CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POVER PLANT October 1, 1987 - October 31, 1987 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440 LICENSE NUMBER: NPF-58 8711190091 871031

([I PDR ADOCK 05000440 R

PDR

d t

Table of Contents

.1 Operations Summary......

Average Daily Unit Power Level.................

2-

....3 Operating Data Report.

i 1

l i

1 I

q

-_-_-__-___-.-__---A

October "1987 Operations Su'mmary Revork of the B outboard Main Steam Isolation Valve (MSIV).

'On Octob'r 12,c1987 the.

continued into the month of October.

e plant'was. returned-to Operational. condition l1 and generator synchronization:as Test Condition 6 resumed. On.0ctober 20, the 100 hour0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> Warranty Run was begun. The Warranty Run'vas successfully completed on the morning of October;24,<followed.

. by. completion 'of the Generator' Load Reject :. test, which included.a planned reactor scram as the final test in TC 6.

The plant was restarted'the next day, and Test Condition 7.

was entered on October 26.-

An' inadvertent deenergization.of a plant electrical bus on October 27 resulted in a low reactor vessel water level scram.

An Unusual Event was.

declared due to the actuation of the High~ Pressure Core Spray-System. The plant was restarted and'the generator synchronized to the grid on October 28 resuming Test:

Condition 7 testing.. On'0ctober 30, during'a fast. closure test of the MSIV's, three valves were found to have slov-closure times upon the first testing' stroke..' Subsequent strokes were'found to be acceptable. l Test Condition 7 testing was completed, and Test Condition 8 was entered on-1 October.30. At.the end of the month, the plant vas op'erating at approximately 99% reactor power, producing 1218 HVe gross.

e 9

y

__1._.-

m l

.r Average Daily Unit-Power Level DOCKET No. 50-440 UNIT l Perry-One-

-DATE 11/13/87

. Contact G.A.Dunn' Telephone (216)259-3737 MONTH October ~1987 DAY.

AVERAGE DAILY POVER LEVEL DAY AVERAGE DAILY'POVER LEVEL (MVe-Net);

(MVe-Net)-

l 1

0 17 997=

2 0

18

.931~

3 0

19.

1074:-

4 0

20 1133 5

0 21 1151 6

0 22 1159 7

-0

~ 23 1157 8

0 24 553 9

0 25 0-10 0

26-112

~~

11 0

27 78 12 4

28

100, 13 292 29

-751:

14 850 30 928 15 985 31 974

'16 1047 INSTRUCTIONS On this format list the' average daily. unit power level in HWe-Net.for each day in the reporting month. Compute to the nearest whole megawatt.-

Je L

l'

q Operating Data Report j

l DOCKET N0.

50-440

?

DATE 11/13/87 CONTACT G.A.Dunn TELEPHONE (216)259-3737 OPERATING STATUS 1.

Unit Name:

Perry-One-2.

Reporting Period:

October 1987 j

3.

Licensed Thermal Power (MVt):

3579 1

4.

Nameplace Rating (Gross MWe):

1250 i

5.

Design Electrical Rating (Net MVe): 1205 1

6.

Maximum Dependable Capacity (Gross MVe):

N/A 7.

Maximum Dependable Capacity (Net MVe):

N/A 8.

If Changes occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:

None l

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons for Restrictions, If Any:

N/A l

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 745 7,296 14,976
12. Hours Reactor Was Critical 450.3 3,553 4,982.6
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 380.7 2,530.6 2,533.1
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy (MVH) 1,075,198 5,080,382 5,185,718
17. Gross Electrical Energy (MVH) 363,140 1,614,060 1,614,296
18. Net Electrical Energy (MVH) 337,154 1,461,454 1,461,454
19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (Using NOT IN COMMERCIAL OPERATION l

MDC Net)

22. Unit Capacity Factor (Using DER Net) l
23. Unit Forced Outage Rate f
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N/A

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

f Forecast Achieved INITIAL CRITICALITY 06/06/86 i

  • INITIAL ELECTRICITY 12/19/86 100 HOUR VARRANTY RUN 10/24/87
    • COMMERCIAL OPERATION 11/13/86 l

Generator Synchronization l

End Power Ascension Testing l

N/A Not applicable until commercial operation l

)

l

l t Tile-CLEVELAND ELECTR P,0 BOX 97 s

PERRY, OHIO 44001 m TELEPHONE (216) 259 3737 a

ADDRESS-10 CENTER ROAD

-)

Scrying The Best Location in the Nation Murray R. Edelman' PERRY NUCLEAR POWER PLANT I

5R. VIG PRESIDENT NUCLEAR November 13, 1987 PY-CEl/NRR-0749 L l

Document Control Desk

'i U.S. Nuclear Regulatory Commission Washington, D. C.

20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report l

Dear Sir.

Attached is the October 1987 monthly operating report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

Please f eel f ree to contact me if you have any questions.

Very ruly yours, o

w 4

Murray R. Edelman 4

f Senior Vice President Nuclear. Group MRE:njc i

l Attachment cc:

T. Colburn K. Connaughton USNRC, Region III Director, Of fice of Resource Management

- a