Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Skagit, Marble Hill, Crane
Issue date: 12/16/1983
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
GL-83-041, NUDOCS 8312160274
Download: ML031080574 (1)


Ad °UNITED STATES

0 aNUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 December 16, 1983 TO ALL LICENSEES OF OPERATING REACTORS

Gentlemen:

SUBJECT: FAST COLD STARTS OF DIESEL GENERATORS

(Generic Letter 83-41)

Widespread concern has been expressed by the industry that fast cold start surveillance testing of diesel generators (i.e., starts with rapid acceleration and loading without prelubrication and warmup) may result in premature diesel engine degradation. The NRC staff is also concerned about the possible deleterious effects of fast cold starts on diesel generators. However, we require additional information about the extent and effects of this practice before we can make a determination as to whether the number of fast cold starts should be reduced.

Accordingly, we are requesting your voluntary participation in providing responses to the following questions:

1. How many times in the past year (December 1, 1982 to December 1, 1983)

have your emergency diesel generators been subjected to a fast cold start (without prelubrication and warmup of any moving parts of the diesel generators)? Provide your data on a per machine basis, for each of the following three categories: (a) surveillance testing, (b) maintenance activates, and (c) actual demands.

2. What is your assessment of the effects of frequent fast cold starts on diesel generator reliability and availability? Do you believe that they- significantly degrade reliability and availability?

This request for information was approved by the Office of Management and Budget under clearance number 3150-0011 which expires April 30, 1985. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management Room 3208, New Executive Office Building, Washington, D. C.

20503.

As the results of this effort will be used to make selected licensing decisions, we request your responses be received by the staff prior to January 6, 1984.

The results of this and other efforts will be factored into our diesel gener- ator reliablity program. Your participation in this data collection effort is appreciated.

-,4'U ilk r a: .

m 8 k.L.t t'.tt # 166 Darrell G. El enhut, Director Division of Licensing

)