PNP 2016-019, Supplement to Notification of Full Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.

From kanterella
Jump to navigation Jump to search
Supplement to Notification of Full Compliance with NRC Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events.
ML16083A285
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/23/2016
From: Vitale A
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-049, PNP 2016-019
Download: ML16083A285 (2)


Text

'"

  • ~* Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043-9530 Tel 269-764-2000 Anthony J. Vitale Site Vice President PNP 2016-019 March 23, 2016 u.s. Nuclear Regulatory Commission ATIN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Supplement to Notification of Full Compliance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

REFERENCES:

1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-8asis External Events, dated March 12, 2012 (ADAMS Accession No. ML12054A736).
2. Entergy Nuclear Operations, Inc. letter, PNP 2015-083, Notification of Full Compliance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for 8eyond-Design-Basis External Events," dated December 16, 2015 (ADAMS Accession No. ML15351A369).

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which was immediately effective and directed Entergy Nuclear Operations, Inc. (ENO) to develop and implement strategies and guidance to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event (Reference 1).

On December 16, 2015, ENO provided notification of full compliance with NRC Order EA-12-049 for the Palisades Nuclear Plant (PNP) (Reference 2). The letter included the Final Integrated Plan (FIP) for PNP. The FIP provided strategies to maintain or restore

PNP 2016-019 Page 2 of 2 core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event at PNP.

A discrepancy has been discovered in the description of the on site FLEX portable diesel generators in the FIP. The FIP described the rating of the onsite FLEX portable diesel generators as 480 V, 500kVA, and 400 kW (standby rating). However, the ratings of the diesel generators actually selected are 480 V, 636 kVA, and 509 kW (standby rating),

and 480 V, 578 kVA, and 463 kW (prime rating). ENO plans to revise the FIP to reflect the prime rating of the selected diesel generators. This discrepancy appears on pages 16, 51, and 109 of the FIP. The discrepancy does not otherwise affect the strategy provided in the FIP.

This letter contains no new commitments and no revised commitments.

I declare under penalty of perjury that the foregoing is true and correct; executed on March 23, 2016.

Sincerely, cc: Office Director, NRR, USNRC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

  • ~* Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043-9530 Tel 269-764-2000 Anthony J. Vitale Site Vice President PNP 2016-019 March 23, 2016 u.s. Nuclear Regulatory Commission ATIN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852

SUBJECT:

Supplement to Notification of Full Compliance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

REFERENCES:

1. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-8asis External Events, dated March 12, 2012 (ADAMS Accession No. ML12054A736).
2. Entergy Nuclear Operations, Inc. letter, PNP 2015-083, Notification of Full Compliance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for 8eyond-Design-Basis External Events," dated December 16, 2015 (ADAMS Accession No. ML15351A369).

Dear Sir or Madam:

On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events," which was immediately effective and directed Entergy Nuclear Operations, Inc. (ENO) to develop and implement strategies and guidance to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event (Reference 1).

On December 16, 2015, ENO provided notification of full compliance with NRC Order EA-12-049 for the Palisades Nuclear Plant (PNP) (Reference 2). The letter included the Final Integrated Plan (FIP) for PNP. The FIP provided strategies to maintain or restore

PNP 2016-019 Page 2 of 2 core cooling, containment, and spent fuel pool cooling capabilities in the event of a beyond-design-basis external event at PNP.

A discrepancy has been discovered in the description of the on site FLEX portable diesel generators in the FIP. The FIP described the rating of the onsite FLEX portable diesel generators as 480 V, 500kVA, and 400 kW (standby rating). However, the ratings of the diesel generators actually selected are 480 V, 636 kVA, and 509 kW (standby rating),

and 480 V, 578 kVA, and 463 kW (prime rating). ENO plans to revise the FIP to reflect the prime rating of the selected diesel generators. This discrepancy appears on pages 16, 51, and 109 of the FIP. The discrepancy does not otherwise affect the strategy provided in the FIP.

This letter contains no new commitments and no revised commitments.

I declare under penalty of perjury that the foregoing is true and correct; executed on March 23, 2016.

Sincerely, cc: Office Director, NRR, USNRC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC