Text
Timothy S. Rausch Senior Vice President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3345 Fax 570.542.1504 tsrausch@pplweb.com 4f f
TM NOV 2 S 201Z U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR INFORMATION PURSUANT TO 10 CFR 50.54(f) REGARDING RESULTS OF SEISMIC WALKDOWN (REFERENCES 1 AND 2)
PLA-6941 Docket Nos. 50-387 and 50-388
References:
1)
NRC Letter, "Request for hIformation Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushiima Dai-Ichi Accident,"
dated March 12, 2012.
- 2) PLA-6881, "120-Day Response to NRC Letter, Request for information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Ternm Task Force Review of Insights from the Fukitshima Dai-lchi Accident, dated March 12, 2012."
On March 12, 2012, the NRC staff issued a letter entitled "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident," (Reference 1). Enclosure 2 of Reference 1 contains specific Requested Actions, Requested Information, and Required Responses associated with Recommendation 2.3 for Seismic Evaluations. In accordance with 10 CFR 50.54, "Conditions of Licenses," paragraph (f), addressees were requested to submit a written response to the information request within 90 days (Reference 2).
In Reference 2, PPL Susquehanna, LLC (PPL) committed to use the NRC-endorsed seismic walkdown procedure EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic," as the basis for the seismic walkdowns at the Susquehanna Steam Electric Station (SSES). PPL also committed to submit a report documenting the results of its seismic walkdowns at SSES within 180 days after NRC endorsement of the generic EPRI guidance, which occurred on May 31, 2012.
LI /
Document Control Desk PLA-6941 This letter provides SSES's Seismic Walkdown Reports as required by the response time depicted in Enclosure 3 of Reference 1. The format of the enclosed reports follow the format described in EPRI 1025286, "Seismic Walkdown Guidance: For Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic."
PPL requests that Enclosures 1 and 2 to this letter be withheld under 10 CFR 2.390. The information contained in these enclosuresrepresents security-related information as defined in 10 CFR 2.390. to this letter contains a list of regulatory commitments associated with this response.
If you have any questions regarding the content of this letter, please contact Mr. John L. Tripoli, Manager, Nuclear Regulatory Affairs, at (570) 542-3100.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 1 -CD
,2012.
T.
,Rausc : Seismic Walkdown Report - Unit 1 and Common - Security-Related Information - Withhold Under 10 CFR 2.390 : Seismic Walkdown Report - Security-Related Information - Withhold Under 10 CFR 2.390 : List of Regulatory Commitments Copy:
P. W. Finney, NRC Sr. Resident Inspector (w/o enclosures)
J. A. Whited, NRC Project Manager (w/o enclosures)
L. J. Winker, PA DEP/BRP (w/o enclosures)
Region I Administrator, NRC (w/o enclosures)
Document Control Desk PLA-6941 bc:
W. H. Bishop K. J. Cimorelli S. E. Davis J. R. Doxsey B. Drysdale R. J. Franssen J. M. Helsel A. T. Iliadis M. R. Mjaatvedt B. W. O'Rourke J. J. Petrilla III J. L. Tripoli NRA Files DCS NUCSB3 (w/o enclosures 1 and 2)
NUCSA4 (w/o enclosures 1 and 2)
NUCSA4 (w/o enclosures 1 and 2)
NUCSA4 (w/o enclosures 1 and 2)
NUCSB3 (w/o enclosures 1 and 2)
NUCSB3 (w/o enclosures 1 and 2)
NUCSB3 (w/o enclosures 1 and 2)
NUCSB3 (w/o enclosures 1 and 2)
GENPL5 (w/o enclosures 1 and 2)
NUCSA4 (w/o enclosures 1 and 2)
NUCSA4 (w/o enclosures 1 and 2)
NUCSA4 (w/o enclosures 1 and 2)
GENPL4 GENPL4 (w/o enclosures 1 and 2) to PLA-6941 List of Regulatory Commitments to PLA-6941 List of Regulatory Commitments Commitment Description Due Date NIMS Tracking Number Submit the revised Seismic Walkdown Report - Unit 1 and Within 60 1645994 Common, after the inaccessible equipment walkdowns are days after perfonned.
completion of the Unit 1 18th RIO.
Submit the revised Seismic Walkdown Report - Unit 2, Within 60 1645995 after the inaccessible equipment walkdowns are performed.
days after completion of the Unit 2 18t' RIO.
Evaluate the anchorage for the Unit 1 Battery Room 4/19/2013 1635211 Exhaust Fan.
Evaluate potential interaction concern with a valve stem 4/19/2013 1635222 protector of a Unit 1 RCIC Steam Supply Valve and a non-safety related junction box.
Evaluate the lack of full thread engagement for the Unit 1 4/26/2013 1636187 Standby Liquid Control Tank anchorage.
Evaluate the minimal clearance between the hoist attached 4/30/2013 1644105 to platform steel and the Unit 1 load center ( 1B240).