacuation Time Estimate H-37 KLD Engineering, P.C.

Rev. 0

Figure H-35. Region R35 Quad Cities Generating Station Evacuation Time Estimate H-38 KLD Engineering, P.C.

Rev. 0

Figure H-36. Region R36 Quad Cities Generating Station Evacuation Time Estimate H-39 KLD Engineering, P.C.

Rev. 0