Transmittal of 2015 Steam Generator Tube Inspection Report
ML16092A088
Person / Time
Site: Palisades Entergy icon.png
Issue date: 03/30/2016
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16092A086 List:
References
PNP 2016-008
Download: ML16092A088 (1)


Text

. ~Entergy PNP 2016-008 March 30, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

2015 Steam Generator Tube Inspection Report Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

Dear Sir or Madam:

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager Entergy Nuclear Operations, Inc. is providing the enclosed 2015 steam generator tube inspection report in accordance with Palisades Nuclear Plant Technical Specifications Section 5.6.8, Steam Generator Tube Inspection Report. The specification requires that the report be submitted within 180 days after entry into mode 4 following completion of the inspection. Mode 4 was entered on October 17, 2015.

This letter contains no new commitments and no revised commitments.

Sincerely, 9A\\~

JAH/jpm

Attachment:

Palisades Nuclear Plant Steam Generator Tube Inspection Report, 2015 Refueling Outage, 1 R24, AREVA Inc. Document Number 51-9252894-001 cc:

Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC

. ~Entergy PNP 2016-008 March 30, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

2015 Steam Generator Tube Inspection Report Palisades Nuclear Plant Docket 50-255 Renewed Facility Operating License No. DPR-20

Dear Sir or Madam:

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager Entergy Nuclear Operations, Inc. is providing the enclosed 2015 steam generator tube inspection report in accordance with Palisades Nuclear Plant Technical Specifications Section 5.6.8, Steam Generator Tube Inspection Report. The specification requires that the report be submitted within 180 days after entry into mode 4 following completion of the inspection. Mode 4 was entered on October 17, 2015.

This letter contains no new commitments and no revised commitments.

Sincerely, 9A\\~

JAH/jpm

Attachment:

Palisades Nuclear Plant Steam Generator Tube Inspection Report, 2015 Refueling Outage, 1 R24, AREVA Inc. Document Number 51-9252894-001 cc:

Administrator, Region Ill, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC