NUREG-1075, Forwards Questionnaire Re Licensee Perception of Regional Review of Licensing Actions.Response Requested as Part of Audit Required Per NUREG-1075

From kanterella
(Redirected from NUREG-1075)
Jump to navigation Jump to search
Forwards Questionnaire Re Licensee Perception of Regional Review of Licensing Actions.Response Requested as Part of Audit Required Per NUREG-1075
ML16256A728
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/24/1985
From: Stolz J
Office of Nuclear Reactor Regulation
To: Tucker H
DUKE POWER CO.
References
RTR-NUREG-1075 NUDOCS 8505090562
Download: ML16256A728 (5)


Text

.

April 24, 1985 Ohfi C>,

Dockets Nos. 50-269, 50-270 DISTRIBUTION and 50-287 (Docket File:

JPartlow NRC PDR ACRS-10 L PDR RIngram ORB#4 Rdg HNicolaras Mr. Hal B. Tucker HThompson Gray File Vice President - Nuclear Production OELD EBlackwood Duke Power Company EJordan HOrnstein P. 0. Box 33189 BGrimes 422 South Church Street Charlotte, North Carolina 28242

Dear Mr. Tucker:

SUBJECT:

QUESTIONNAIRE ON LICENSEE'S PERCEPTION OF REGIONAL REVIEW OF LICENSING ACTIONS The NRC Regions have been conducting technical review for the Office of Nuclear Reactor Regulation since mid-1982. NUREG-1075, "Decentralization of Operating Reactor Licensing Reviews", was published in July 1984 to better define the decision process for selecting items to be reviewed by the Regions.

This NUREG states that a formal audit of the program will be conducted in two years.

As part of our effort to audit our program, we have selected five licensees who would be requested, on a voluntary basis, to respond to a questionnaire.

These licensees, of which Oconee Nuclear Station, Units 1, 2 and 3 is one, have been selected on the basis that a large number of their licensing actions have been reviewed by the Regions. Enclosure 1 is the questionnaire.

We request your response as soon as it is possible but no later than 20 days from the date of this letter. Enclosure 2 is a list of all the licensing actions that have been performed by Region 2.

If you have any questions, please feel free to contact your project manager, Ms. Helen Nicolaras.

Sincerely, John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosures:

As Stated cc w/enclosures:

See next page OR

DL HNi o aras;cf JSt 4

85 4/

5 8505090562 650424 PDR ADOCK 05000269 P

PDR

Duke Power Company cc w/enclosure(s):

Mr. William L. Porter Office of Intergovernmental Relations Duke Power Company 116 West Jones Street P. 0. Box 33189 Raleigh, North Carolina 27603 422 South Church Street Charlotte, North Carolina 28242 Honorable James M. Phinney Heyward G. Shealy, Chief County Supervisor of Oconee County Bureau of Radiological Health Walhalla, South Carolina 29621 South Carolina Department of Health and Environmental Control 2600 Bull Street Regional Radiation Representative Columbia, South Carolina 29201 EPA Region IV 345 Courtland Street, N. E.

Atlanta, Georgia 30308 J. Michael McGarry, III, Esq.

Bishop, Liberman, Cook, Purcell & Reynolds 1200 17th Street, N. W.

Mr. J. C. Bryant Washington, D. C. 20036 Senior Resident Inspector U. S. Nuclear Regulatory Commission Route 2, Box 610 Manager, LIS Seneca, South Carolina 29678 NUS Corporation 2536 Countryside Boulevard Clearwater, Florida 33515 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division Pr. J. Nelson Grace, Regional Suite 220, 7910 Woodmont Avenue Administrator Bethesda, Maryland 20814 U. S. Nuclear Regulatory Commission, Reoion II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georaia 30303 Proposed Survey for Licensees Regarding Regional Review of Licensing Actions NRR is in the process of evaluating our program to have selected review activities carried out by personnel from within the Regional Offices. To that extent, we would appreciate your response to the below questionnaire.

Has the overall safe operation of your facility been enhanced by having selected licensing action technical reviews conducted in the Region? If so, how?

Have you been generally satisfied with the time response of licensing actions when Regional reviewers are involved?

Did improved communications between your staff and the NRC result from the Regional review process?

Has the Regional review process resulted in fewer technical disagree ments between your staff and the NRC over licensing actions?

Have you been generally satisfied with the types of licensing activities being reviewed in the Regions?

Can you suggest licensing actions that are not being reviewed in the Regions, that in your opinion, should be?

Can you identify any licensing actions that were reviewed in the Regions that, in your opinion, should have been reviewed by Headquarters?

Has the Regional review process brought pressures to bear that would not ordinarily be experienced from headquarters reviews; e.g., enforce ment concepts, etc.?

Would you say that the overall quality of the licensing review process has improved, stayed the same, or degenerated as a result of Regional involvement?

Title of Licensing TAC No.

MPA No.

Action Date 44180 Oconee 1 F03 Upgrading of RO and SRO 11/18/83 Training 44530 Oconee 1 F13 Training for Mitigating 11/18/83 Core Damage 47530 Oconee 1 Heatup and Cooldown Curve 03/11/83 Revision 47957 Oconee 1 F11 Plant Shielding 04/06/83 48354 Oconee 1 Emergency Power Switching 11/22/82 Logic 48954 Oconee 1 ISI Relief Request 02/14/84 49744 Oconee 1 B72 TMI Tech Spec Implementation 06/12/84 51894 Oconee 1 Hydrogen Ana. Penetration 09/13/84 T.S. Change 51897 Oconee 1 B. and PV Code T.S. Changes 08/27/84 52406 Oconee 1 ISI Relief Request 02/07/85 44181 Oconee 2 F03 Upgrading of RO and SRI 11/18/83 Training 44531 Oconee 2 F13 Training for Mitigating Core 11/18/83 Damage 47531 Oconee 2 Heatup and Cooldown Curve 03/11/83 Revision 47958 Oconee 2 F11 Plant Shielding 04/06/83 48355 Oconee 2 Emergency Power Switching 11/22/82 Logic 48955 Oconee 2 ISI Relief Request 02/14/84 49745 Oconee 2 B72 TMI Tech Spec Implementation 06/12/84 51895 Oconee 2 Hydrogen Ana. Penetration 09/13/84 T.S. change 51898 Oconee 2 B. and PV Code T.S. Changes 08/27/84

-2 Title of Licensing TAC No.

MPA No.

Action Date 52407 Oconee 2 ISI Relief Request 02/07/85 44182 Oconee 3 F03 Upgrading of RO and SRO 11/18/83 Training 44532 Oconee 3 F13 Training for Mitigating Core 11/18/83 Damage 47532 Oconee 3 Heatup and Cooldown Curve 03/11/83 Revision 47959 Oconee 3 F11 Plant Shielding 04/06/83 48356 Oconee 3 Emergency Power Switching 11/22/82 Logic 48956 Oconee 3 ISI Relief Request 02/14/84 49846 Oconee 3 B72 TMI Tech Spec Implementation 06/12/84 51896 Oconee 3 Hydrogen Ana. Penetration 09/13/84 T.S. Chg.

51899 Oconee 3 B. and PV. Code T.S. Changes 08/27/84 52408 Oconee 3 ISI Relief Request 02/07/85