PLA-6352, NRC Generic Letter 2008-01: Documentation of Extension Request
| ML081130679 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/11/2008 |
| From: | Mckinney B Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-08-001, PLA-6352 | |
| Download: ML081130679 (2) | |
Text
Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard a *n a g -
Berwick, PA 18603 *s*$$' -
Tel. 570.542.3149 Fax 570.542.1504 pp,%
btmckinney@pplweb.com -
- '** TM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION NRC GENERIC LETTER 2008-01: DOCUMENTATION OF EXTENSION REQUEST Docket Nos. 50-387 PLA-6352 and 50-388
Reference:
NRC Generic Letter 2008-01, "ManagingGas Accumulation in Emergency Core Cooling,Decay Heat Removal, and ContainmentSpray Systems,"
dated January 11, 2008.
Generic Letter 2008-01 (referenced above) requires submittal of a 3-month response if it is not deemed possible to meet the requested 9-month response date. During a teleconference between PPL (R. Sgarro) and NRC (J. Wermeil) on April 8, 2008, PPL requested an extension to the timeline for the 3-month response. The extension was requested based on:
" evolving expectations for the 9-month response;
- necessary engineering resources that are currently heavily involved in refueling outage completion and startup activities associated with extended power uprate; and
" the need for additional time to identify the actions, which will be completed both prior to and after the 9-month response date (October 11, 2008).
Based on the above Mr. Wermeil granted an extension of the 3-month response until May 30, 2008.
Any questions regarding this letter should be directed to Mr. Duane L. Filchner at (610) 774-7819.
Document Control Desk PLA-6352 I declare under penalty of perjury that the foregoing is true and correct.
Executed on: - c B. T. McKinney cc: NRC Region I Mr. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. B. K. Vaidya, NRC Project Manager
Text
Britt T. McKinney PPL Susquehanna, LLC Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard a *n a g -
Berwick, PA 18603 *s*$$' -
Tel. 570.542.3149 Fax 570.542.1504 pp,%
btmckinney@pplweb.com -
- '** TM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION NRC GENERIC LETTER 2008-01: DOCUMENTATION OF EXTENSION REQUEST Docket Nos. 50-387 PLA-6352 and 50-388
Reference:
NRC Generic Letter 2008-01, "ManagingGas Accumulation in Emergency Core Cooling,Decay Heat Removal, and ContainmentSpray Systems,"
dated January 11, 2008.
Generic Letter 2008-01 (referenced above) requires submittal of a 3-month response if it is not deemed possible to meet the requested 9-month response date. During a teleconference between PPL (R. Sgarro) and NRC (J. Wermeil) on April 8, 2008, PPL requested an extension to the timeline for the 3-month response. The extension was requested based on:
" evolving expectations for the 9-month response;
- necessary engineering resources that are currently heavily involved in refueling outage completion and startup activities associated with extended power uprate; and
" the need for additional time to identify the actions, which will be completed both prior to and after the 9-month response date (October 11, 2008).
Based on the above Mr. Wermeil granted an extension of the 3-month response until May 30, 2008.
Any questions regarding this letter should be directed to Mr. Duane L. Filchner at (610) 774-7819.
Document Control Desk PLA-6352 I declare under penalty of perjury that the foregoing is true and correct.
Executed on: - c B. T. McKinney cc: NRC Region I Mr. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. B. K. Vaidya, NRC Project Manager