l I

CENTERCOR ENERGY PERRY NUCLEAR POWER PLANT Mail Address:

Donald C. Shelton 10 CENTER ROAD P RR, OHIO 44081 PERRY, OHIO 44081 NUCLEAR (216) 259 3737 April [/, 1996 PY-CEI/NRR-2042L

)

United States Nuclear Regulatory Commission Document Control Desk Vashington, D.C.

20555 Perry Nuclear Power Plant Docket No.

50-440 Monthly Operating Report Gentlemen:

Attached is the March 1996 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

If you have any questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Very tr

yours, Donald on GMN sc Attachment cc: NRC Project Manager NRC Resident Inspector Office NRC Region III 9604170047 960331 DR ADOCK 0500 160062 Opero'.rg Compo">es C: eve; crc E ec' c e ac;

}

l 6eca Ed sa" l

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT March 1, 1996 - March 31, 1996 MONTHLY OPERATING REPORT TO NRC

. DOCKET NUMBER:

50-440 LICENSE NUMBER: NPF-58 l

l

,v-

Table of Contents Average Daily Unit Power Level......................

1 Operating Data Report

.2 Unit Shutdowns and Power Reductions

.3 i

l r

l 1

AVERAGE DAILY UNIT POWER LEVEL j

I j

DOCKET NO.

50-440 l

UNIT Perry One DATE 4/15/96 l

CONTACT G.M.Neuman l

TELEPHONE (216)280-5815 l

M0ffrH MARCH 1996 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l

(MWe-Net)

(MWe-Net) l 1

0 17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

l I

l l

l i

j i

{

OPERATING DATA REPORT 1

UNIT:

Perry One DATE:

4/15/96 i OPERATING STATUS i,

1 1.

Docket:

50-440 2.

Raporting Period:

MARCH 1996 3.

Utility

Contact:

G.M.Neuman 4.

Licensed Thermal. Power (MVt):

3579 l

5.

Nimeplate Rating (Gross MWe):

1250 i

6.

Design Electrical Rating (Net HWe):

1191 l. 7.

Maximum Dependable Capacity (Gross MWe):

1225 8.

Maximum Dependable Capacity (Net MWe):

1166 j

9.

If Changes Occur in Capacity Ratings (Item Numbers 4 through 8) Since Last Report, Give Reasons:

i i

None I

i l

11..

Power Level to Which Restricted, if any (Net HWe):

100%

l 10.

Raasons for Restrictions, if any: Operating License 4

i i

i i

This Month Yr-to-Date Cumulative

{ 12.

Hours In Reporting Period 0

2,184.0 73,356.0

! 13. Hours Reactor was Critical 0

626.7 50,935.1 14.

Reactor Reserve Shutdown Hours 0

0.0 0.0 15.

Hours Generator On-Line 0

625.2 49,089.1

! 16.

Unit Reserve Shutdown Hours 0

0.0 0.0

} 17. Gross Thermal Energy (MVH) 0 1,806,764 166,883,855 l 18.

Gross Electrical Energy (MVH) 0 608,929 57,215,000

! 19.

Net Electrical Energy (MVH) 0 577,443 54,374,090

20.

Unit Service Factor 0.0%

28.6%

66.9%

i 21.

Unit Availability Factor 0.0%

28.6%

66.9%

! 22.

Unit Capacity Factor (using MDC Net) 0.0%

22.7%

64.1%

i 23.

Unit Capacity Factor (Using i

DER' Net)

O.0%

22.2%

62.2%

l 24.

Unit Forced Outage Rate 0.0%

0.0%

10.5%

i 25.

Forced Outage Hours 0.0 0.0 5,779.1 4'26.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 1 27.

If Shutdown at end of Report Period, Estimated Date of Startup:

j 4/13/96 i

1 l

f i

v s.+

e-r

-c'e2.--r2--

i.s

--wt e==4i

-e*---+'-r

  • +=

4-e-

e v---

d=

  • e

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH MARCH 1996 s

DOCKET NO. 50-440 j

UNIT NAME Perry One DATE 4/15/96 l

CONTACT G.M.Neuman

[

j TELEPHONE (216)280-5815 f

I NO.

DATE TYPE DURATION REASON METHOD LER SYSTEM COMP.

CAUSE & CORRECTIVE ACTION TO PREVENT l

1 HOURS 2

3 4

5 RECURRENCE l

96-01 1/27/96 S

744.0 C

4 N/A N/A N/A REFUEL OUTAGE 15.

SUMMARY

Perry Unit One continued Refuel Outage activities through the month.

1.

TYPE:

2.

REASON:

3.

METHOD 4.

EXHIBIT G-Instructions F:

Forced A-Equipment Failure (explain) 1-Manual for preparation of data S: Scheduled B-Maintenance or Test 2-Manual Scram entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) file D-Regulatory Restriction 4-Continued (NUREG 1022)

E-Operator Training &

5-Reduced Load License Examination 9-Other 5.

EXHIBIT 1-Same Source F-Administrative G-Operational Error (explain)

H-Other (explain)

-.