JOHN ELNITSKY Senior Vice President Nuclear Engineering 526 South Church Street, EC-07H Charlotte, NC 28202 704-382-4371 John.Elnitsky@duke-energy.com Serial: RA-16-0020 10 CFR 50.90 April 07, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23
SUBJECT:
WITHDRAWAL OF LICENSE AMENDMENT REQUEST REGARDING METHODOLOGY REPORTS DPC-NF-2010 AND DPC-NE-2011-P
REFERENCES:
- 1. Duke Energy letter, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010 Revision 3 Nuclear Physics Methodology for Reload Design and DPC-NE-2011-P Revision 2, Nuclear Design Methodology Report for Core Operating Limits of Westinghouse Reactors, dated February 3, 2016 (ADAMS Accession No. ML16034A610)
- 2. Duke Energy letter, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P Revision 0, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors, dated August 19, 2015 (ADAMS Accession No. ML15236A044)
Ladies and Gentlemen:
In Reference 1, Duke Energy Progress, Inc., referred to henceforth as Duke Energy, submitted a license amendment request (LAR) requesting review and approval of DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report for Core Operating Limits of Westinghouse Reactors and adoption of these two methodologies into the Technical Specifications for Shearon Harris Nuclear Power Plant, Unit 1 (HNP) and H. B. Robinson Steam Electric Plant, Unit No. 2 (RNP).
On March 23, 2016, a teleconference was held between staff from Duke Energy and the Office of Nuclear Reactor Regulation's Department of Operating Reactor Licensing to discuss dependency of the Reference 1 LAR on the unapproved methodology of DPC-NE-1008-P (submitted in the Reference 2 LAR). As a result of the teleconference, Duke Energy requests withdrawal of the Reference 1 LAR and plans to resubmit the request as a supplement to Reference 2.
U.S. Nuclear Regulatory Commission RA-16-0020 Page2 This submittal contains no new regulatory commitments. Should you have any questions concerning this letter, or require additional information, please contact Art Zaremba, Manager -
Nuclear Fleet Licensing, at 980-373-2062.
I declare under penalty of perjury that the foregoing is true and correct. Executed on o1p..,; I 7t z.. o lt,,.
Sincerely, JBD cc:
W. L. Cox, Ill, Section Chief, NC DHSR S. E. Jenkins, Manager, Radioactive and Infectious Waste Management Section (SC)
A. Wilson, Attorney General (SC)
A. Gantt, Chief, Bureau of Radiological Health (SC)
JOHN ELNITSKY Senior Vice President Nuclear Engineering 526 South Church Street, EC-07H Charlotte, NC 28202 704-382-4371 John.Elnitsky@duke-energy.com Serial: RA-16-0020 10 CFR 50.90 April 07, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-400 / RENEWED LICENSE NO. NPF-63 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 / RENEWED LICENSE NO. DPR-23
SUBJECT:
WITHDRAWAL OF LICENSE AMENDMENT REQUEST REGARDING METHODOLOGY REPORTS DPC-NF-2010 AND DPC-NE-2011-P
REFERENCES:
- 1. Duke Energy letter, Application to Revise Technical Specifications to Adopt Methodology Reports DPC-NF-2010 Revision 3 Nuclear Physics Methodology for Reload Design and DPC-NE-2011-P Revision 2, Nuclear Design Methodology Report for Core Operating Limits of Westinghouse Reactors, dated February 3, 2016 (ADAMS Accession No. ML16034A610)
- 2. Duke Energy letter, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P Revision 0, Nuclear Design Methodology Using CASMO-5/SIMULATE-3 for Westinghouse Reactors, dated August 19, 2015 (ADAMS Accession No. ML15236A044)
Ladies and Gentlemen:
In Reference 1, Duke Energy Progress, Inc., referred to henceforth as Duke Energy, submitted a license amendment request (LAR) requesting review and approval of DPC-NF-2010, Revision 3, Nuclear Physics Methodology for Reload Design, and DPC-NE-2011-P, Revision 2, Nuclear Design Methodology Report for Core Operating Limits of Westinghouse Reactors and adoption of these two methodologies into the Technical Specifications for Shearon Harris Nuclear Power Plant, Unit 1 (HNP) and H. B. Robinson Steam Electric Plant, Unit No. 2 (RNP).
On March 23, 2016, a teleconference was held between staff from Duke Energy and the Office of Nuclear Reactor Regulation's Department of Operating Reactor Licensing to discuss dependency of the Reference 1 LAR on the unapproved methodology of DPC-NE-1008-P (submitted in the Reference 2 LAR). As a result of the teleconference, Duke Energy requests withdrawal of the Reference 1 LAR and plans to resubmit the request as a supplement to Reference 2.
U.S. Nuclear Regulatory Commission RA-16-0020 Page2 This submittal contains no new regulatory commitments. Should you have any questions concerning this letter, or require additional information, please contact Art Zaremba, Manager -
Nuclear Fleet Licensing, at 980-373-2062.
I declare under penalty of perjury that the foregoing is true and correct. Executed on o1p..,; I 7t z.. o lt,,.
Sincerely, JBD cc:
W. L. Cox, Ill, Section Chief, NC DHSR S. E. Jenkins, Manager, Radioactive and Infectious Waste Management Section (SC)
A. Wilson, Attorney General (SC)
A. Gantt, Chief, Bureau of Radiological Health (SC)