.,,dUKE DUKE Scott L. Batson ENERGYVice ENERGY.Oconee President NuclearStation Duke Energy ONOIVP 17800 Rochester Hwy 10 CFR 50.4 Seneca, SC 29672 ONS-2014-091 o: 864.873.3274 f 864.873.4208 Scoff.Batson@duke-energy.com July 7, 2014 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2746 Duke Energy Carolinas, LLC Oconee Nuclear Station (ONS), Units 1, 2, and 3 Docket Numbers 50-269, 50-270, and 50-287 Renewed Facility Operating License Numbers DPR-38, 47, and 55

Subject:

Completion of Protected Service Water System Milestone 3

Reference:

NRC letter to Duke Energy, "NOTICE OF VIOLATION AND CONFIRMATORY ORDER RELATED TO A FIRE PROTECTION PROGRAM LICENSE CONDITION (OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3)," dated July 1, 2013 The confirmatory order (Reference), related to an ONS fire protection program license condition, requires Duke Energy to report the completion of each milestone within 30 days of completion.

Duke Energy completed Milestone 3 on June 13, 2014. Milestone 3 requires Duke Energy to provide ONS the capability to supply electrical power from the PSW building switchgear to simultaneously operate at least one high-pressure injection pump per unit, and to operate the valves needed to align water flow to the reactor coolant pump seals and to inject water into the reactor coolant system, as an alternate path within the emergency operating procedures. The order requires this modification, along with approved plant procedures and the completion of operator training necessary to accomplish this lineup, and a combination of testing and engineering evaluation in accordance with station procedures which verifies this capability, to be completed and operational no later than October 1, 2014.

If there are any additional questions, please contact Terry Patterson, ONS Organizational Effectiveness, at (864) 873-3163.

I declare under penalty of perjury that the foregoing is true and correct. Executed on July 7, 2014.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station

Nuclear Regulatory Commission July 7, 2014 Page 2 cc:

Mr. Victor McCree, Regional Administrator U. S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 Mr. James R. Hall, Senior Project Manager (by electronic mail only)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852 Mr. Eddy Crowe Senior Resident Inspector Oconee Nuclear Site Ms. Susan E. Jenkins, Manager Radioactive & Infectious Waste Management Division of Waste Management South Carolina Department of Health and Environmental Control 2600 Bull St.