PNO-II-81-115, on 811216,util Announced Cancellation of Units 3 & 4 Due to Drop in Forecasted Annual Load Growth,Customer Conservation & Improved Load Mgt Techniques

From kanterella
(Redirected from PNO-II-81-115)
Jump to navigation Jump to search
PNO-II-81-115:on 811216,util Announced Cancellation of Units 3 & 4 Due to Drop in Forecasted Annual Load Growth,Customer Conservation & Improved Load Mgt Techniques
ML20039B445
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 12/16/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-81-115, NUDOCS 8112230045
Download: ML20039B445 (1)


4 F

1 December 16, 1981 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE PN0-II-81-115 This preliminary notification constitutes EARLY notice of events of POSSIBLE safety or public interest significance.. The information is as initially received without verifi-cation or evaluation, and is basically all that is known by IE staff on this date.

FACILITY: Carolina Power and Light Company Licensee Emergency Cla lh /

al Evenh'0 Shearon Harris Units 3 and 4 Notification of 1

Docket Hos. 50-402 and 50-403 Alert Jcy #ISCOyg-New Hill, N. C.

Site Area Emer General Emerge ngr Not Applicable q DEC22198;3

~

X

SUBJECT:

CHANGE IN CONSTRUCTION PLANS

[O ~

4 CP&L announced today that its directors have approved cancellation of Un hand-4166 the Shearon Harris plant and a one-year extension of the estimated complet 42dAtVfor Unit 2.

Unit l's estimated completion date remains at 1985, while the date for Unit 2 is changed from 1988 to 1989, under the revised schedule.

The company announcement cited a drop in forecast annual load growth, conservation by customers and improved load management techniques as the basis for the decision.

Unit 1 is more than 50 percent complete, and Unit 2 is less than 10 percent complete.

Units 3 and 4 are now less than one percent complete.

Wide media interest is expected because of the CP&L announcement.

The NRC does not plan a press release. The State of North Carolina has been notified.

Region.II (Atlanta) received notification of this occurrence by telephone from the licensee at noon on December 16, 1981.

Contact:

R. C. Lewis, RII 242-5680 DISTRIBUTION:

H. St.

MNBB Phillips#.'06 E/W Willste Landow Chairman Palladino EDO NRR IE NiiSS OIA Comm. Gilinsky AEOD RES Comm. Bradford PA Air Rights f1 AIL:

Comm. Ahearne f1PA SP INP0 m uM: Doc. mgt. Tm Comm. Roberts ELD NSAC ACRS Applicable Resident Site). /7 SECY Regional Offices CA Applicable Utility 2,'79 USD0T/!1TB/Df1T-122.4 (as #pl511 cable)

$63

.r

/ O Q2 045 81121E PNO-II-81-115 PDR-

-