MONTHYEARPNO-III-18-002, Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing by Firstenergy Solutions2018-04-0404 April 2018 PNO-III-18-002: Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing by Firstenergy Solutions PNO-III-16-004, A - Unplanned Shutdown of Davis-Besse Nuclear Power Station for Greater than 72 Hours - Update2016-09-23023 September 2016 PNO-III-16-004A - Unplanned Shutdown of Davis-Besse Nuclear Power Station for Greater than 72 Hours - Update ML16257A2032016-09-13013 September 2016 PNO-III-16-004, Davis-Besse Nuclear Power Station, Unplanned Shutdown for Greater than 72 Hours PNO-III-15-006, Davis-Besse Shutdown Due to Secondary Side Steam Line Rupture2015-05-13013 May 2015 PNO-III-15-006: Davis-Besse Shutdown Due to Secondary Side Steam Line Rupture PNO-III-14-003, A - Update to Davis-Besse Shield Building Restoration2014-04-28028 April 2014 PNO-III-14-003A - Update to Davis-Besse Shield Building Restoration ML14050A0262014-02-19019 February 2014 PNO-III-14-003: Davis-Besse Shield Building Voids PNO-III-13-007, Davis-Besse Shield Building Laminar Cracks2013-09-20020 September 2013 PNO-III-13-007 Davis-Besse Shield Building Laminar Cracks PNO-III-13-006, A: Davis Besse Preliminary Notification Update Unplanned Shutdown Greater than 72 Hours on June 29, 2013, Due to Trip of Reactor Coolant Pump and Subsequent Discovery of Reactor Pressure Boundary Leakage2013-07-15015 July 2013 PNO-III-13-006A: Davis Besse Preliminary Notification Update Unplanned Shutdown Greater than 72 Hours on June 29, 2013, Due to Trip of Reactor Coolant Pump and Subsequent Discovery of Reactor Pressure Boundary Leakage ML13184A1762013-07-0202 July 2013 PNO-III-13-006 - Davis Besse Unplanned Shutdown Greater than 72 Hours on June 26, 2013, Due to Trip of Reactor Coolant Pump and Subsequent Discovery of Reactor Pressure Boundary Leakage PNO-III-11-014, Davis-Besse Shield Building Indications2011-10-20020 October 2011 PNO-III-11-014, Davis-Besse Shield Building Indications PNO-III-10-011, DAVIS-BESSE Start-Up of Following Repairs of Control Rod Drive Mechanism Nozzle Flaw Indications2010-06-29029 June 2010 PNO-III-10-011 - DAVIS-BESSE Start-Up of Following Repairs of Control Rod Drive Mechanism Nozzle Flaw Indications PNO-III-10-008, Davis-Besse, Public Availability of Two NRC Employee Differing Professional Opinions Concerning Past Issues at Davis-Besse2010-05-20020 May 2010 PNO-III-10-008: Davis-Besse, Public Availability of Two NRC Employee Differing Professional Opinions Concerning Past Issues at Davis-Besse PNO-III-10-003, A - Davis-Besse Nuclear Power Station - Update - Davis-Besse Control Rod Drive Mechanism Nozzle Indications2010-04-12012 April 2010 PNO-III-10-003A - Davis-Besse Nuclear Power Station - Update - Davis-Besse Control Rod Drive Mechanism Nozzle Indications ML1007503172010-03-16016 March 2010 PNO-III-10-003 - Davis-Besse Nuclear Power Station - Davis-Besse Control Rod Drive Mechanism Nozzle Indications PNO-III-09-005, A: Davis-Besse, Transitory Alert Due to Electric Device Failure (Update)2009-06-29029 June 2009 PNO-III-09-005A: Davis-Besse, Transitory Alert Due to Electric Device Failure (Update) ML0917706352009-06-26026 June 2009 PNO-III-09-005: Davis-Besse, Transitory Alert Due to Electric Device Failure PNO-III-06-002, Security Event at Davis-Besse2006-01-23023 January 2006 PNO-III-06-002-Security Event at Davis-Besse PNO-III-04-008, Davis Besse Issued 08/04/2004 Re Automatic Reactor Shutdown2004-08-0404 August 2004 PNO-III-04-008: Davis Besse Issued 08/04/2004 Re Automatic Reactor Shutdown PNO-III-04-003, Shutdown of the Davis-Besse Nuclear Power Station Plant for Greater than 72 Hours2004-03-17017 March 2004 PNO-III-04-003: Shutdown of the Davis-Besse Nuclear Power Station Plant for Greater than 72 Hours PNO-III-03-010, Davis Besse: Fuel Loading2003-02-21021 February 2003 PNO-III-03-010, Davis Besse: Fuel Loading PNO-III-02-036, Crack Identified in Vessel Head Stainless Steel Liner2002-09-10010 September 2002 PNO-III-02-036: Crack Identified in Vessel Head Stainless Steel Liner ML0308703762002-09-10010 September 2002 Preliminary Notification of Event or Unusual Occurrence -- PNO-III-02-036 PNO-III-02-016, A; Discrete Radioactive Particles Found Outside the Radiologically Restricted Area, Davis-Besse Update2002-04-24024 April 2002 PNO-III-02-016A; Discrete Radioactive Particles Found Outside the Radiologically Restricted Area, Davis-Besse Update PNO-III-02-006, B, Davis Besse - Reactor Vessel Head Degradation (Second Update)2002-04-0505 April 2002 PNO-III-02-006B, Davis Besse - Reactor Vessel Head Degradation (Second Update) ML0235800962002-03-11011 March 2002 E-mail from PN1 to Events, Front, PN1, PN302006, Davis-Besse - Update - Significant Metal Loss Observed in Reactor Vessel Head 2018-04-04
[Table view] |
PRELIMINARY NOTIFICATION - REGION III September 20, 2013 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE - PNO-III-13-007 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. Some of the information may not yet be fully verified or evaluated and is basically all that is known by the Region III staff on this date.
Facility Licensee Emergency Classification Davis-Besse Nuclear Power Station ___ Notification of Unusual Event First Energy Nuclear Operating Company ___ Alert Oak Harbor, Ohio ___ Site Area Emergency Docket: 50-346 ___ General Emergency X Not Applicable
SUBJECT:
DAVIS-BESSE SHIELD BUILDING LAMINAR CRACKS On August 26, 2013, the licensee was performing examinations of core bores in the shield building in accordance with the commitments First Energy Nuclear Operating Company (FENOC) made to the NRC. The commitment is for long term monitoring of the shield building which was documented in the NRCs Confirmatory Action Letter dated December 2, 2011 (ADAMS ML11336A355). The examinations performed in 2011 and 2012 showed no additional cracks. This year, using new instrumentation with enhanced capabilities, plant workers identified a crack that had not been seen before. To date, the core bore examinations revealed seven previously unidentified cracks. FENOC has taken steps to reevaluate 43 core bores and will be looking at the remaining 39 going forward.
Its important to emphasize that the shield building at Davis-Besse is not the reactor containment vessel. That vessel is made of one-inch thick welded steel and sits inside of the shield building separated by about four and a half feet of hollow space. The shield buildings primary function is to protect the containment building against external hazards. The steel vessel is designed to keep the radiation inside the reactor from reaching the environment.
Based on the current information, this issue does not compromise the safety of the plant or the public. The NRC continues to conclude that the additional cracks identified during the current inspection remain bounded by the licensees previous quantitative operability evaluation and the shield building is structurally sound and can continue to fulfill its safety function.
The NRC has been closely following this issue and independently reviewing the licensees actions. After the current cracks were identified, the NRC sent a structural inspector to the plant to observe and evaluate the licensees examination results, the current impact on the shield building, and the licensees extent of condition and evaluation plan.
The NRC will continue to monitor and independently verify FENOCs ongoing reviews and conclusions about the nature of these cracks and document the agencys assessment in a publicly available inspection report.
PNO-III-13-007 Background information regarding the Davis-Besse shield building cracking issue can be found in NRC Inspection Reports 05000346/2012007 and 05000346/2012009 (ADAMS ML12128A443 and ML12173A023).
The State of Ohio has been informed.
This preliminary notification is issued for information only.
The information presented herein has been discussed with the licensee, and is current as of 3:00 p.m. Central Daylight Savings Time, September 20, 2013.
ADAMS Accession Number: ML13263A410
Contact:
David Hills 630-829-9733 David.Hills@nrc.gov