PLA-7050, Seismic Walkdown Report for Inaccessible Equipment - Unit 2, Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic
| ML13211A348 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/26/2013 |
| From: | Rausch T Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| PLA-7050 | |
| Download: ML13211A348 (2) | |
Text
Timothy S. Rausch Senior Vice President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3345 Fax 570.542.1304 tsrausch@pptweb.com ea..
ju( 2 ;ý, M13*
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION SEISMIC WALKDOWN REPORT FOR INACCESSIBLE EQUIPMENT - UNIT 2 REGARDING FUKUSHIMA NEAR-TERM TASK FORCE RECOMMENDATION 2.3: SEISMIC PLA-7050 Docket No. 50-388
References:
- 1) NRC Letter, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident,"
dated March 12, 2012.
- 2) PPL Letter (PLA-6941), "Response to Request for Information Pursuant to 10 CFR 50.54(t) Regarding Results of Seismic Walkdown," dated November 26, 2012.
On March 12, 2012, the NRC staff issued a letter entitled "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(0 Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," (Reference 1). Enclosure 2 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic Evaluations.
In Reference 2, PPL Susquehanna, LLC (PPL) provided the Seismic Walkdown Report for Unit 2 with a commitment to revise the report to include inaccessible equipment 60 days after the end of the Unit 2 Spring 2013 outage. This letter transmits the revised report.
PPL requests that Enclosure 1 to this letter be withheld under 10 CFR 2.390. The information contained in these enclosures represents security-related information as defined in 10 CFR 2.390.
No regulatory commitments are contained in this letter.
A-w (
V-A e1C Document Control Desk PLA-7050 If you have any questions regarding the content of this letter, please contact Mr. John L. Tripoli, Manager, Nuclear Regulatory Affairs, at (570) 542-3100.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on CT 7 T.
auc
'I-'L,-'
,2013. : Seismic Walkdown Report for Inaccessible Equipment - Unit 2 -
Security Related Information - Withhold Under 10 CFR 2.390 Copy:
P. W. Finney, NRC Sr. Resident Inspector J. A. Whited, NRC Project Manager L. J. Winker, PA DEP/BRP Region I Administrator, NRC