|
---|
Category:Annual Operating Report
MONTHYEARPLA-8119, Submittal of 10 CFR 50.46 Emergency Core Cooling System (ECCS) Evaluation Model Annual Report, PLA-81192024-06-12012 June 2024 Submittal of 10 CFR 50.46 Emergency Core Cooling System (ECCS) Evaluation Model Annual Report, PLA-8119 PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 ML23163A1012023-06-12012 June 2023 10 CFR 50.46 Annual Report (Pla 8065) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-7947, 10 CFR 50.46 Annual Report (PLA-7947)2021-06-10010 June 2021 10 CFR 50.46 Annual Report (PLA-7947) PLA-7870, 10 CFR 50.46 Annual Report (PLA-7870)2020-06-10010 June 2020 10 CFR 50.46 Annual Report (PLA-7870) PLA-7770, CFR 50.46 Annual Report2019-06-10010 June 2019 CFR 50.46 Annual Report PLA-7752, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments2018-10-18018 October 2018 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments PLA-7713, Submittal of Emergency Core Cooling System Evaluation Model Annual Report2018-06-14014 June 2018 Submittal of Emergency Core Cooling System Evaluation Model Annual Report PLA-7606, Submittal of 10 CFR 50.46 - Annual Report2017-06-0707 June 2017 Submittal of 10 CFR 50.46 - Annual Report PLA-7475, Submittal of 10 CFR 50.46 - Annual Report2016-06-0707 June 2016 Submittal of 10 CFR 50.46 - Annual Report ML16141A1162016-05-10010 May 2016 Annual Radiological Environmental Operating Report PLA-7464 ML14134A2482014-05-13013 May 2014 Annual Radiological Environmental Operating Report, Attachment 1, Cover - Page 16 PLA-7000, Annual Report on Radiation Exposure Per 10 CFR 20.2206, PLA-70002013-04-28028 April 2013 Annual Report on Radiation Exposure Per 10 CFR 20.2206, PLA-7000 PLA-7001, Annual Environmental Operating Report (Non-Radiological) PLA-70012013-04-24024 April 2013 Annual Environmental Operating Report (Non-Radiological) PLA-7001 ML13220A0442013-04-0202 April 2013 Annual Report 2012 for PPL Susquehanna, LLC PLA-6853, 2011 Annual Radiological Environmental Operating Report2012-05-0808 May 2012 2011 Annual Radiological Environmental Operating Report PLA-6838, Annual Environmental Operating Report (Non-Radiological)2012-04-24024 April 2012 Annual Environmental Operating Report (Non-Radiological) PLA-6729, 10 CFR 50.46 - Annual Report2011-06-22022 June 2011 10 CFR 50.46 - Annual Report PLA-6718, Annual Environmental Operating Report (Non-Radiological) PLA-67182011-04-27027 April 2011 Annual Environmental Operating Report (Non-Radiological) PLA-6718 PLA-6601, Radioactive Effluent Release Report for 2009, Appendix a Through End2010-04-30030 April 2010 Radioactive Effluent Release Report for 2009, Appendix a Through End ML1011703042010-04-30030 April 2010 Radioactive Effluent Release Report for 2009, Cover Through Section 8 PLA-6604, Submittal of Annual Environmental Operating Report2010-04-26026 April 2010 Submittal of Annual Environmental Operating Report PLA-6522, Enclosure 2 - Allegheny Electric Cooperative, Inc., 2008 Annual Report2009-06-29029 June 2009 Enclosure 2 - Allegheny Electric Cooperative, Inc., 2008 Annual Report PLA-6508, Annual Radiological Environmental Operating Report for Calendar Year 20082009-05-12012 May 2009 Annual Radiological Environmental Operating Report for Calendar Year 2008 PLA-6182, Annual Radiological Environmental Operating Report for Calendar Year 2006 in Accordance with Technical Specification 5.6.22007-04-30030 April 2007 Annual Radiological Environmental Operating Report for Calendar Year 2006 in Accordance with Technical Specification 5.6.2 PLA-6185, 2006 Annual Environmental Operating Report (Nonradiological.)2007-04-20020 April 2007 2006 Annual Environmental Operating Report (Nonradiological.) PLA-5929, 10 CFR 50.46 - 30-Day and Annual Reports PLA-59292005-08-0202 August 2005 10 CFR 50.46 - 30-Day and Annual Reports PLA-5929 PLA-5890, 2004 Annual Environmental Operating Report (Non - Radiological)2005-04-28028 April 2005 2004 Annual Environmental Operating Report (Non - Radiological) PLA-5747, Annual Environmental Operating Report (Non-Radiological) PLA-57472004-04-27027 April 2004 Annual Environmental Operating Report (Non-Radiological) PLA-5747 PLA-5687, CFR 50.46 - Annual Report PLA-56872003-10-31031 October 2003 CFR 50.46 - Annual Report PLA-5687 PLA-5623, Annual Radiological Environmental Operating Report, Ambient Radiation Monitoring, Pages 18 - 522003-04-30030 April 2003 Annual Radiological Environmental Operating Report, Ambient Radiation Monitoring, Pages 18 - 52 ML19184A4041978-05-23023 May 1978 Environmental Monitoring Report, Er 100450 2024-06-12
[Table view] |
Text
Bryce L. Shrtver PPL Susquehanna, LLC Senior Vice President and 769 Salem Boulevard PI .
Chief Nuclear Officer Berwick, PA 18603 Tel. 570.542.3120 Fax 570.542.1504 blshriver pplweb.com OCT 3 1 2003 PPS I i' T U. S. Nuclear Regulatory Commission Attn: Document Control Center Mail Station OPI-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION 10 CFR 50.46 - ANNUAL REPORT Docket Nos. 50-387 PLA-5687 and 50-388
References:
- 1) Letterfrom G. T. Jones (PPL) to the U. S. NuclearRegulatory Commission, "10 CFR 50.46 Report - 30 Day reportandAnnual Report," dated November 12, 2002 (PLA-5553).
This report is being sent in accordance with 10 CFR 50.46 (a)(3)(ii). 10 CFR 50.46(a)(3)(ii) requires (in part) annual reporting of changes to or errors in evaluation models used for calculating Emergency Core Cooling System (ECCS) performance, and an estimate of their effect on the limiting ECCS analysis. Additionally, a proposed schedule is required for reanalysis or identification of other actions necessary to show compliance with 10 CFR 50.46 requirements.
The ECCS performance evaluation methodology applicable to both Susquehanna SES Unit 1 and Unit 2 is the Framatome-ANP EXEM/BWR LOCA Analysis. Since the submittal of the last annual 10 CFR 50.46 report (Reference 1), there have been no non-zero PCT changes reported to PPL Susquehanna, LLC. Thus, the current licensing basis PCT remains valid and no further actions are required. The annual reporting requirement is met by this letter.
PPL Susquehanna, LLC will continue to track future changes to the evaluation models used in the applicable LOCA analysis methods to ensure that the PCT values remain below the 10 CFR 50.46 limit, and to ensure that the 10 CFR 50.46 reporting requirements are met.
Please contact Mr. Rocco R. Sgarro, Manager - Nuclear Regulatory Affairs at (610) 774-7552, if there are any questions concerning this letter.
Sincerely,
,.U Q B. L. Shriver Copy: NRC Region I Mr. R. V. Guzman, NRC Project Manager Mr. S. Hansell, NRC Sr. Resident Inspector
)D\
Mr. R. Janati, DEP/BRP