MONTHYEARRC-07-0084, (Vcsns), Request for Burnup Extension of Exemption Request2007-05-31031 May 2007 (Vcsns), Request for Burnup Extension of Exemption Request Project stage: Request ML0724003072007-09-0505 September 2007 Request for Additional Information Regarding Lead Test Assemblies TAC MD5699) Project stage: RAI RC-07-0156, Response to NRC Request for Additional Information Regarding Lead Test Assemblies2007-10-11011 October 2007 Response to NRC Request for Additional Information Regarding Lead Test Assemblies Project stage: Response to RAI ML0736200602008-02-12012 February 2008 Lead Test Assembly Environmental Assessment Project stage: Other ML0800704662008-03-13013 March 2008 V.C. Summer Nuclear Station - Exemption from the Requirements of 10 CFR Part 50, Sections 50.44, and Appendix K Project stage: Approval RS-08-040, Request for Exemption to Support Use of Axiom Cladding Material2008-03-24024 March 2008 Request for Exemption to Support Use of Axiom Cladding Material Project stage: Request ML0812208272008-05-23023 May 2008 Correction to Exemption Issued on March 13, 2008, from the Requirements of 10 CFR Part 50, Section 50.44, 50.46, and Appendix K Project stage: Other 2008-02-12
[Table View] |
|
---|
Category:Letter type:RC
MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Jeffrey B. Archie Vice President,Nuclear Operations 803.345.4214 A sCANA COMPANY May 31, 2007 RC-07-0084 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 REQUEST FOR BURNUP EXTENSION OF EXEMPTION REQUEST
Reference:
Letter from K. R. Cotton (NRC) to J. B. Archie (SCE&G), "V. C. Summer Nuclear Station - Exemption from the Requirements of 10 CFR Part 50, Sections 50.44, 50.46, and Appendix K (TAC No. MC4462)," January 14, 2005 South Carolina Electric & Gas (SCE&G) requests a burnup extension of the current exemption for the VCSNS lead test assemblies (LTAs). In the referenced letter of January 14, 2005, the NRC approved the use of up to four LTAs containing fuel rods with Optimized ZIRLO M T and several different developmental clad alloys.
Westinghouse has since trademarked these developmental clad alloys as AXIOMTM.
The NRC approval of the exemption request was contingent on the fuel rod burnup remaining within the applicable licensed limit for ZIRLO . These LTAs are currently in M T
their second cycle of irradiation. SCE&G proposes to reinsert one of the LTAs with Optimized ZIRLO TM and AXIOM TM fuel rod cladding for a third cycle of irradiation.
During the third cycle, this LTA will reach a lead rod average burnup of up to 75,000 MWD/MTU.
There is no specific Technical Specification that imposes a limit on fuel rod burnup; however, the current lead rod average burnup limit for the VCSNS core is 62,000 MWD/MTU. SCE&G requests that the NRC provide approval to extend the exemption request in order to irradiate this LTA beyond the current licensed burnup limit. The reinsertion of the LTA is currently scheduled to occur during the next refueling outage, which is expected to begin in April 2008. Therefore, SCE&G requests that NRC action on this matter be completed on or before December 31, 2007.
Attached is justification for exceeding the fuel rod burnup limit on the VCSNS LTAs.
SCE&G I VirgilC. Summer Nuclear Station o P.O. Box 88 .Jenkinsville, South Carolina 29065.T(803)345.5209. www.sceg.com A DO0
Document Control Desk CR-07-01499 RC-07-0084 Page 2 of 2 Should you have any questions, please call Mr. Bruce Thompson (803) 931-5042.
Very etruly yours, efryB. Arch ie JT/JBNdr
Attachment:
Burnup Extension of Exemption Request c: K. B. Marsh S. A. Byrne N. S. Cams J. H. Hamilton, Jr.
R. J. White W. D. Travers R. E. Martin K. M. Sutton W. M. Herwig N. Smith NRC Resident Inspector NSRC RTS (CR-07-01499)
File (810.32)
DMS (RC-07-0084)
Document Control Desk Attachment CR-07-01499 RC-07-0084 Page 1 of 4 South Carolina Electric & Gas Company (SCE&G)
Burnup Extension of Exemption Request for Virgil C. Summer Nuclear Station (VCSNS)
Background
SCE&G inserted four lead test assemblies (LTAs) into the VCSNS Cycle 16 core. The LTAs were identical to the existing fuel assembly design except that the fuel rods were clad in advanced Westinghouse alloys. The cladding material in two of the four LTAs is entirely Optimized ZIRLO TM*. Each of the other two LTAs incorporates sixteen fuel rods with AXIOMTM-alloy cladding with the remainder of the fuel rods using Optimized ZIRLO TM cladding.
During VCSNS refueling outage 16 (RF-16), the four LTAs were inspected and reinserted into the core. VCSNS is currently operating in Cycle 17 and the next refueling outage (RF-17) is expected to begin in April 2008. During RF-17, the two LTAs containing Optimized ZIRLO TM fuel rod cladding and one of the two AXIOMTM LTAs will be discharged. It is planned to reinsert the remaining AXIOMTM LTA into the Cycle 18 core. Ifthe AXIOMTM LTA shows unexpected results during the refueling outage inspection, one of the LTAs with all Optimized ZIRLO TM cladding will be used instead of the AXIOM TM LTA.
Lead Test Assembly Conditions The purpose of irradiating the LTA is to evaluate fuel rod and fuel assembly performance at a projected lead rod burnup of less than 75,000 MWD/MTU.
It is proposed that one LTA will be inserted into the VCSNS Cycle 18 core with expected startup in May 2008. The LTA will be located at the center of the core. The LTA lead rod average burnup is estimated to be 55,000 MWD/MTU at the beginning of Cycle 18 and less than 75,000 MWD/MTU at the end of Cycle 18.
The LTA was a typical production fuel assembly with the exception of the fuel rod cladding material. Pre-characterization will be performed during the Cycle 17/18 refueling outage which is expected to begin in April 2008. It will include measurements of cladding oxide, fuel assembly and fuel rod growth, and overall visual examinations. If anomalous behavior is observed or measured characteristics are outside acceptable bounds, the AXIOMTM LTA will not be irradiated in Cycle 18, An LTA with all Optimized ZIRLO TM cladding will then be similarly inspected, and if acceptable, will be substituted.
Additionally, the LTA will be evaluated with current fuel performance methods and codes to ensure that all current design criteria are met for the projected bumup. If all current design criteria are not met, the AXIOM TM LTA will not be irradiated in Cycle 18. An LTA with all Optimized ZIRLO TM cladding will then be similarly evaluated, and if acceptable, will be substituted.
Document Control Desk Attachment CR-07-01499 RC-07-0084 Page 2 of 4 The post irradiation examinations of the LTA after 3 cycles of operation will include measurements of cladding oxide, fuel assembly and fuel rod growth, and overall visual examinations. The post irradiation examinations are expected to begin in January 2010.
Prior to irradiating the LTA in Cycle 18, the LTA will be evaluated with current fuel performance methods and codes to ensure that all current design criteria are met for the projected burnup. If all current design criteria are not met, the AXIOM TM LTA will not be irradiated in Cycle 18. An LTA with all Optimized ZIRLOTM cladding will then be similarly evaluated, and if acceptable, will be substituted.
Justification for Exceeding Fuel Rod Bumup Limit There is no specific Technical Specification that imposes a limit on fuel rod burnup; however, the current lead rod average burnup limit for the VCSNS core is 62,000 MWD/MTU. In Reference 1 of this attachment, as supplemented by Reference 2, SCE&G requested an exemption to allow the use of up to four LTAs containing fuel rods with Optimized ZIRLO TM and several different developmental clad alloys. These LTAs are currently in their second cycle of irradiation. It is planned to reinsert one of the LTAs with Optimized ZIRLOTM and AXIOMTM fuel rod cladding for a third cycle of irradiation. During the third cycle, this LTA will reach a lead rod average burnup of up to 75,000 MWD/MTU.
The NRC approval of the exemption request (Reference 3) was contingent on the fuel rod bumup remaining within the applicable licensed limit for ZIRLOTM. However, the Justification of Exemption (i.e., the exemption is authorized by law; the exemption will not present an undue risk to the health and safety of the public; the exemption is consistent with the common defense and security) and Special Circumstances provided in Reference 1 continue to apply to the LTA with a lead rod average burnup of up to 75,000 MWD/MTU.
Fuel rod design criteria that become more limiting for high burnup fuel rods include fuel rod growth, clad fatigue, rod internal pressure and cladding corrosion. Evaluations have been performed using NRC approved fuel rod design methodologies. These models have been used to perform similar evaluations for other high burnup LTAs. In addition, a developmental corrosion model for ZIRLOTM will be used as an evaluation tool based primarily on data from high burnup fuel and accounts for observed corrosion from the ZIRLOTM clad fuel rods that were examined in previous post-irradiation examination (PIE) campaigns. Both the ZIRLOTM developmental corrosion model and the NRC-approved model will be used in the VCSNS Cycle 18 specific reload safety evaluation to confirm that the fuel rod design limits will be met.
Figure 1 presents the peak oxide measurements for Zircaloy-4, Standard ZIRLOTM, and Optimized ZIRLOTM compared to the recent measurements taken of the VCSNS AXIOMTM and Optimized ZIRLO TM LTAs at the end of one cycle of irradiation. Optimized ZIRLOTM shows significantly lower corrosion than Standard ZIRLOTM. At bumups above 50 GWd/MTU, the Optimized ZIRLOTM cladding has at least 30-50% lower oxide thickness than the Standard ZIRLO TM cladding. Both AXIOMTM and Optimized ZIRLO TM have similar behavior in VCSNS and hence it is predicted that AXIOM TM cladding will also have lower oxide thickness compared to Standard ZIRLOTM cladding at bumups >70 GWd/MTU.
Document Control Desk Attachment CR-07-01499 RC-07-0084 Page 3 of 4 160 140]
Zircaloy-4 ZIRLO A OPT. ZIRLO 1 120
- LTIZIVCSummer EOC16 (FaII06) 100
.80 g£60-a' 20 -
0 10 20 30 40 50 60 70 80 Bumup (GWd/M-I'U)
Figure 1 - Peak Oxide Measurements The Optimized ZIRLO TM and AXIOM TM high burnup fuel rods will continue to meet all current design criteria. The clad integrity of the Optimized ZIRLO TM and AXIOM TM high burnup rods will be maintained as the subject fuel assembly will be placed in a less than limiting core location and will continue to meet the safety parameter requirements. The acceptability of using the Optimized ZIRLO TM and AXIOM TM high burnup rods will be evaluated in the VCSNS Cycle 18 Reload Safety Evaluation. Taking one LTA with Optimized ZIRLO TM and AXIOM TM fuel rods to higher burnup would not result in a safety concern. The assembly will retain a coolable geometry and the plant dose criterion will not be exceeded or approached in the event that the Optimized ZIRLO TM or AXIOM TM high burnup rods fail.
The effects of burnup levels up to 75,000 MWD/MTU on source terms and associated doses are discussed in Reference 4. The assessment concluded that the fuel handling accident (FHA) thyroid doses are not adversely affected by extended burnup. Also, the overall increase in the gamma-body dose is not of consequence, since it is the thyroid dose, not the gamma-body dose that is bounding for the FHA. For accidents other than FHA, even though there are variations in core inventories of isotopes due to extended burnup up to 75,000 MWD/MTU, there are no significant increases of isotopes that are major contributors to accident doses. It is worthy to note that, at higher burnups, there is actually a reduction in certain isotopes that are major dose M
T contributors under accident situations (e.g., Kr-88). With less than 1% of Optimized ZIRLO and AXIOMTM high burnup rods in the entire core, any variation of isotopes will be extremely small. Thus, the radiation dose limitations of 10 CFR 100, "Reactor Site Criteria," will not be exceeded. The use of an LTA with Optimized ZIRLO TM and AXIOM TM fuel rods at higher burnup will not result in an increased risk of radiological consequences.
Document Control Desk Attachment CR-07-01499 RC-07-0084 Page 4 of 4 Conclusion SCE&G is proposing to insert one LTA into a non-limiting core location during VCSNS Cycle 18 for the purpose of obtaining high burnup data. The LTA contains both Optimized ZIRLO TM and AXIOMTM fuel rod cladding. Based on the above assessment, extending the lead rod-average bumup limit to 75,000 MWD/MTU will not create a safety concern, as all fuel design limits will continue to be met.
SCE&G respectfully requests that the NRC approve this bumup extension of the exemption request by December 31, 2007 in order to support VCSNS Cycle 18 operations scheduled to begin in April 2008.
References
- 1. Letter from J. B. Archie (SCE&G) to U. S. Nuclear Regulatory Commission, "Virgil C.
Summer Nuclear Station, Docket No. 50-395, Operating License No. NPF-12, Request for Exemption for Cladding Material Specified in 10CFR50.44, 10CFR50.46 and 10CFR 50 Appendix K," September 3, 2004
- 2. Letter from J. B. Archie (SCE&G) to U. S. Nuclear Regulatory Commission, "Virgil C.
Summer Nuclear Station (VCSNS), Docket No. 50/395, Operating License No. NPF-12, Request for Additional Information - Request for Exemption for Cladding Material Specified in 10CFR50.44 and 10CFR 50 Appendix K," November 11, 2004
- 3. Letter from K. R. Cotton (NRC) to J. B. Archie (SCE&G), "V. C. Summer Nuclear Station -
Exemption from the Requirements of 10 CFR Part 50, Sections 50.55, 50.46, and Appendix K (TAC No. MC4462)," January 14, 2005
- 4. Davidson, S. L. (Ed.), et al., "VANTAGE + Fuel Assembly Reference Core Report," WCAP-12610-P-A, April 1995