Byron Open Phase condition pertains to an nuclear industry issue regarding a design vulnerability in the 4.16kV bus undervoltage protection scheme in that an Open Phase Condition (OPC) resulting in unbalanced three-phase currents (which can damage plant equipment) went undetected. Byron initiated ENS 47636. INPO generated Level 2 IER L2-12-14 and NRC generated IN 2012-03 and then Bulletin 2012-01. Issue is currently tracked as NEI Open Phase Condition (OPC) Initiative.
Byron Open Phase Condition (OPC) Issue
An automatic Reactor SCRAM at Byron station resulted from a design vulnerability in the 4.16 kV bus undervoltage protection scheme in that an Open Phase Condition (OPC) resulting in unbalanced three-phase currents (which can and did damage plant equipment) went undetected.
Topic |
|---|
|
|
| All by date | | | Start date | Site | Title |
|---|
| Inspection Manual Change Notice 26-007, TOC for Inspection Manual Change Notice 26-007 | 20 February 2026 | | TOC for Inspection Manual Change Notice 26-007 | | Inspection Manual Change Notice 26-004, TOC for Inspection Manual Change Notice 26-004 | 5 February 2026 | | TOC for Inspection Manual Change Notice 26-004 | | ML26034A001 | 3 February 2026 | Crane | Restart Inspection Activity Plan for Christopher M. Crane Clean Energy Center | | Inspection Manual Change Notice 26-003, TOC for Inspection Manual Change Notice 26-003 | 29 January 2026 | | TOC for Inspection Manual Change Notice 26-003 | | Inspection Manual Change Notice 26-001, Table of Contents for Inspection Manual Change Notice 26-001 | 15 January 2026 | | Table of Contents for Inspection Manual Change Notice 26-001 | | ML25342A446 | 15 December 2025 | Salem | Regulatory Audit Summary in Support of the NRC Staffs Review of LARs to Adopt TSTF-505 and 10 CFR 50.69 | | ML25262A058 | 12 December 2025 | Catawba | – Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 Epids L-2025-LLA-0155 and L-2025-LLA-0156) | | ML25322A260 | 2 December 2025 | Seabrook | Summary of Regulatory Audit in Support of License Amendment Request to Adopt Technical Specifications Task Force Traveler 505, Revision 2, EPID L-2025-LLA-0025 and EPID L-2025-LLA-0058) | | ML25268A010 | 21 November 2025 | Watts Bar | Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Time - RITSTF | | Inspection Manual Change Notice 25-033, Table of Contents for Inspection Manual Change Notice 25-033 | 20 November 2025 | | Table of Contents for Inspection Manual Change Notice 25-033 |
|
|---|