MONTHYEARPNO-III-18-002, Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing by Firstenergy Solutions2018-04-0404 April 2018 PNO-III-18-002: Beaver Valley, Davis-Besse, Perry Notification of Bankruptcy Filing by Firstenergy Solutions PNO-III-16-004, A - Unplanned Shutdown of Davis-Besse Nuclear Power Station for Greater than 72 Hours - Update2016-09-23023 September 2016 PNO-III-16-004A - Unplanned Shutdown of Davis-Besse Nuclear Power Station for Greater than 72 Hours - Update ML16257A2032016-09-13013 September 2016 PNO-III-16-004, Davis-Besse Nuclear Power Station, Unplanned Shutdown for Greater than 72 Hours PNO-III-15-006, Davis-Besse Shutdown Due to Secondary Side Steam Line Rupture2015-05-13013 May 2015 PNO-III-15-006: Davis-Besse Shutdown Due to Secondary Side Steam Line Rupture PNO-III-14-003, A - Update to Davis-Besse Shield Building Restoration2014-04-28028 April 2014 PNO-III-14-003A - Update to Davis-Besse Shield Building Restoration ML14050A0262014-02-19019 February 2014 PNO-III-14-003: Davis-Besse Shield Building Voids PNO-III-13-007, Davis-Besse Shield Building Laminar Cracks2013-09-20020 September 2013 PNO-III-13-007 Davis-Besse Shield Building Laminar Cracks PNO-III-13-006, A: Davis Besse Preliminary Notification Update Unplanned Shutdown Greater than 72 Hours on June 29, 2013, Due to Trip of Reactor Coolant Pump and Subsequent Discovery of Reactor Pressure Boundary Leakage2013-07-15015 July 2013 PNO-III-13-006A: Davis Besse Preliminary Notification Update Unplanned Shutdown Greater than 72 Hours on June 29, 2013, Due to Trip of Reactor Coolant Pump and Subsequent Discovery of Reactor Pressure Boundary Leakage ML13184A1762013-07-0202 July 2013 PNO-III-13-006 - Davis Besse Unplanned Shutdown Greater than 72 Hours on June 26, 2013, Due to Trip of Reactor Coolant Pump and Subsequent Discovery of Reactor Pressure Boundary Leakage PNO-III-11-014, Davis-Besse Shield Building Indications2011-10-20020 October 2011 PNO-III-11-014, Davis-Besse Shield Building Indications PNO-III-10-011, DAVIS-BESSE Start-Up of Following Repairs of Control Rod Drive Mechanism Nozzle Flaw Indications2010-06-29029 June 2010 PNO-III-10-011 - DAVIS-BESSE Start-Up of Following Repairs of Control Rod Drive Mechanism Nozzle Flaw Indications PNO-III-10-008, Davis-Besse, Public Availability of Two NRC Employee Differing Professional Opinions Concerning Past Issues at Davis-Besse2010-05-20020 May 2010 PNO-III-10-008: Davis-Besse, Public Availability of Two NRC Employee Differing Professional Opinions Concerning Past Issues at Davis-Besse PNO-III-10-003, A - Davis-Besse Nuclear Power Station - Update - Davis-Besse Control Rod Drive Mechanism Nozzle Indications2010-04-12012 April 2010 PNO-III-10-003A - Davis-Besse Nuclear Power Station - Update - Davis-Besse Control Rod Drive Mechanism Nozzle Indications ML1007503172010-03-16016 March 2010 PNO-III-10-003 - Davis-Besse Nuclear Power Station - Davis-Besse Control Rod Drive Mechanism Nozzle Indications PNO-III-09-005, A: Davis-Besse, Transitory Alert Due to Electric Device Failure (Update)2009-06-29029 June 2009 PNO-III-09-005A: Davis-Besse, Transitory Alert Due to Electric Device Failure (Update) ML0917706352009-06-26026 June 2009 PNO-III-09-005: Davis-Besse, Transitory Alert Due to Electric Device Failure PNO-III-06-002, Security Event at Davis-Besse2006-01-23023 January 2006 PNO-III-06-002-Security Event at Davis-Besse PNO-III-04-008, Davis Besse Issued 08/04/2004 Re Automatic Reactor Shutdown2004-08-0404 August 2004 PNO-III-04-008: Davis Besse Issued 08/04/2004 Re Automatic Reactor Shutdown PNO-III-04-003, Shutdown of the Davis-Besse Nuclear Power Station Plant for Greater than 72 Hours2004-03-17017 March 2004 PNO-III-04-003: Shutdown of the Davis-Besse Nuclear Power Station Plant for Greater than 72 Hours PNO-III-03-010, Davis Besse: Fuel Loading2003-02-21021 February 2003 PNO-III-03-010, Davis Besse: Fuel Loading PNO-III-02-036, Crack Identified in Vessel Head Stainless Steel Liner2002-09-10010 September 2002 PNO-III-02-036: Crack Identified in Vessel Head Stainless Steel Liner ML0308703762002-09-10010 September 2002 Preliminary Notification of Event or Unusual Occurrence -- PNO-III-02-036 PNO-III-02-016, A; Discrete Radioactive Particles Found Outside the Radiologically Restricted Area, Davis-Besse Update2002-04-24024 April 2002 PNO-III-02-016A; Discrete Radioactive Particles Found Outside the Radiologically Restricted Area, Davis-Besse Update PNO-III-02-006, B, Davis Besse - Reactor Vessel Head Degradation (Second Update)2002-04-0505 April 2002 PNO-III-02-006B, Davis Besse - Reactor Vessel Head Degradation (Second Update) ML0235800962002-03-11011 March 2002 E-mail from PN1 to Events, Front, PN1, PN302006, Davis-Besse - Update - Significant Metal Loss Observed in Reactor Vessel Head 2018-04-04
[Table view] |
Text
PRELIMINARY NOTIFICATION - REGION III February 19, 2014 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE
- PN-III-14-003 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance. The information is as initially received without verification or evaluation, and is basically all that is known by the Region III staff on this date.
Facility Licensee Emergency Classification Davis-Besse Nuclear Power Station __Notification of Unusual Event FirstEnergy Nuclear Operating Company __Alert Oak Harbor, OH __Site Area Emergency Docket: 50-346 __General Emergency License: NPF-3 X Not Applicable
SUBJECT:
DAVIS-BESSE SHIELD BUILDING VOIDS On February 14, 2014, the licensee informed the NRC that an unfilled area was discovered in the concrete along the top of the Davis-Besse shield building construction opening on the internal building side. The condition was discovered during the current steam generator replacement outage. This issue does not represent an immediate safety concern. The plant is currently shutdown and the reactor vessel is defueled. The licensee will have to resolve this issue before the plant can return to service.
The unfilled space was found in the 2.5 foot thick free-standing, reinforced concrete shield building. It is separate from the 1.5 inch thick steel containment vessel. The containment vessel and shield building are separated by a 4.5 foot annulus/hollow space. The shield building protects the containment vessel and the reactor from impact by external objects during extreme weather events such as tornadoes.
An opening was cut in the shield building and the containment vessel in 2011 for the replacement of the reactor vessel head. At the completion of those activities, the openings in the containment vessel and in the shield building were closed and the walls restored.
Restoration of the wall of the shield building involved replacing reinforcement steel bars (rebar) and pouring concrete that encased the rebar. The NRC will review the licensee's analysis of the implications of discovering the unfilled space near the top of the shield building opening.
NRC inspectors were immediately notified of this issue on February 14, 2014, and will closely monitor the plant's actions and analyses. Currently, NRC inspectors are on-site reviewing and conducting their own independent inspection activities associated with the licensee's replacement of the plant's steam generators. The NRC will supplement these inspectors as necessary to evaluate the licensee's current and planned analyses and corrective actions. The NRC will make sure the licensee corrects the issue and will thoroughly ex amine the licensee's repairs prior to restart of the plant.
PNO-III-14-003 This preliminary notification is issued for information only. State officials have been informed. The information presented herein has been discussed with the licensee and is current as of February 19, 2014, 6:25 a.m. (EDT).
ADAMS Accession Number: ML14050A026
CONTACT: David Hills, DRS 630/829-9733
Jamnes Cameron, DRP