Press Release-IV-11-022, NRC to Discuss Performance Assessment of South Texas Project Nuclear Power Plant

From kanterella
(Redirected from Press Release-IV-11-022)
Jump to navigation Jump to search
Press Release-IV-11-022: NRC to Discuss Performance Assessment of South Texas Project Nuclear Power Plant
ML111300535
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 05/10/2011
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-11-022
Download: ML111300535 (1)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Telephone: (817) 860-8128 Site: www.nrc.gov Blog: http://public-blog.nrc-gateway.gov No. IV-11-022 May 10, 2011

Contact:

Victor Dricks (817) 860-8128 E-Mail: OPA4.Resource@nrc.gov Lara Uselding (817) 276-6519 NRC TO DISCUSS PERFORMANCE ASSESSMENT OF SOUTH TEXAS PROJECT NUCLEAR POWER PLANT The Nuclear Regulatory Commission staff will meet in Bay City, Texas, on Thursday, May 19, with representatives of South Texas Project (STP) Nuclear Operating Co., to discuss the agencys assessment of safety performance for the South Texas Project nuclear power plant located near Bay City.

The meeting, which will be open to the public, is scheduled to begin at 5:30 p.m. at the Wharton County Junior College (Center for Energy Development) 4000 Avenue F, Bay City, Texas. In addition to the performance assessment, the NRC staff will be available to answer questions from the public on the safety performance of South Texas Project and the NRCs role in ensuring safe plant operation.

The NRC continually reviews the performance of South Texas Project and the nations other commercial nuclear power facilities, said NRC Region IV Administrator Elmo E. Collins.

The meeting provides an opportunity for us to discuss our annual assessment of the plant with the company, local officials and the public. We look forward to answering any questions they may have about our oversight.

A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2010 and will serve as the basis for discussion. It is available on the NRC website at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/stp_2010q4.pdf.

The NRC said South Texas Project operated safely during 2010 and will receive the detailed inspection regime during 2011 used by the NRC for plants that are operating well.

Inspections are performed by NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.

News releases are available through a free listserv subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html. The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRCs website.