9 CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT-MONTHLY OPERATING REPORT TO NRC June 1, 1986 - June 30, 1986 DOCKET NUMBER:
50-440 LICENSE NUMBER: NPF-45 Submitted By: h O
Plant Technical Manager 2
PlantOperations{ Manager 8609110360 860630
/
'3 PDR ADOCK 05000440 R
\\
g a
Table of Contents Operations Summary.
I Average Daily Unit Power Level.
.2 Operating Data Report
.3 Unit Shutdown and Power Reductions
.4 1
I
(
l
(
t
r Operations Summary Initial criticality occurred on June 6, 1986. Remaining
-preoperational testing activities continued. Technical Specification changes for full power operation were submitted on June 18, 1986.
The final seismological / geological report of the January 31, 1986 earthquake was: submitted on June 24, 1986. FSAR Amendment 25 was submitted on June 27, 1986. On June 29, 1986, the Reactor Coolant System Leakage Test was completed satisfactorily.
On June 20, 1986, combustion in the off gas charcoal adsorbers occurred resulting in an Unusual Event. The Unusual Event was terminated on June 23, 1986. A Confirmatory Action Letter re-stricting start-up until questions concerning the off gas charcoal fire are resolved, was issued on June 23, 1986.
e
~
a.
r Average Daily Unit Power Level DOCKET NO. 50-440 UNIT Perry - One DATE 07/01/86 COMPLETED BY J. Richardt TELEPHONE 216/259-3737 MONTH June, 1986 DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
3 0
18 0
2 0
19
'O 4
0 20 0
5
'O 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
0 12 0
28 13 0
29 0
14 0
30 0
15 0
31 N/A 16 0
1 INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Operating Drta Report DOCKET NO. 50-440 DATE 07/01/86 COMPLETED BY J. Richardt TELEPHONE 216/259-3737 OPERATING STATUS 1.
Unit Name: Perry-One 2.
Reporting Period:
June. 1986 3.
Licensed Thermal Power (MWt): 178 4.
Nameplate Rating (Gross MWe):
1250 5.
Design Electrical Rating (Net MWe):
1205 6
Maximum Dependable Capacity (Gross MWe): N/A 7.
Maximum Dependable Capacity (Net MWe): N/A 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report. Give Reasons:
N/A 9.
Power Level To Which Restricted.
If Any (Net MWe):
0 10.
Reasons for Restrictions.
If Any: NRC Restriction to 5% Reactor Power.
This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 720 2519 2519 12.
Number of Hours Reactor Was 1.13 1.13 1.13 Critical 13.
Reactor Reserve Shutdown Hours 0
0 0
14. Hours Generator On-Line 0
0 0
15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated 0
0 0
(MWH) 17.
Gross Electrical Energy Generated 0
0 0
(MWH) 18.
Net Electrical Energy Generated 0
0 0
(MWH) 19.
Unit Service Factor 0
0 0
20.
Unit Availability Factor 0
0 0
21.
Unit Capacity Factor (Using 0
0 0
MDC Net) 22.
Unit Capacity Factor (Using 0
0 0
DER Net) 23.
Unit Forced Outage Rate 0
0 0
24.
Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):
None 25.
If Shut Down At End of Report Period. Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 06/06/86
- INITIAL ELECTRICITY 07/28/86
- COMMERCIAL OPERATION 11/13/86
- Generator Syncronization
- End Power Ascension ( 100 Hour Warranty Run)
N/A - Not applicable due to 5% Power Restriction
i 7
e t
3 G
n d
7 O
r 3 E
6 a
R 8
h 9
U 0
/
c 5 N
4 y
1 i
2 e(
4 r 0 R
/
s e
r /
6 nase ot nl e
0 e 7 1
iaei c
5 P 0 J
2 t D cF r
c i
u
.EEYE uf L) o OMTBN ro R
S NAA O
t rE NDDH s noL e
T EP nof(
KI EL t st S
CN LE
- at r OU PT r eo 1
D M
G aep O
ph e t
C e
e t eSR i
v c
ir b
i n
bP yt) i t
e i
rn2 h
c r
eor h rt e2 x
xonv0 E
rt u EfEE1 5
r c
one C oR i
& t t cn eA e s
v u
e a
r C
P SN O
I TC m)
U 6
an D
8 ri E
9 mca R
1 aSl r
p ccx R
E e
SiE t(
W n
O u
l l a aamr P
J d uuoe D
H onnt h N
T h aaut g
t MMAO Q,a A
N e - - - -
O S
M Ugggo M1 234 NW T
O R
D O
gg
)
)
T P
p n
n U
E E gg i
i H
R S
a a
l l
T p
n p
x o
x I
e E
i E
N e
( t t & n
(
U st t s
c o
nnr ee i gi r
eeo rT rnt o
cvp u
ti a r) iE e l r s nnern L
R i o eii vEi a
R ami a
F e ratll 2f gg gca c
yT x aap
" ac, gljm t ngr E rnx nanor t oE o yj%E enit oesi(
j mel at sit
- pt el annar ninuureire mgg$
ouif gec meh s q a e e pi d pt aEMRROLAOO q g$ -
e - - - - -
j RABCDE FGH c0, y$o qg*
d e
l d u e
ed t
ce a
rh D
oc FS o
FS N
(
k THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. GOX $000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG.
- 55 PUBLIC SQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN SR VICE PRESCENT NUC LE A R July 10, 1986 PY-CEI/NRR-0498 L Mr. Lee Hiller Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report
Dear Mr. Hiller:
Attached is the June, l'986 monthly operating report for Perry Unit 1.
This report is submitted in accordance with Technical Specification 6.9.1.8.
Please feel free to contact me if you have any questions.
Very truly yours, t~
Murray R. Edelman Senior Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.