MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Thomas D. Gatlin Vice President,NuclearOperations 803.345.4342 A SCANA A SANA COMPANY COMY December 5, 2013 RC-13-0180 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001
Dear Sir/Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 (VCSNS)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 DATE CORRECTION TO LICENSE AMENDMENT REQUEST LAR 12-06014 CHANGES TO SNUBBER SURVEILLANCE REQUIREMENTS
Reference:
- 1. Letter from T. D. Gatlin (VCSNS) to Document Control Desk (NRC),
"License Amendment Request - LAR 12-06014 Changes to Snubber Surveillance Requirements," dated April 2, 2013 (RC-13-0048)
[ML13095A107]
- 2. Letter from T. D. Gatlin (VCSNS) to Document Control Desk (NRC),
"Revision to License Amendment Request - LAR 12-06014 Changes to Snubber Surveillance Requirements," dated October 3, 2013 (RC-13-0151)
South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority, is submitting a correction to the Attachments that were enclosed in Reference two Revision to License Amendment Request (LAR) to the Technical Specifications (TS) for Virgil C. Summer Nuclear Station Unit 1 (VCSNS) dated October 3, 2013.
With this revision, VCSNS is providing the correct end date (December 31, 2023) for the fourth ISI interval. The impacted pages are contained within the attachments.
Aooc Virgil C.Summer Station
- Post Office Box 88. Jenkinsville, SC. 29065 - F (803) 941-9776 k t ( z
Document Control Desk CR-12-06014 RC-1 3-0180 Page 2 of 2 This letter contains no commitments. If you should have any questions, please contact Mr. Bruce L. Thompson at (803) 931-5042.
I declare under penalty of perjury that the foregoing is true and correct.
Exe ute On Thomas D. Gatlin WLT/TDG/bd
Enclosure:
Description of Corrections to LAR 12-06014
- Attachment 1 - Description and Assessment (Page 1 of 7)
" Attachment 1 - Description and Assessment (Page 3 of 7)
" Attachment 5 - Proposed Snubber Plan (Page 4 of 6) c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry V. M. McCree S. A. Williams S. E. Jenkins Paulette Ledbetter NRC Resident Inspector K. M. Sutton NSRC RTS (CR-12-06014)
File (813.20)
PRSF (RC-13-0180)
Document Control Desk CR-12-06014 RC-1 3-0180 Page 1 of 1 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit I DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 Enclosure 1 Description of Corrections to LAR 12-06014 VCSNS Unit 1 is providing corrections to items from LAR 12-06014, Changes to Snubber Surveillance Requirements. VCSNS Unit 1 has defined the fourth 10-year Inservice Inspection (ISI) as beginning January 1, 2014 and ending December 31, 2023.
Revised pages are provided to correct the fourth ISI interval end date. These pages supersede the corresponding previously submitted pages in Attachments 1 and 5 from the referenced letter (RC-13-0151). The revisions are denoted as Revision 2 to LAR 12-06014. The affected pages are shown in the table below:
SCE&G - Corrections to LAR 12-06014 Revision Location in Original Description of Change Number Submittal of LAR 12-06014 2 Attachment 1, Page 1 Corrected interval end date 2 Attachment 1, Page 3 Corrected interval end date 2 Attachment 5, Page 4 Corrected interval end date
Document Control Desk CR-12-06014 RC-13-0151 (RC-13-0180)
Page 1 of 7 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) Unit 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT I Description and Assessment "revised" 1.0
SUMMARY
DESCRIPTION In accordance with the provisions of 10 CFR 50.90, South Carolina Electric & Gas (SCE&G) is submitting a license amendment request to revise Technical Specification (TS) 3/4.7.7, "Snubbers," for Virgil C. Summer Nuclear Station (VCSNS). The proposed change would revise the TS surveillance requirements for snubbers to conform to the revised VCSNS Snubber Testing Program.
2.0 DETAILED DESCRIPTION VCSNS is currently nearing the completion of the third 10-year Inservice Inspection (ISI) interval. The fourth 10-year ISI interval at VCSNS begins on January 1, 2014 and ends REV 2 December 31, 2023. Currently, snubber testing and examination are performed in accordance with the specific requirements of TS 3/4.7.7 as authorized in NRC correspondence under TAC No. MC4323 (Accession No. ML051290198) dated May 10, 2005. As required by 10 CFR 50.55a(b)(3)(v)(B), SCE&G intends to adopt Subsection ISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants," of the ASME OM Code, 2004 Edition with 2005 and 2006 Addenda. The proposed changes to the VCSNS TS are summarized below:
" Reference to Specification 4.7.7.g in TS ACTION 3.7.7 would be replaced with reference to Specification 4.7.7.
" TS Surveillance Requirement (SR) 4.7.7 would be revised to remove specific surveillance requirements for demonstrating snubber operability. The current requirements would be replaced by a reference to the "Snubber Testing Program."
Document Control Desk CR-12-06014 RC-13-0151 (RC-13-0180)
Page 3 of 7
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements VCSNS is currently nearing the completion of the third 10-year ISI interval. The fourth 10-year ISI interval at VCSNS begins on January 1, 2014 and ends REV2 December 31, 2023. Currently, snubber testing and examination are performed in accordance with the specific requirements of TS 3/4.7.7. Relief was authorized pursuant to 50.55a(a)(3)(i), for the third 10-year inservice inspection interval at VCSNS under TAC No. MC4323 (Accession No. ML051290198) dated May 10, 2005.
10 CFR 50.55a(g)(4)(ii) requires that inservice examination of components conducted during successive 120-month inspection intervals must comply with the requirements of the latest edition and addenda of the Code incorporated by reference in 10 CFR 50.55a(b)(3), 12 months before the start of the 120-month inspection interval. If a revised ISI program for a facility conflicts with the TS for the facility, 10 CFR 50.55a(g)(5)(ii) requires licensees to apply to the Commission for amendment of the TS.
For the VCSNS fourth 10-year ISI interval beginning January 1, 2014 and ending REV 2 December 31, 2023, as required by 10 CFR 50.55a(b)(3)(v)(B), SCE&G intends to adopt Subsection ISTD, "Preservice and Inservice Examination and Testing of Dynamic Restraints (Snubbers) in Light-Water Reactor Nuclear Power Plants," of the ASME OM Code, 2004 Edition with 2005 and 2006 Addenda, in place of the specific requirements of TS 3/4.7.7 as previously authorized in NRC relief correspondence dated May 10, 2005.
The purpose of this amendment request is to remove the specific surveillance requirements for demonstrating snubber operability from the TS since the ISI program will be revised to include the requirements of the OM Code Subsection ISTD in the Snubber Testing Program. As such, the proposed changes to TS 3/4.7.7 are necessary to conform the TS to the revised ISI program.
4.2 Precedence The changes proposed to TS 3/4.7.7 are similar to changes submitted by Public Service Electric and Gas (PSEG) Nuclear, LLC for Salem Generating Station, Units 1 and 2 and Dominion Nuclear Connecticut (DNC), Inc for Millstone Power Station Unit 2. The applicable references for these similar changes are provided below:
4.2.1 PSEG Letter LR-N10-0363, License Amendment Request:
Changes to Snubber Surveillance Requirements [for Salem Units 1/2],
dated October 4, 2010 (Accession No. ML102780066).
4.2.2 PSEG Letter LR-N1 1-0107, Response to Draft Request for Additional Information - License Amendment Request: Changes to
South CarolinaElectric & Gas Virgil C. Summer Nuclear Station Unit 1 2.0 EXAMINATION, TESTING AND SERVICE LIFE MONITORING REQUIREMENTS:
2.1 Visual Examinations, Functional Testing, and Service Life requirements shall be performed to the extent specified within SAP-0161 and referenced Surveillance Test Procedures (STP).
2.2 Snubbers are grouped into Defined Test Plan Groups (DTPGs) by design type, size, and accessibility in accordance with ISTD-5252. Each DTPG will be tested using the 10% sample plan per ISTD-5300. There are no snubbers attached to the Steam Generators. All mechanical snubbers at Virgil C. Summer Station Unit 1 are grouped as separate DTPGs by size.
DTPGs PSA 1/4 PSA 1/2 PSA 1 PSA 3 PSA 10 PSA 35 PSA 100 2.4 The service life of all snubbers shall be monitored and snubbers replaced, reconditioned or evaluated in accordance with SAP-0161 and ISTD-6200 to ensure that the service life is not exceeded between surveillance inspections.
The replacement or reconditioning shall be documented and records retained in accordance with VCSNS procedures.
3.0 EXAMINATION and TESTING METHODS:
3.1 Visual examinations shall be performed by individuals qualified in accordance with VCSNS procedures. These examinations are conducted to ensure the mechanical and structural condition of the snubber support location and to observe conditions that could affect functional adequacy. Visual examinations and functional testing shall be performed to verify the requirements specified within SAP-0161 are met in accordance with Subsection ISTD.
4.0 EXAMINATION and TESTING FREQUENCY:
4.1 Visual Examinations and Functional Testing shall be performed at the frequency specified within SAP-0161 and ISTD-4250 and ISTD-5240. VCSNS currently performs accessible and inaccessible snubber visual examinations as one group with the frequency shown in Table ISTD 4252-1.
4.2 Code Case OMN-1 3, which allows the extension of the visual examination interval, will be implemented for snubber inspections during the fourth 10-year ISI interval which begins on January 1, 2014 and ends on December 31, 2023. REV 2 Code Case OMN-13 is approved for use in Regulatory Guide 1.192 (June 2003).
The Visual Examinations of Table ISTD 4252-1 may be extended in accordance 2013 Rev 1 Page 4 of 6