MONTHYEARML23165A2342023-03-0303 March 2023 News Release-23-019: NRC Issues Annual Assessments for Nations Nuclear Power Plants ML22217A0572022-08-0505 August 2022 News Release-I-22-010: New NRC Senior Resident Inspector Assigned to Calvert Cliffs Nuclear Power Plant ML22153A1262022-05-26026 May 2022 News Release-I-22-007: NRC Schedules Webinar to Discuss 2021 Safety Performance at Maryland, New Jersey, New York, Pennsylvania Nuclear Power Plants Press Release-I-21-005, NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants2021-06-0101 June 2021 Press Release-I-21-005: NRC Schedules Webinar to Discuss 2020 Safety Performance at Maryland, New Jersey, New York and Pennsylvania Nuclear Power Plants Press Release-I-20-022, NRC Resident Inspector Newly Assigned to Calvert Cliffs Nuclear Power Plant2020-11-12012 November 2020 Press Release-I-20-022: NRC Resident Inspector Newly Assigned to Calvert Cliffs Nuclear Power Plant Press Release-I-20-008, NRC Schedules Webinar to Discuss 2019 Safety Performance at Pennsylvania and Maryland Nuclear Power Plants2020-05-27027 May 2020 Press Release-I-20-008: NRC Schedules Webinar to Discuss 2019 Safety Performance at Pennsylvania and Maryland Nuclear Power Plants Press Release-I-19-011, NRC to Hold Public Open House to Discuss 2018 Performance of Calvert Cliffs Nuclear Power Plant2019-04-23023 April 2019 Press Release-I-19-011: NRC to Hold Public Open House to Discuss 2018 Performance of Calvert Cliffs Nuclear Power Plant Press Release-I-18-005, NRC to Hold Open House to Discuss 2017 Performance of Calvert Cliffs Nuclear Power Plant2018-03-26026 March 2018 Press Release-I-18-005: NRC to Hold Open House to Discuss 2017 Performance of Calvert Cliffs Nuclear Power Plant Press Release-I-17-014, NRC to Hold Open House to Discuss 2016 Performance of Calvert Cliffs Nuclear Plant2017-04-20020 April 2017 Press Release-I-17-014: NRC to Hold Open House to Discuss 2016 Performance of Calvert Cliffs Nuclear Plant Press Release-I-16-011, NRC to Hold Open House on April 21 to Discuss 2015 Performance of Calvert Cliffs Nuclear Power Plant2016-04-15015 April 2016 Press Release-I-16-011: NRC to Hold Open House on April 21 to Discuss 2015 Performance of Calvert Cliffs Nuclear Power Plant Press Release-I-15-027, NRC Names New Resident Inspector at Calvert Cliffs Nuclear Plant2015-05-26026 May 2015 Press Release-I-15-027: NRC Names New Resident Inspector at Calvert Cliffs Nuclear Plant Press Release-I-15-016, NRC Sends Special Inspection Team to Calvert Cliffs Nuclear Plant2015-04-13013 April 2015 Press Release-I-15-016: NRC Sends Special Inspection Team to Calvert Cliffs Nuclear Plant Press Release-I-15-015, NRC to Conduct Open House on April 16th in Prince Frederick, Md., to Discuss 2014 Performance of Calvert Cliffs Nuclear Power Plant2015-04-0909 April 2015 Press Release-I-15-015: NRC to Conduct Open House on April 16th in Prince Frederick, Md., to Discuss 2014 Performance of Calvert Cliffs Nuclear Power Plant Press Release-I-14-041, NRC Issues White Inspection Finding for Calvert Cliffs 2 Nuclear Plant; Level of Oversight to Be Increased2014-10-27027 October 2014 Press Release-I-14-041: NRC Issues White Inspection Finding for Calvert Cliffs 2 Nuclear Plant; Level of Oversight to Be Increased Press Release-14-073, NRC Renews License for Dry Spent Fuel Storage Facility at Calvert Cliffs2014-10-23023 October 2014 Press Release-14-073: NRC Renews License for Dry Spent Fuel Storage Facility at Calvert Cliffs Press Release-I-14-031, New NRC Senior Resident Inspector Assigned to Calvert Cliffs2014-07-24024 July 2014 Press Release-I-14-031: New NRC Senior Resident Inspector Assigned to Calvert Cliffs Press Release-I-14-019, NRC Schedules Open House for May 1 to Discuss Performance of Calvert Cliffs Nuclear Power Plant2014-04-23023 April 2014 Press Release-I-14-019: NRC Schedules Open House for May 1 to Discuss Performance of Calvert Cliffs Nuclear Power Plant Press Release-14-024, NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon2014-04-0101 April 2014 Press Release-14-024: NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon Press Release-I-14-002, NRC Dispatches Special Inspection Team to Calvert Cliffs Nuclear Power Plant2014-01-27027 January 2014 Press Release-I-14-002: NRC Dispatches Special Inspection Team to Calvert Cliffs Nuclear Power Plant Press Release-I-13-027, NRC Staff to Meet with Constellation on Aug. 5 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet2013-07-29029 July 2013 Press Release-I-13-027: NRC Staff to Meet with Constellation on Aug. 5 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet Press Release-13-047, NRC Issues Order Designating 10 Facilities Eligible for Weapons Pre-Emption Authority2013-06-0505 June 2013 Press Release-13-047: NRC Issues Order Designating 10 Facilities Eligible for Weapons Pre-Emption Authority Press Release-I-13-015, NRC to Hold Open House on April 17th in Prince Frederick, Md., to Discuss Calvert Cliffs Nuclear Plant Annual Assessment2013-04-10010 April 2013 Press Release-I-13-015: NRC to Hold Open House on April 17th in Prince Frederick, Md., to Discuss Calvert Cliffs Nuclear Plant Annual Assessment Press Release-I-12-041, NRC Continues to Monitor Hurricane Sandy; No Plants Shut Down as a Result of the Storm2012-10-29029 October 2012 Press Release-I-12-041: NRC Continues to Monitor Hurricane Sandy; No Plants Shut Down as a Result of the Storm Press Release-I-12-035, NRC Staff to Meet with Constellation on Sept. 19 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet2012-09-11011 September 2012 Press Release-I-12-035: NRC Staff to Meet with Constellation on Sept. 19 in Baltimore to Discuss Performance of Company'S Nuclear Plant Fleet Press Release-12-099, NRC Issues Mid-Cycle Assessments for Nation? Nuclear Plants2012-09-0606 September 2012 Press Release-12-099: NRC Issues Mid-Cycle Assessments for Nation? Nuclear Plants Press Release-I-12-017, NRC to Hold Open House on April 19 in Prince Frederick, Md., to Discuss Calvert Cliffs Nuclear Plant Annual Assessment2012-04-11011 April 2012 Press Release-I-12-017: NRC to Hold Open House on April 19 in Prince Frederick, Md., to Discuss Calvert Cliffs Nuclear Plant Annual Assessment ML12107A3142012-04-0202 April 2012 Press Release-I-12-014: NRC Names New Resident Inspector at Limerick Nuclear Plant Press Release-12-016, NRC Approves Exelon-Constellation Merger, Indirect Transfer of Five Nuclear Power Plant Licenses2012-02-16016 February 2012 Press Release-12-016: NRC Approves Exelon-Constellation Merger, Indirect Transfer of Five Nuclear Power Plant Licenses Press Release-I-11-041, NRC Names New Resident Inspector at Calvert Cliffs Nuclear Plant2011-11-14014 November 2011 Press Release-I-11-041: NRC Names New Resident Inspector at Calvert Cliffs Nuclear Plant Press Release-11-159, NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants2011-08-26026 August 2011 Press Release-11-159: NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants Press Release-I-11-026, NRC, Ceng Managers to Discuss Company'S; Fleet of Nuclear Plants at Public Meeting on July 262011-07-20020 July 2011 Press Release-I-11-026: NRC, Ceng Managers to Discuss Company'S; Fleet of Nuclear Plants at Public Meeting on July 26 Press Release-11-115, Licensing Board to Hear Oral Argument July 7 in Rockville, Md., on Calvert Cliffs New Nuclear Reactor Application2011-06-27027 June 2011 Press Release-11-115: Licensing Board to Hear Oral Argument July 7 in Rockville, Md., on Calvert Cliffs New Nuclear Reactor Application Press Release-I-11-010, NRC to Hold Public Meeting on May 12th in Prince Frederick, Md., to Discuss Annual Assessment of Calvert Cliffs Nuclear Plant2011-05-0202 May 2011 Press Release-I-11-010: NRC to Hold Public Meeting on May 12th in Prince Frederick, Md., to Discuss Annual Assessment of Calvert Cliffs Nuclear Plant Press Release-I-10-042, New NRC Resident Inspector Assigned to Calvert Cliffs Nuclear Plant2010-09-15015 September 2010 Press Release-I-10-042: New NRC Resident Inspector Assigned to Calvert Cliffs Nuclear Plant Press Release-I-10-013, NRC to Hold Open House April 6 in Prince Frederick, Md., to Discuss Annual Assessment for Calvert Cliffs Nuclear Power Plant2010-03-31031 March 2010 Press Release-I-10-013: NRC to Hold Open House April 6 in Prince Frederick, Md., to Discuss Annual Assessment for Calvert Cliffs Nuclear Power Plant Press Release-I-10-004, NRC Sends Special Inspection Team to Calvert Cliffs2010-02-22022 February 2010 Press Release-I-10-004: NRC Sends Special Inspection Team to Calvert Cliffs Press Release-I-10-002, NRC Staff to Meet with Constellation on Jan. 19 in Baltimore to Discuss Performance of Companys Nuclear Plant Fleet2010-01-13013 January 2010 Press Release-I-10-002: NRC Staff to Meet with Constellation on Jan. 19 in Baltimore to Discuss Performance of Companys Nuclear Plant Fleet Press Release-09-171, NRC Approves License Transfers for Constellation/Edf Nuclear Joint Venture2009-10-0909 October 2009 Press Release-09-171: NRC Approves License Transfers for Constellation/Edf Nuclear Joint Venture Press Release-I-09-038, NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 152009-09-10010 September 2009 Press Release-I-09-038: NRC, Constellation Energy to Discuss Dry Cask Storage at Company'S Nuclear Power Plants on Sept. 15 Press Release-09-128, NRC Approves Power Uprate for Calvert Cliffs Nuclear Power Plant2009-07-23023 July 2009 Press Release-09-128: NRC Approves Power Uprate for Calvert Cliffs Nuclear Power Plant Press Release-I-09-018, NRC to Conduct Open House on April 7 Regarding Annual Assessment of Performance for Calvert Cliffs Plant2009-03-31031 March 2009 Press Release-I-09-018: NRC to Conduct Open House on April 7 Regarding Annual Assessment of Performance for Calvert Cliffs Plant Press Release-09-025, Licensing Board to Discuss Calvert Cliffs New Reactor Application on Feb. 202009-02-0909 February 2009 Press Release-09-025: Licensing Board to Discuss Calvert Cliffs New Reactor Application on Feb. 20 Press Release-I-08-017, NRC to Discuss Calvert Cliffs Nuclear Plant Annual Assessment at Public Meeting Scheduled for April 8 in Prince Frederick, Md2008-04-0101 April 2008 Press Release-I-08-017: NRC to Discuss Calvert Cliffs Nuclear Plant Annual Assessment at Public Meeting Scheduled for April 8 in Prince Frederick, Md Press Release-07-093, - NRC Meeting Aug. 14 in Solomons, MD to Discuss Review Process for Calvert Cliffs Reactor Application2007-07-30030 July 2007 Press Release-07-093 - NRC Meeting Aug. 14 in Solomons, MD to Discuss Review Process for Calvert Cliffs Reactor Application Press Release-07-089, - Calvert Cliffs Environmental Report Available, Public Meeting August 14 in Solomons, MD2007-07-25025 July 2007 Press Release-07-089 - Calvert Cliffs Environmental Report Available, Public Meeting August 14 in Solomons, MD ML0713504082007-05-15015 May 2007 Press Release I-07-028 - NRC to Discuss 2006 Assessment for Calvert Cliffs Nuclear Plant Press Release-I-06-062, New NRC Senior Resident Inspector Assigned to Calvert Cliffs Nuclear Plant2006-11-30030 November 2006 Press Release-I-06-062: New NRC Senior Resident Inspector Assigned to Calvert Cliffs Nuclear Plant Press Release-I-06-023, NRC to Discuss 2005 Performance Assessment for Calvert Cliffs Nuclear Power Plant2006-04-14014 April 2006 Press Release-I-06-023: NRC to Discuss 2005 Performance Assessment for Calvert Cliffs Nuclear Power Plant Press Release-I-05-019, NRC to Discuss 2004 Performance Assessment for Calvert Cliffs Nuclear Power Plant2005-04-0707 April 2005 Press Release-I-05-019: NRC to Discuss 2004 Performance Assessment for Calvert Cliffs Nuclear Power Plant Press Release-I-04-014, NRC to Discuss Annual Performance Assessment of Calvert Cliffs Nuclear Power Plant2004-03-23023 March 2004 Press Release-I-04-014: NRC to Discuss Annual Performance Assessment of Calvert Cliffs Nuclear Power Plant 2023-03-03
[Table view] |
Text
No: I-16-011 April 15, 2016
Contact:
Neil Sheehan, 610-337-5331 Diane Screnci, 610-337-5330 NRC to Hold Open House on April 21 to Discuss 2015 Performance of Calvert Cliffs Nuclear Power Plant The Nuclear Regulatory Commission will conduct a public open house on Thursday, April 21, in Prince Frederick, Md., to discuss the agencys annual review of safety performance at the Calvert Cliffs nuclear power plant.
NRC staff will be at the Springhill Suites Hotel, at 75 Sherry Ln. in Prince Frederick, from 5-6:30 p.m. to discuss the plants performance in 2015 and the agencys oversight plans for the remainder of 2016. On hand will be agency employees responsible for inspections of the plant, including the Resident Inspectors based at the Lusby, Md., facility on a full-time basis.
The NRCs Reactor Oversight Process is the foundational program that enables the agency to successfully complete its mission of assessing plant safety. Under that program, the NRC gauges plant performance through the use of color-coded inspection findings and performance indicators, which are statistical measurements of plant performance that can trigger additional oversight if exceeded.
Based on its 2015 reviews, the NRC determined that Calvert Cliffs operated safely during 2015.
As of the end of last year, the Exelon-owned and -operated twin-reactor plant had no inspection findings or performance indicators that were greater than green (very low safety significance).
Therefore, the plant is currently under the NRCs normal level of oversight.
The NRCs normal level of oversight at each U.S. nuclear power plant involves thousands of hours of inspection. In 2015, the agency devoted approximately 6,645 hours0.00747 days <br />0.179 hours <br />0.00107 weeks <br />2.454225e-4 months <br /> of review at Calvert Cliffs.
Our Annual Assessments allow us to step back at regular intervals and size up plant performance. However, we view oversight of each facility as an ongoing responsibility, NRC Acting Region I Administrator David Lew said. In the case of Calvert Cliffs, the plants current performance qualifies for our normal level of oversight.
The NRC issues reports on performance at each plant twice a year: during the mid-cycle, or mid-point, of the year, and at the conclusion of the year. Inspection findings and performance indicators are also updated on a quarterly basis on the agencys website. Following the release of the Annual Assessment letters each March, the NRC meets with the public in the vicinity of each plant to discuss the results. Normal inspections are performed by Resident Inspectors assigned to Calvert Cliffs. Each plant has two Resident Inspectors. Reviews are also carried out at the sites by specialist inspectors assigned to the agencys Region I Office in King of Prussia, Pa.
Among the areas to be inspected this year at Calvert Cliffs are radiological safety, fire protection and emergency planning. In addition, the NRC will perform an inspection of the plants Independent Spent Fuel Storage Installation (ISFSI) and the sites implementation of NRC post-Fukushima requirements.
The Annual Assessment letter for Calvert Cliffs, as well as the notice for the April 21, open house, are available on the NRC website. Current performance information is also available for Calvert Cliffs Unit 1 and Unit 2.
Page l 2
No: I-16-011 April 15, 2016
Contact:
Neil Sheehan, 610-337-5331 Diane Screnci, 610-337-5330 NRC to Hold Open House on April 21 to Discuss 2015 Performance of Calvert Cliffs Nuclear Power Plant The Nuclear Regulatory Commission will conduct a public open house on Thursday, April 21, in Prince Frederick, Md., to discuss the agencys annual review of safety performance at the Calvert Cliffs nuclear power plant.
NRC staff will be at the Springhill Suites Hotel, at 75 Sherry Ln. in Prince Frederick, from 5-6:30 p.m. to discuss the plants performance in 2015 and the agencys oversight plans for the remainder of 2016. On hand will be agency employees responsible for inspections of the plant, including the Resident Inspectors based at the Lusby, Md., facility on a full-time basis.
The NRCs Reactor Oversight Process is the foundational program that enables the agency to successfully complete its mission of assessing plant safety. Under that program, the NRC gauges plant performance through the use of color-coded inspection findings and performance indicators, which are statistical measurements of plant performance that can trigger additional oversight if exceeded.
Based on its 2015 reviews, the NRC determined that Calvert Cliffs operated safely during 2015.
As of the end of last year, the Exelon-owned and -operated twin-reactor plant had no inspection findings or performance indicators that were greater than green (very low safety significance).
Therefore, the plant is currently under the NRCs normal level of oversight.
The NRCs normal level of oversight at each U.S. nuclear power plant involves thousands of hours of inspection. In 2015, the agency devoted approximately 6,645 hours0.00747 days <br />0.179 hours <br />0.00107 weeks <br />2.454225e-4 months <br /> of review at Calvert Cliffs.
Our Annual Assessments allow us to step back at regular intervals and size up plant performance. However, we view oversight of each facility as an ongoing responsibility, NRC Acting Region I Administrator David Lew said. In the case of Calvert Cliffs, the plants current performance qualifies for our normal level of oversight.
The NRC issues reports on performance at each plant twice a year: during the mid-cycle, or mid-point, of the year, and at the conclusion of the year. Inspection findings and performance indicators are also updated on a quarterly basis on the agencys website. Following the release of the Annual Assessment letters each March, the NRC meets with the public in the vicinity of each plant to discuss the results. Normal inspections are performed by Resident Inspectors assigned to Calvert Cliffs. Each plant has two Resident Inspectors. Reviews are also carried out at the sites by specialist inspectors assigned to the agencys Region I Office in King of Prussia, Pa.
Among the areas to be inspected this year at Calvert Cliffs are radiological safety, fire protection and emergency planning. In addition, the NRC will perform an inspection of the plants Independent Spent Fuel Storage Installation (ISFSI) and the sites implementation of NRC post-Fukushima requirements.
The Annual Assessment letter for Calvert Cliffs, as well as the notice for the April 21, open house, are available on the NRC website. Current performance information is also available for Calvert Cliffs Unit 1 and Unit 2.