PLA-6542, Letter Evaluation of Steam Dryer Performance Based on Data Collected During Susquehanna Steam Electric Station (SSES) Unit 2 Power Ascension Up to 3733 Mwth

From kanterella
Jump to navigation Jump to search

Letter Evaluation of Steam Dryer Performance Based on Data Collected During Susquehanna Steam Electric Station (SSES) Unit 2 Power Ascension Up to 3733 Mwth
ML092170332
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 07/31/2009
From: Rausch T
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6542
Download: ML092170332 (3)


Text

Timothy S. Rausch PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3445 Fax 570.542.1504 tsrausch@pplweb.com PP mm-JLt 31M .

  • 4 4% S 4

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPl-17 Washington, DC 20555 SUSQUEHIANNA STEAM ELECTRIC STATION UNIT 2 OPERATING LICENSE NO. NPF-22 LICENSE CONDITION 2.C.(20)(a)3 PLA-6542 Docket No 50-388

Reference:

1) Letter, R. V. Guzman (NRC) to B. T. McKinney (PPL), "SusquehannaSteam Electric Station, Units I and 2 - Issuance of Amendment Regarding the 13-Percent Extended Power Uprate (TAC Nos. MD3309 and MD3310)," dated January30, 2008.

The purpose of this letter is to docket the attached evaluation of steam dryer performance based on data collected during Susquehanna Steam Electric Station (SSES) Unit 2 power ascension up to 3733 MWth (107% CLTP), which is the interim plateau in achieving the full Extended Power Uprate (EPU) operating conditions. The testing was completed on June 15, 2009 and this letter is a followup to the electronic submittal of the SSES Replacement Steam Dryer and Flow Induced Vibration Report to the SSES NRC Project Manager on July 31, 2009. The information contained herein is provided in accordance with the requirements of SSES Unit 2 license condition 2.C.(20)(a)3, (Reference 1).

License Condition 2.C.(20)(a) 3 requires:

"PPL shall hold the facility at each 3.5% ascension step to collect data from License Condition 2.C.(20)(a) and conduct plant inspections and walk-downs, and evaluate steam dryer performance based on the data; shall provide the evaluation to the NRC staff by facsimile or electronic transmission to the NRC project manager upon completion of the evaluation; and shall not increase power above each hold point until 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br /> after the NRC project manager confirms receipt of transmission."

Enclosure I contains the proprietary version of "SSES Replacement Steam Dryer and Flow Induced Vibration Report, Unit 2 Start-up, 107% Power Test Plateau." The information contained in Enclosure 1 satisfies this license condition for the 107% CLTP power ascension step. Based on an evaluation of the data collected, PPL concludes that the new Susquehanna dryer design possesses sufficient structural margin up to the full 3952 MWth EPU operating conditions (114% CLTP). The report also includes a k(UL/

Document Control Desk PLA-6542 summary of the results of main steam and feedwater piping and component monitoring and walkdowns.

The information in Enclosure 1 is proprietary as defined by 10CFR2.390. PPL, as the owner of the proprietary information, has executed the enclosed affidavit (Enclosure 3),

which identifies that the enclosed proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure. The proprietary information has been faithfully reproduced in the enclosed information such that the affidavit remains applicable. PPL hereby requests that the enclosed proprietary information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17.

The header of each page in Enclosure 1 carries the notation "PPL Proprietary Information." PPL proprietary information is identified inside triple brackets. { ((This sentence is an example. {2} In each case, the superscript notation 2) refers to Paragraph (2) of the PPL affidavit, which provides the basis for the proprietary determination. Specific information that is not so marked is not PPL proprietary. contains the non-proprietary version of "SSES Replacement Steam Dryer and Flow Induced Vibration Report, Unit 2 Start-up, 107% Power Test Plateau." contains the signed affidavit. If you have any questions or require additional information, please contact Mr. Duane L. Filchner at (610) 774-7819. I declare under penalty of perjury that the foregoing is true and correct. Executed on: 7-31-6 T. S. Rausch - Proprietary Version of "SSES Replacement Dryer and Flow Induced Vibration Report, Unit 2 Start-up, 107% Power Test Plateau" - Non-Proprietary Version of "SSES Replacement Dryer and Flow Induced Vibration Report, Unit 2 Start-up, 107% Power Test Plateau" - Affidavit

Document Control Desk PLA-6542 Copy: NRC Region I Mr. R. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. B. K. Vaidya, NRC Project Manager}}